Murielle Baril schreef:
Bonjour! J'étais un peu saturée avec les patrons de pantoufles...puis, euréka! j'ai trouvé ces patrons de chaussettes!!! En plus un vidéo pour aider à bien saisir le patron!!! C'est super, un gros merci.
07.03.2015 - 21:11
Heather schreef:
Your comment box won't allow me to send a link is there an email address I can send the link to.
04.03.2015 - 08:34DROPS Design antwoorde:
Dear Heather, sure please send to france@garnstudio.com - thank you !
04.03.2015 - 09:29
Heather schreef:
Someone is using this pattern and selling the finished product, who do I tell about this?
01.03.2015 - 09:42DROPS Design antwoorde:
Dear Heather, selling finished products from our patterns is allowed - see copyright rules below pattern - If there is no reference to the orignal pattern, please give us the link to check. Thank you !
02.03.2015 - 10:01Annette Uys schreef:
I would like to knit socks and would like to know the thickness of the yarn GROUP E. for in South Africa we only know yarns thickness by 4-ply, Double knit, Chunky etc. I want to knit Red Riding Hood socks from your pattern. Thanking you
18.02.2015 - 08:24DROPS Design antwoorde:
Dear Mrs Uys, please click here to read more about category of each yarn in group E and here to find worldwide shipping DROPS Stores. Happy knitting!
18.02.2015 - 09:45
Mélanie schreef:
Tricoter un autre chausson identique, en veillant à ce que l'ouverture de la jambe soit de l'autre côté. le patron a pas un chaussons dauche et un droite ? Tricoté
03.02.2015 - 04:15DROPS Design antwoorde:
Bonjour Mélanie, ce qui va déterminer le chausson gauche du droit, c'est la façon dont vous allez coudre la bordure avec les torsades, veillez bien à ce qu'elles soient bien ouvertes chacune sur l'extérieur de chacun des chaussons. Bon tricot!
03.02.2015 - 09:57Sharon schreef:
I am knitting the foot but not sure how to distribute the stitches over needles once you cast on 12 stitches on each side. Are the 9 stitches from the foot added to the 12 picked up stitches on the side? And then the stitches from the 3 rd needle added to the 12 stitches on the other side? After that, I am not sure where to place the markers.
02.02.2015 - 21:58DROPS Design antwoorde:
Dear Sharon, the video below shows how to work the slipper, ie how to pick up the 12 sts eah side of the middle part worked back and forth and then continue in the round. Happy knitting!
03.02.2015 - 09:36
Chelsea schreef:
The picture shows what looks like two separate parts for the top and sides of the foot, as the pieces are going in different directions. But following the pattern, it comes out looking nothing like the picture.
01.02.2015 - 02:21DROPS Design antwoorde:
Dear Chelsea, the video below shows how to work the slippers, it should help you to visualize how you will work them. Happy knitting!
02.02.2015 - 12:39Maria schreef:
Se puede tejer solo con agujas rectas
27.01.2015 - 21:11DROPS Design antwoorde:
Hola María, la parte de arriba se puede tejer con ag rectas. La parte de abajo se trabaja en redondo por lo que necesitarías ag circular o ag de doble punta. Si quieres trabajar sólo con ag rectas debes modificar el patrón para trabajar con una costura en la parte de detrás de la bota.
04.02.2015 - 20:02Liz schreef:
Donde puedo encontrar estos hilos en Perú
26.01.2015 - 21:48DROPS Design antwoorde:
Hola Liz, me temo que en Perú de momento no hay tiendas de DROPS. Puedes mirar en el apartado tiendas en la parte de arriba de la página, junto a Tips y ayuda. Sólo hay tiendas físicas en EEUU y Canada. Ahí tienes listadas las alternativas de tiendas online en las que las puedes pedir.
27.01.2015 - 10:58
Carole Dargavel schreef:
Hi, I've knitted the boot no problems. Tks for the pattern. I've started the loose leg and was wondering on the Diagram, do I only do the cable work on the 3rd row on on every row? Thanks
21.01.2015 - 03:01DROPS Design antwoorde:
Dear Mrs Dargavel, in A.1, 1 square = 1 st x 1 row, start on the bottom corner on the right side and read towards the left (on 1st row and on every row from RS), from WS, read diagram from the left towards the right. You will then make the 1st cable on 3rd row, then every 8th row (after you have worked the diagram 1 time in height, start again on row 1 in diagram). Happy knitting!
21.01.2015 - 13:25
Little Red Riding Slippers#littleredridingslippers |
|||||||||||||
|
|||||||||||||
Gebreide DROPS sloffen met kabels van ”Snow”. Maat 35-42
DROPS 150-4 |
|||||||||||||
RIBBELST (heen en weer gebreid op de nld): brei alle nld recht. 1 ribbel = 2 nld r. RIBBELST (in de rondte op breinld zonder knop): * brei 1 nld recht en brei 1 nld av *, herhaal van *-*. 1 ribbel = 2 nld. PATROON: Zie telpatroon A.1. Het telpatroon geeft de goede kant van het werk weer. Zowel de heengaande als de teruggaande naalden zijn weergegeven. -------------------------------------------------------- SLOFFEN: PIJP: Zet 36-38-40 st op met breinld zonder knop 6 mm en Snow. Brei in RIBBELST in de rondte - zie uitleg boven - tot het werk ongeveer 4 cm meet en eindig na 1 nld av. VOET: Houd nu de eerste 9-11-11 st op de nld, zet de overgebleven 27-27-29 st op 1 hulpdraad. Ga verder in ribbelst heen en weer over de 9-11-11 st – zet TEGELIJKERTIJD in de 1e nld 1 nieuwe st op aan elke kant (kant st) = 11-13-13 st. Kant bij een hoogte van 7-8.5-10 cm 1 kant st af aan elke kant = 9-11-11 st. Zet dan de st van de hulpdraad terug op de nld en neem 12-14-16 st op aan elke kant van het middelste deel (naast de kant st) = 60-66-72 st op de nld. MEET NU HET WERK VANAF HIER. Plaats 1 markeerder middenvoor voor de teen en 1 markeerder middenachter voor de hiel. Ga verder in de rondte in ribbelst. Brei bij een hoogte van 2 cm, 2 st r samen aan elke kant van elke markeerder om de nld (= 4 st geminderd per nld) en ga verder met minderen tot het werk 5-5-6 cm meet – kant alle st af. Naai naad midden onder voet samen – naai in buitenste st om een dikke naad te voorkomen. MANCHET MET KABELS: Zet 22 st op met nld 6 mm en Snow. Brei 1 ribbel in ribbelst en meerder in de laatste nld 6 st gelijkmatig = 28 st. Brei volgens A.1 (= 28 st) tot het werk ongeveer 32-33-35 cm meet en minder in de laatste nld 3 st over elke kabel in A.1 = 22 st. Brei 1 ribbel in ribbelst en kant alle st af. Leg opzetrand over afkantrand en naai 3 knopen op de manchet ter decoratie. Schuif manchet 2 cm naar beneden over pijp van slof met knopen aan buitenkant van slof en naai manchet aan opzetrand van slof aan de verkeerde kant met onzichtbare kleine steken. Brei nog een slof op dezelfde manier en zorg dat de opening van de manchet aan de andere kant is. |
|||||||||||||
Uitleg van het telpatroon |
|||||||||||||
|
|||||||||||||
![]() |
|||||||||||||
Heeft u dit patroon gemaakt?Tag dan uw afbeeldingen met #dropspattern #littleredridingslippers of stuur ze naar de #dropsfan galerij. Heeft u hulp nodig voor dit patroon?U vind 18 instructievideo's, een commentaar/vragengedeelte en nog veel meer, als u naar het patroon gaat op garnstudio.com © 1982-2025 DROPS Design A/S. Alle rechten voorbehouden. Op dit document, inclusief alle subdocumenten, rust copyright. Lees meer over wat u kunt doen met onze patronen onderaan elk patroon op onze site |
Laat een opmerking achter voor DROPS 150-4
Wij horen graag wat u vindt van dit patroon!
Wilt u een vraag stellen, kies dan de juiste categorie in het formulier hieronder om sneller een antwoord te krijgen. Verplichte velden zijn gemarkeerd met een *.