Kristine wrote:
Strikkes denne med enkelt eller dobbelt garn?
07.03.2021 - 19:44DROPS Design answered:
Hei Kristine, Denne jakken er strikket med enkelt garn. God fornøyelse!
08.03.2021 - 07:11
Rita Brobak Sørensen wrote:
Jeg synes der er rigeligt med garn, skulle tro den skal strikkes med dobbelt garn????
05.08.2020 - 18:03DROPS Design answered:
Hej Rita, Vi skal se på garnforbruget igen. :)
06.08.2020 - 08:28
Ina wrote:
Liebes Drops Team, obwohl ich mich genau an die angegebene Garnmenge und an die Anleitung gehalten habe, bleibt gut die Hälfte des Garnes übrig. War es für 2- fädiges Stricken berechnet? Das ist ärgerlich, weil ich es nicht zurückgeben kann.
10.07.2020 - 16:24
Sandra Janssen wrote:
Dag, Ik brei liever niet in gerstekorrel maar wil wel graag dit model maken in gewone tricotsteek. Moet ik aanpassingen doen in aantal steken en hoeveelheid garen?
01.06.2020 - 16:21DROPS Design answered:
Dag Sandra,
Nee, tricotsteek heeft ongeveer dezelfde stekenverhouding als gerstekorrel, dus je kunt gewoon het patroon volgen.
05.06.2020 - 12:16
Malene Holm Patzer wrote:
Hej. Modellen er skøn, men jeg ønsker ikke at strikke den i perlestrik, vil det påvirke størrelsen meget? Tak:-)
23.03.2020 - 10:35DROPS Design answered:
Hei Malene. Strikkefastheten i denne oppskriften er oppgitt til 15 masker i bredden og 24 pinner i høyden med perlestrikk = 10 x 10 cm på pinne nr 6. Det er en annen strikkefasthet ved glattstrikk (færre pinner i høyden), så ja, det vil påvirke størrelsen og de oppgitte målene i oppskriften. mvh DROPS design
23.03.2020 - 16:26
Mummi wrote:
What is the total amount of yarn used here? Planning to make this jacket single-coloured.
19.11.2019 - 16:25DROPS Design answered:
Dear Mummi, depending on the size, this jacket needs 150-230 grammof Brushed Alpaca silk yarn. Forother substitution please use our yarn converter here. Happy Knitting!
20.11.2019 - 02:51
Margrethe Mogensen wrote:
Undrer mig over garnforbruget. Skulle den have været strikket med dobbelt garn?
15.04.2019 - 17:25DROPS Design answered:
Hej Margrethe, Modellen strikkes ret løst med enkelt tråd. Husk at DROPS Brushed Alpaca Silk ligger i 25 g/nøgle. God fornøjelse!
03.05.2019 - 10:25
DROPS Design wrote:
Colour alternatives shown are: A) DROPS Brushed Alpaca Silk 08, 01, 09, 12, 04. B) DROPS Brushed Alpaca Silk 04, 01, 14, 02, 05. C) DROPS Brushed Alpaca Silk 15, 01, 05, 13, 17.
07.03.2019 - 09:32
Sahar Taha wrote:
You are great and l follow you for many years so can l make a point please if l want to knit jumper on needle e .g 6can you make a category on the search where I can write'jumper on needle 6. " then all jumper made of needle 6 appear and we can choose among them . Thanks again
06.03.2019 - 08:12DROPS Design answered:
Dear Sahar, needles size is different for everyone as knitting tensione is different. You can search by yarn group, i.e. Knitting tension. You can make a swatch with the needles and yarn you want to use and then you can search by The tension you'll reach. Happy crafting!
06.03.2019 - 09:24
Margit wrote:
Liebes Drops-Team, wird für dieses Modell die Anleitung noch zur Verfügung gestellt? Man hat nur Einsicht auf den Materialbedarf und auf die Modellzeichnung. Liebe Grüße Margit
12.02.2019 - 16:50DROPS Design answered:
Liebe Margit, ja sicher, die deutsche Anleitung wird bald hochgeladen, danke für den Hinweis. Viel Spaß beim stsricken!
13.02.2019 - 08:57
Mardi Gras Jacket#mardigrasjacket |
|
![]() |
![]() |
Knitted jacket with balloon sleeves, V-neck and stripes in DROPS Brushed Alpaca Silk. Sizes: S-XXXL
DROPS 201-21 |
|
------------------------------------------------------ EXPLANATIONS FOR THE PATTERN: ------------------------------------------------------- MOSS STITCH (worked in the round): Round 1: * Knit 1, purl 1*, repeat from *-*. Round 2: Knit over purl and purl over knit. Repeat round 2 onwards. MOSS STITCH (worked back and forth): Row 1: * Knit 1, purl 1 *, repeat from *-*. Row 2: Knit over purl and purl over knit. Repeat row 2 onwards. STRIPES BODY: Work 12-12.5-13-13,5-13.5-14 cm = 4¾"-4⅞"-5⅛"-5¼"-5¼"-5½" light grey green, 12-12.5-13-13-14-14.5 cm = 4¾"-4⅞"-5⅛"-5⅛"-5½"-5⅝" off-white, 12-12.5-13-13,5-13.5-14 cm = 4¾"-4⅞"-5⅛"-5¼"-5¼"-5½" powder pink and then finish with denim blue = 12-12.5-13-13-14-14.5 cm = 4¾"-4⅞"-5⅛"-5⅛"-5½"-5⅝". STRIPES SLEEVES: Work 4.5 cm = 1¾" off-white, 3 cm = 1⅛" curry, 4.5 cm = 1¾" off-white, 3 cm = 1⅛" curry, 4.5 cm = 1¾" off-white and 3 cm = 1⅛" curry. BANDS ON FRONT PIECES: The outermost 6 stitches towards mid front = bands. Work as follows: Knit the 5 outermost stitches towards mid front on all rows and the 6th stitch is worked in stocking stitch seen from the right side. DECREASE TIP-1: Decrease only from the right side, inside the bands towards mid front as follows: Knit 5, slip the next stitch as if to knit, knit 1 and pass the slipped stitch over the knitted stitch (= 1 stitch decreased). DECREASE TIP-2: Decrease only from the right side, inside the bands towards mid front as follows: Work moss stitch until there are 7 stitches left on row. Decrease 1 stitch by knitting together the 7th and 6th stitch. Knit the remaining 5 stitches. DECREASE TIP-3: Knit together the 3 middle stitches under the sleeve (= 2 stitches decreased). INCREASE TIP-1: Work 2 stitches in 1 stitch as follows: Work 1 stitch but do not slip this stitch off the left needle, work 1 more stitch in same stitch - working in the back loop this time = 1 stitch increased. INCREASE TIP-2: (evenly spaced at bottom of sleeve): To work out how to increase evenly, count the total number of stitches on the needle (e.g. 44 stitches) and divide by the number of increases to be made (e.g. 20) = 2.2. In this example, increase by making 1 yarn over after approx. each 2nd stitch. On the next round knit the yarn overs to leave a small hole. BUTTONHOLES (bottom up): Work buttonholes on right band. 1 BUTTONHOLE = Bind off the 3rd and 4th stitch from the edge. On the next row cast on 2 new stitches over the bind-off stitches. Work buttonholes when the piece measures approx.: S: 1, 10, 19 and 28 cm = ⅜", 4", 7½" and 11" M: 1.5, 10.5, 19.5 and 28.5 cm = ½", 4⅛", 7¾" and 11⅛" L: 1, 10.5, 20 and 29.5 cm = ⅜", 4⅛", 8" and 11½" XL: 1, 11, 21 and 31 cm = ⅜", 4⅜", 8¼" and 12¼" XXL: 1, 11, 21 and 31 cm = ⅜", 4⅜", 8¼" and 12¼" XXXL: 1.5, 11.5, 21.5 and 31.5 cm = ½", 4½", 8½" and 12⅜" BINDING-OFF TIP: To avoid the bind-off edge being tight you can bind off with a larger size needle; or make 1 yarn over after approx. each 8th stitch at the same time as binding off ( yarn overs bind off as normal stitches). ------------------------------------------------------ START THE PIECE HERE: ------------------------------------------------------- JACKET - SHORT OVERVIEW OF THE PIECE: Front and back pieces are worked separately, back and forth with circular needle and bottom up. The sleeves are worked in the round with double pointed needles or short circular needle, bottom up. BACK PIECE: Cast on 66-72-78-86-94-104 stitches with circular needle size 4 mm = US 6 and curry. Work rib ( = knit 1, purl 1) for 4-4-4-5-5-5 cm = 1½"-1½"-1½"-2"-2"-2". Change to circular needle size 6 mm = US 10 and light grey green and continue with MOSS STITCH – read description above – AT THE SAME TIME as you work STRIPES BODY – read description above. REMEMBER THE KNITTING GAUGE! When the piece measures 35-36-37-38-39-40 cm = 13¾"-14¼"-14½"-15"-15¼"-15¾" increase 1 stitch on each side for sleeve-seams – read INCREASE TIP-1 = 68-74-80-88-96-106 stitches. When the piece measures 46-48-50-52-54-56 cm = 18"-19"- 19¾"-20½"-21¼"-22" work garter stitch over the middle 38-38-40-40-42-42 stitches; the remaining stitches are continued in moss stitch as before. When the piece measures 48-50-52-54-56-58 cm = 19"-19¾"-20½"-21¼"-22"-22¾" bind off the middle 26-26-28-28-30-30 stitches and each shoulder is finished separately = 21-24-26-30-33-38 stitches on each shoulder. Continue with garter stitch over the outermost 6 stitches towards the neck and moss stitch over the other stitches. When the piece measures 52-54-56-58-60-62 cm = 20½"-21¼"-22"-22¾"-23⅝"-24⅜" loosely bind off with knit over knit and purl over purl. Work the other shoulder in the same way. RIGHT FRONT PIECE: When working the right front piece you also work buttonholes on the band – read description above. Cast on 39-42-45-49-53-58 stitches (including 6 band stitches) with circular needle size 4 mm = US 6 and curry. Work rib (= knit 1, purl 1) for 4-4-4-5-5-5 cm = 1½"-1½"-1½"-2"-2"-2" at the same time as you work BANDS – read description above. After the rib is finished, change to circular needle size 6 mm = US 10, light grey green and work MOSS STITCH, STRIPES BODY and BANDS onwards. When the piece measures 28-29-30-31-31-32 cm = 11"-11⅜"-11¾"-12¼"-12¼"-12½" start to decrease to V-neck: Decrease 1 stitch every 1 cm a total of 19-19-20-20-21-21 times - read DECREASE TIP-1 = 20-23-25-29-32-37 stitches on needle - AT THE SAME TIME, when the piece measures 35-36-37-38-39-40 cm = 13¾"-14¼"-14½"-15"-15¼"-15¾" increase 1 stitch for the sleeve-seam, outermost towards the armhole - read INCREASE TIP-1 = 21-24-26-30-33-38 stitches. When the piece measures 52-54-56-58-60-62 cm = 20½"-21¼"-22"-22¾"-23⅝"-24⅜" loosely bind off with knit over knit and purl over purl - read BINDING-OFF TIP above. LEFT FRONT PIECE Work as for right front piece, but without buttonholes and with the band at the other end of the row. At V-neck, read DECREASE TIP-2. SLEEVE: Cast on 36-38-40-42-44-46 stitches with double pointed needles size 4 mm = US 6 and curry. Work rib ( = knit 1, purl 1) for 4-4-4-5-5-5 cm = 1½"-1 1/2-1½"-2"-2"-2". Change to double pointed needles size 6 mm = US 10 and off-white and knit 1 round, AT THE SAME TIME as you increase 24-22-22-22-20-20 stitches evenly spaced – read INCREASE TIP-2 = 60-60-62-64-64-66 stitches. Continue with MOSS STITCH and STRIPES SLEEVES – read description above. When STRIPES SLEEVES are finished continue with off-white to finished length. When the piece measures 25-25-25-25-25-25 cm = 9¾"-9¾"-9¾"-9¾"-9¾"-9¾" decrease 2 stitches mid under sleeve - read DECREASE TIP-3, repeat this decrease every 4-6-5-5-0-0 cm = 1½"-2⅜"-2"-2"-0"-0" a total of 4-3-2-2-0-0 times = 52-54-58-60-64-66 stitches. Continue working until the piece measures 52-52-51-49-47-45 cm = 20½"-20½"-20"-19¼"-18½"-17¾" (shorter measurements in larger sizes due to broader shoulders) and then loosely bind off the remaining stitches with knit over knit and purl over purl - read BINDING-OFF TIP. Work the other sleeve in the same way. ASSEMBLY Sew the pieces together in the outermost loop of the outermost stitch so the seams are flat - the bands on each front piece are sewn to the garter stitch along the neck on the back piece. Sew sleeves to body inside the 1 edge stitch on the front and back pieces. Sew buttons onto left band. |
|
![]() |
|
Have you finished this pattern?Tag your pictures with #dropspattern #mardigrasjacket or submit them to the #dropsfan gallery. Do you need help with this pattern?You'll find 24 tutorial videos, a Comments/Questions area and more by visiting the pattern on garnstudio.com. © 1982-2025 DROPS Design A/S. We reserve all rights. This document, including all its sub-sections, has copyrights. Read more about what you can do with our patterns at the bottom of each pattern on our site. |
Post a comment to pattern DROPS 201-21
We would love to hear what you have to say about this pattern!
If you want to leave a question, please make sure you select the correct category in the form below, to speed up the answering process. Required fields are marked *.