Jeanette Ek wrote:
Hej! Jag får inte ihop 7 varvet på rapportera A.19-A.21 På varje sida blir det 177maskor innan man ska starta rapporten A.19 När jag stickat hela raden får jag 2maskor över?? Vad gör jag för fel???
05.05.2024 - 18:58DROPS Design answered:
Hei Jeanette. Når du strikker rad 7 til 11 (+ rad 23 og 24), "mister" A.19 2 masker, men disse ser du nå i diagram A.20 og A.21. Bruk maskemarkører mellom hvert diagram så har du en bedre oversikt. mvh DROPS Design
06.05.2024 - 13:20
Natalia wrote:
Dzień dobry, Czy chustę tę można w jakiś sposób powiększyć? :)
28.03.2023 - 18:05DROPS Design answered:
Witaj Natalio, oczywiście. Należy powtarzać sekwencję wzoru wg schematów A.4-A.6 przez cały rząd. Pozdrawiamy!
29.03.2023 - 08:12
Céline wrote:
Bonjour, À l’aide svp? Quelqu’un pourrait-il me dire : 1) Combien de metre/verge de fils nécessaire pour le châle Lemon Heart Drop 200-19? 2) Et à quoi correspond le fils demandé : DROPS BABYALPACA SILK de Garnstudio (appartient au groupe de fils A) 250 g ? Est-ce grosseur fingering pour les bas? ou Lace pour dentelle ? ou plus gros ? Est-ce comparable au fil de Laine en folie (65% merino, 15%soie,20%bambou) qui donne 350 mètres pour 100 grammes ? MERCI
14.12.2022 - 00:34DROPS Design answered:
Bonjour Céline, retrouvez toutes les caractéristiques de DROPS BabyAlpaca Silk dans son nuancier - toutefois, cette laine n'est plus disponible, vous pouvez alors utiliser notre convertisseur pour voir les alternatives possibles - demandez conseil à votre magasin DROPS - nous ne connaissons pas l'autre marque, eux peut être. Bon tricot!
14.12.2022 - 08:11
Marie wrote:
Bonjour, Je rencontre un petit problème au niveau du modèle, quand j'arrive à l'avant dernière augmentation de A1/A3 j'arrive à 85 mailles, hors je doit encore augmenter 4 mailles, alors que quand j'ai terminer normalement je doit être a 87 mailles. Merci
16.10.2022 - 04:41DROPS Design answered:
Bonjour Marie, vérifiez bien votre nombre de mailles dans chaque diagramme, vous devez bien augmenter 1 m dans chaque A.1 et chaque A.3 jusqu'au 13ème rang des diagrammes où vous augmenterez alors 2 m dans chaque A.1 et toujours 1 m dans A.3 pour avoir 10 m dans chaque A.1 et 9 m dans chaque A.2 et ainsi 87 m au total. Bon tricot!
17.10.2022 - 09:56
Doesjka Meijer wrote:
Bij de eerste toer van A.5 moet je tot 8 steken vóór de middensteek breien, maar bij mij zijn dat 10 steken. Wat moet ik met die “te vele” steken doen?? Vriendelijke groet en dank voor de aandacht, Doesjka Meijer
02.08.2022 - 09:38DROPS Design answered:
Dag Doesjka,
Je zou 8 steken over moeten hebben voor de middelste steek na 4 herhalingen van A.5 in de breedte. Kan het zijn dat er ergens een foutje in is geslopen?
06.08.2022 - 11:47
Lina Falk wrote:
Hej! Jag får inte till ökningarna efter diagram A1-A3. Jag har 57 maskor efter starten. Sen när jag ska öka enligt diagrammen så blir det inte rätt. Vad jag ser så är det 7m×2 =14 totalt på vänster sida sett från rätsidan. Och 7m+8m = 15 maskor på höger sida sett från rätsidan. 57+14+15=86 maskor inte 87 som det står att det ska vara. Vad är det jag missar?
15.11.2021 - 13:13DROPS Design answered:
Hej Lina. Du stickar A.1 2 gånger på varvet och A.3 2 gånger på varvet (både A.1 och A.3 stickas på båda sidor av mittmaskan). I A.1 har du totalt 8 ökade maskor när diagrammet stickas färdigt, 1 A.3 har du totalt 7 ökade maskor när diagrammet stickats färdigt. Dvs totalt 8+7+8+7= 30 m ökade. 57+30=87 m. Mvh DROPS Design
16.11.2021 - 09:45
Eliza wrote:
Dzień dobry... W opisie pisze, że po oczku środkowym trzeba robić schematy od początku np A1-A3 ale wydaje mi się, że powinno być odbicie lustrzane czyli po oczku środkowym schematy powinny iść np. A3-A1 . I czy jeżeli w pierwszej połowie było zamykanie oczek na prawo to czy w drugiej nie powinno się zamykać oczek w drugą stronę?
09.09.2021 - 15:26DROPS Design answered:
Witaj Elizo, wszystko jest w porządku, przerabiaj dokładnie tak jak jest napisane w opisie. Oczka są dodawane na bokach szala i z obu stron oczka środkowego, dzięki temu kształt szala będzie odpowiedni. Powodzenia!
10.09.2021 - 10:03
Lisianne RICHARD wrote:
Bonjour, je voudrais savoir si les diagrammes du châle 200-19 sont bons car il y a eu une correction, je vous remercie amitiés
14.08.2021 - 08:56DROPS Design answered:
Bonjour Lisianne, les diagrammes ont ete corriges et ils sont bons. Bon tricot!
15.08.2021 - 20:36
Jørgine Karlsen wrote:
Jeg har problemer med at strikke i slutningen af 10-12 er der fejl?
27.07.2021 - 16:19DROPS Design answered:
Hej, det skal der ikke være... hvilken pind i diagrammet får du ikke til at stemme?
05.08.2021 - 13:33
Agnieszka wrote:
Dzień dobry. Moje pytanie dotyczy dwóch ostatnich rzędów, czyli zakończenia. Jeden rząd na prawo z dodawaniem oczek a później jeden rząd na prawo na lewej stronie robótki i powtórzyć. Czy ten rząd na prawo przerabiany na lewej stronie robótki ma mieć oczko środkowe robione dżersejem czy już nie? Nie ma informacji o tym w instrukcji.
25.04.2021 - 01:02DROPS Design answered:
Witaj Agnieszko, rząd na prawo przerabiany na lewej stronie robótki nie ma już oczka środkowego przerabianego inaczej. Pozdrawiamy!
26.04.2021 - 08:32
Lemon Heart#lemonheartshawl |
||||||||||||||||||||||
![]() |
![]() |
|||||||||||||||||||||
Knitted shawl in DROPS BabyAlpaca Silk. The piece is worked top down with lace pattern and garter stitch.
DROPS 200-19 |
||||||||||||||||||||||
------------------------------------------------------- EXPLANATIONS FOR THE PATTERN: ------------------------------------------------------- RIDGE/GARTER STITCH (worked back and forth): Knit all rows. 1 ridge in height = Knit 2 rows. INCREASE TIP: Increase by making yarn overs, which are knitted on next row to leave holes. PATTERN: See diagrams A.1 to A.21. The diagrams show all the rows in the pattern seen from the right side. ------------------------------------------------------- START THE PIECE HERE: ------------------------------------------------------- SHAWL - SHORT OVERVIEW OF THE PIECE: The piece is worked back and forth on circular needle to allow room for all the stitches. It is worked top down with lace pattern and increases. SHAWL: Cast on 9 stitches with circular needle size 3 mm = US 2,5 and BabyAlpaca Silk. Work 1 RIDGE - see description above. Insert a marker in the middle stitch. Then work garter stitch - AT THE SAME TIME as you increase 4 stitches on each row from the right side as follows - READ INCREASE TIP: Increase 1 stitch inside 2 edge stitches in each side and 1 stitch on each side of the mid-stitch. Increase like this until there are 57 stitches on needle (i.e. 28 stitches on each side of mid-stitch). REMEMBER THE KNITTING GAUGE! Then work the 2 edge stitches in each side in garter stitch and the mid-stitch in stockinette stitch. Work diagrams A.1-A.3 as follows: Work 2 edge stitches in garter stitch, A.1 over 2 stitches, A.2 until there are 2 stitches left before mid-stitch, A.3 over 2 stitches and mid-stitch in stockinette stitch. Work A.1 over 2 stitches, A.2 until there are 4 stitches left on row, A.3 over 2 stitches and 2 edge stitches in garter stitch. When the diagrams have been worked 1 time in height there are 87 stitches on needle. Work diagrams A.4-A.6 as follows: Work 2 edge stitches in garter stitch, A.4 over 9 stitches, A.5 until there are 8 stitches left before mid-stitch (4 times in width), work A.6 over 8 stitches, mid-stitch in stockinette stitch, A.4 over 9 stitches, A.5 until there are 10 stitches left on row (4 times in width). Work A.6 over 8 stitches and 2 edge stitches in garter stitch. When the diagrams have been worked 1 time in height there are 111 stitches on needle. Work the diagrams 2 more times in height as follows: Work 2 edge stitches in garter stitch, A.4 over 9 stitches, work A.5 six times in width, A.6 over 8 stitches, mid-stitch in stockinette stitch, A.4 over 9 stitches, A.5 is worked 6 times in width, A.6 over 8 stitches and 2 edge stitches in garter stitch. When the diagrams have been worked 1 time in height there are 135 stitches on needle. Work 2 edge stitches in garter stitch, A.4 over 9 stitches, A.5 is worked 8 times in width, A.6 over 8 stitches, mid-stitch in stockinette stitch, A.4 over 9 stitches, A.5 is worked 8 times in width, A.6 over 8 stitches and 2 edge stitches in garter stitch. When the diagrams have been worked 1 time in height there are 159 stitches on needle. Work diagrams A.7-A.9 as follows: Work 2 edge stitches in garter stitch, A.7 over 1 stitch, A.8 until there is 1 stitch left before mid-stitch, A.9 over 1 stitch, mid-stitch in stockinette stitch. Work A.7 over 1 stitch, A.8 until there are 3 stitches left on row, work A.9 over 1 stitch and 2 edge stitches in garter stitch. When the diagrams have been worked 1 time in height there are 171 stitches on needle. Work diagrams A.10-A.12 as follows: Work 2 edge stitches in garter stitch, A.10 over 6stitches, A.11 until there are 7 stitches left before mid-stitch (7 times in width), work A.12 over 7 stitches and mid-stitch in stockinette stitch. Work A.10 over 6 stitches, A.11 until there are 9 stitches left on row (7 times in width), work A.12 over 7 stitches and 2 edge stitches in garter stitch. When the diagrams have been worked 1 time in height there are 231 stitches on needle. Work diagrams A.13-A.15 as follows: Work 2 edge stitches in garter stitch, A.13 over 6 stitches, A.14 until there are 7 stitches left before mid-stitch (10 times in width), work A.15 over 7 stitches and mid-stitch in stockinette stitch. Work A.13 over 6 stitches, A.14 until there are 9 stitches on needle (10 times in width), A.15 over 7 stitches and 2 edge stitches in garter stitch. When the diagrams have been worked 1 time in height there are 259 stitches on needle. Work diagrams A.16 to A.18 as follows: Work 2 edge stitches in garter stitch, A.16 over 1 stitch, A.17 until there are 2 stitches left before mid-stitch, A.18 over 2 stitches and mid-stitch in stockinette stitch. Work A.16 over 1 stitch, A.17 until there are 4 stitches left on row, A.18 over 2 stitches and 2 edge stitches in garter stitch. When the diagrams have been worked 1 time in height there are 291 stitches on needle. Work diagrams A.4 to A.6 as follows: Work 2 edge stitches in garter stitch, A.4 over 9 stitches, A.5 until there are 8 stitches left before mid-stitch (21 times in width), A.6 over 8 stitches and mid-stitch in stockinette stitch. Work A.4 over 9 stitches, A.5 until there are 10 stitches left on row (21 times in width), A.6 over 8 stitches and 2 edge stitches in garter stitch. When the diagrams have been worked 1 time in height there are 315 stitches on needle. Work the diagrams 1 more time in height as follows: Work 2 edge stitches in garter stitch , A.4 over 9 stitches, A.5 until there are 8 stitches left before mid-stitch (23 times in width), A.6 over 8 stitches, mid-stitch in stockinette stitch, A.4 over 9 stitches, A.5 until there are 10 stitches left on row (23 times in width), A.6 over 8 stitches and 2 edge stitches in garter stitch. There are 339 stitches on needle. Work diagrams A.19 to A.20 as follows: Work 2 edge stitches in garter stitch, A.19 over 5 stitches, A.20 until there are 6 stitches left before mid-stitch (13 times in width), A.21 over 6 stitches and mid-stitch in stockinette stitch. Work A.19 over 5 stitches, A.20 until there are 8 stitches left on row (13 times in width), A.21 over 6 stitches and 2 edge stitches in garter stitch. When the diagrams have been worked 1 time in height there are 411 stitches on needle. Work diagrams A.13 to A.15 as follows: Work 2 edge stitches in garter stitch, A.13 over 6 stitches, A.14 until there are 7 stitches left before mid-stitch (19 times in width), A.15 over 6 stitches and mid-stitch in stockinette stitch. Work A.13 over 6 stitches, A.14 until there are 9 stitches on needle (19 times in width), A.15 over 7 stitches and 2 edge stitches in garter stitch. When the diagrams have been worked 1 time in height there are 439 stitches on needle. Now continue working as follows: * Work 2 edge stitches in garter stitch, 1 yarn over, knit to mid-stitch, 1 yarn over, mid-stitch in stockinette stitch, 1 yarn over, knit until there are 2 stitches left on row, 1 yarn over and 2 edge stitches in garter stitch. Knit 1 row from the wrong side *. Work from *-* 1 more time. On the next row from the right side bind off loosely. To make the cast-off edge elastic, make 1 yarn over after each 5th stitch, which is then bind off as a normal stitch. Cut and fasten strand. |
||||||||||||||||||||||
Diagram explanations |
||||||||||||||||||||||
|
||||||||||||||||||||||
![]() |
||||||||||||||||||||||
![]() |
||||||||||||||||||||||
![]() |
||||||||||||||||||||||
![]() |
||||||||||||||||||||||
![]() |
||||||||||||||||||||||
Have you finished this pattern?Tag your pictures with #dropspattern #lemonheartshawl or submit them to the #dropsfan gallery. Do you need help with this pattern?You'll find 15 tutorial videos, a Comments/Questions area and more by visiting the pattern on garnstudio.com. © 1982-2025 DROPS Design A/S. We reserve all rights. This document, including all its sub-sections, has copyrights. Read more about what you can do with our patterns at the bottom of each pattern on our site. |
Post a comment to pattern DROPS 200-19
We would love to hear what you have to say about this pattern!
If you want to leave a question, please make sure you select the correct category in the form below, to speed up the answering process. Required fields are marked *.