DROPS / 200 / 19

Lemon Heart by DROPS Design

Knitted shawl in DROPS BabyAlpaca Silk. The piece is worked top down with lace pattern and garter stitch.

Tags: lace, shawls, top down,

DROPS Design: Pattern no bs-149
Yarn group A
-------------------------------------------------------

SIZE:
Measurements: Height measured along mid-stitch approx. 76 cm. Length along top approx. 152 cm.

MATERIALS:
DROPS BABYALPACA SILK from Garnstudio (belongs to yarn group A)
250 g colour 2110, light yellow

KNITTING TENSION:
24 stitches in width and 48 rows in height with garter stitch = 10 x 10 cm.

NEEDLES:
DROPS CIRCULAR NEEDLE SIZE 3 MM: length 80 cm.
The needle size is only a guide. If you get too many stitches on 10 cm, change to a larger needle size. If you get too few stitches on 10 cm, change to a smaller needle size.
-------------------------------------------------------

Have you knitted/crocheted this or any other of our designs? Tag your pictures in social media with #dropsdesign so we can see them!

Want to use a different yarn? Try our yarn converter!
Not sure which size you should choose? Then it might help you to know that the model in the picture is approx. 170 cm and uses size S or M. If you are making a jumper, cardigan, dress or similar garment, you will find a graphic with the measurements of the finished garment (in cm) at the bottom of the pattern.

70% Alpaca, 30% Silk
from 4.10 £ /50g
DROPS BabyAlpaca Silk uni colour DROPS BabyAlpaca Silk uni colour 4.10 £ /50g
Wool Warehouse Direct Ltd
Order
DROPS Needles & Hooks
You can get the yarn to make this pattern from 20.50£. Read more.

Pattern instructions

NOTE: This pattern is written in British English. All measurements in charts are in cm. For conversion from cm to inches - click here. There are different terms for crocheting in British and American English. If this pattern includes crochet, click for "crochet terms" here. For this pattern in American English, please click here.
-------------------------------------------------------

EXPLANATIONS FOR THE PATTERN:

-------------------------------------------------------

RIDGE/GARTER STITCH (worked back and forth):
Knit all rows. 1 ridge in height = Knit 2 rows.

INCREASE TIP:
Increase by making yarn overs, which are knitted on next row to leave holes.

PATTERN: 
See diagrams A.1 to A.21. The diagrams show all the rows in the pattern seen from the right side.

-------------------------------------------------------

START THE PIECE HERE:

-------------------------------------------------------

SHAWL - SHORT OVERVIEW OF THE PIECE:
The piece is worked back and forth on circular needle to allow room for all the stitches. It is worked top down with lace pattern and increases.

SHAWL:
Cast on 9 stitches with circular needle size 3 mm and BabyAlpaca Silk. Work 1 RIDGE - see description above. Insert a marker in the middle stitch. Then work garter stitch - AT THE SAME TIME as you increase 4 stitches on each row from the right side as follows - READ INCREASE TIP: Increase 1 stitch inside 2 edge stitches in each side and 1 stitch on each side of the mid-stitch. Increase like this until there are 57 stitches on needle (i.e. 28 stitches on each side of mid-stitch). REMEMBER THE KNITTING TENSION! Then work the 2 edge stitches in each side in garter stitch and the mid-stitch in stocking stitch. 

Work diagrams A.1-A.3 as follows: Work 2 edge stitches in garter stitch, A.1 over 2 stitches, A.2 until there are 2 stitches left before mid-stitch, A.3 over 2 stitches and mid-stitch in stocking stitch. Work A.1 over 2 stitches, A.2 until there are 4 stitches left on row, A.3 over 2 stitches and 2 edge stitches in garter stitch. When the diagrams have been worked 1 time in height there are 87 stitches on needle.

Work diagrams A.4-A.6 as follows: Work 2 edge stitches in garter stitch, A.4 over 9 stitches, A.5 until there are 8 stitches left before mid-stitch (4 times in width), work A.6 over 8 stitches, mid-stitch in stocking stitch, A.4 over 9 stitches, A.5 until there are 10 stitches left on row (4 times in width). Work A.6 over 8 stitches and 2 edge stitches in garter stitch.
When the diagrams have been worked 1 time in height there are 111 stitches on needle.

Work the diagrams 2 more times in height as follows:
Work 2 edge stitches in garter stitch, A.4 over 9 stitches, work A.5 six times in width, A.6 over 8 stitches, mid-stitch in stocking stitch, A.4 over 9 stitches, A.5 is worked 6 times in width, A.6 over 8 stitches and 2 edge stitches in garter stitch. When the diagrams have been worked 1 time in height there are 135 stitches on needle.
Work 2 edge stitches in garter stitch, A.4 over 9 stitches, A.5 is worked 8 times in width, A.6 over 8 stitches, mid-stitch in stocking stitch, A.4 over 9 stitches, A.5 is worked 8 times in width, A.6 over 8 stitches and 2 edge stitches in garter stitch. When the diagrams have been worked 1 time in height there are 159 stitches on needle.

Work diagrams A.7-A.9 as follows: Work 2 edge stitches in garter stitch, A.7 over 1 stitch, A.8 until there is 1 stitch left before mid-stitch, A.9 over 1 stitch, mid-stitch in stocking stitch. Work A.7 over 1 stitch, A.8 until there are 3 stitches left on row, work A.9 over 1 stitch and 2 edge stitches in garter stitch. When the diagrams have been worked 1 time in height there are 171 stitches on needle.

Work diagrams A.10-A.12 as follows: Work 2 edge stitches in garter stitch, A.10 over 6stitches, A.11 until there are 7 stitches left before mid-stitch (7 times in width), work A.12 over 7 stitches and mid-stitch in stocking stitch. Work A.10 over 6 stitches, A.11 until there are 9 stitches left on row (7 times in width), work A.12 over 7 stitches and 2 edge stitches in garter stitch. When the diagrams have been worked 1 time in height there are 231 stitches on needle.

Work diagrams A.13-A.15 as follows: Work 2 edge stitches in garter stitch, A.13 over 6 stitches, A.14 until there are 7 stitches left before mid-stitch (10 times in width), work A.15 over 7 stitches and mid-stitch in stocking stitch. Work A.13 over 6 stitches, A.14 until there are 9 stitches on needle (10 times in width), A.15 over 7 stitches and 2 edge stitches in garter stitch. When the diagrams have been worked 1 time in height there are 259 stitches on needle.

Work diagrams A.16 to A.18 as follows: Work 2 edge stitches in garter stitch, A.16 over 1 stitch, A.17 until there are 2 stitches left before mid-stitch, A.18 over 2 stitches and mid-stitch in stocking stitch. Work A.16 over 1 stitch, A.17 until there are 4 stitches left on row, A.18 over 2 stitches and 2 edge stitches in garter stitch. When the diagrams have been worked 1 time in height there are 291 stitches on needle.

Work diagrams A.4 to A.6 as follows: Work 2 edge stitches in garter stitch, A.4 over 9 stitches, A.5 until there are 8 stitches left before mid-stitch (21 times in width), A.6 over 8 stitches and mid-stitch in stocking stitch. Work A.4 over 9 stitches, A.5 until there are 10 stitches left on row (21 times in width), A.6 over 8 stitches and 2 edge stitches in garter stitch.
When the diagrams have been worked 1 time in height there are 315 stitches on needle.

Work the diagrams 1 more time in height as follows:
Work 2 edge stitches in garter stitch , A.4 over 9 stitches, A.5 until there are 8 stitches left before mid-stitch (23 times in width), A.6 over 8 stitches, mid-stitch in stocking stitch, A.4 over 9 stitches, A.5 until there are 10 stitches left on row (23 times in width), A.6 over 8 stitches and 2 edge stitches in garter stitch. There are 339 stitches on needle.

Work diagrams A.19 to A.20 as follows: Work 2 edge stitches in garter stitch, A.19 over 5 stitches, A.20 until there are 6 stitches left before mid-stitch (13 times in width), A.21 over 6 stitches and mid-stitch in stocking stitch. Work A.19 over 5 stitches, A.20 until there are 8 stitches left on row (13 times in width), A.21 over 6 stitches and 2 edge stitches in garter stitch. When the diagrams have been worked 1 time in height there are 411 stitches on needle.

Work diagrams A.13 to A.15 as follows: Work 2 edge stitches in garter stitch, A.13 over 6 stitches, A.14 until there are 7 stitches left before mid-stitch (19 times in width), A.15 over 6 stitches and mid-stitch in stocking stitch. Work A.13 over 6 stitches, A.14 until there are 9 stitches on needle (19 times in width), A.15 over 7 stitches and 2 edge stitches in garter stitch. When the diagrams have been worked 1 time in height there are 439 stitches on needle.

Now continue working as follows: * Work 2 edge stitches in garter stitch, 1 yarn over, knit to mid-stitch, 1 yarn over, mid-stitch in stocking stitch, 1 yarn over, knit until there are 2 stitches left on row, 1 yarn over and 2 edge stitches in garter stitch. Knit 1 row from the wrong side *. Work from *-* 1 more time.

On the next row from the right side cast off loosely. To make the cast-off edge elastic, make 1 yarn over after each 5th stitch, which is then cast off as a normal stitch. Cut and fasten strand.

This pattern has been corrected. .

Updated online: 27.05.2019
Correction: Diagrams A.19, A.20 and A.21 are corrected so lace pattern is worked from the right side.
Updated online: 12.06.2019
Diagram A.19 and A.20 are corrected

Diagram

= knit from right side, purl from wrong side
= knit from wrong side
= between 2 stitches make 1 yarn over. There will be a hole.
= between 2 stitches make 1 yarn over; work yarn over twisted on next row to avoid a hole
= knit 2 together
= slip 1 stitch as if to knit, knit 1 and pass the slipped stitch over the knitted stitch
= slip 1 stitch as if to knit, knit 2 together and pass the slipped stitch over the knitted together stitches





Mara 11.08.2019 - 13:09:

Buongiorno, forse non interpreto correttamente i diagrammi... secondo me già a partire da A1-A2-A3 arrivati alla maglia centrale occorre procedere con A3-A2-A1 e non ripetere la sequenza A1-A2-A come indicato. Altrimenti il motivo non viene centrato. Giusto? Grazie

DROPS Design 11.08.2019 kl. 13:35:

Buongiorno Mara. È corretto come indicato nel testo. In questo modo avrà una maglia gettata sia prima che dopo la maglia centrale. Buon lavoro!

Orchydee 10.08.2019 - 16:43:

Je pense que sur le diagramme A3 il manque la maille jetée à tricoter torse pour avoir les 87 mailles😉😉😉

DROPS Design 12.08.2019 kl. 09:27:

Bonjour Orchydée, on va augmenter 8 m dans chaque A.1 et 7 m seulement dans chaque A.3, on aura ainsi: 57 m + 2 x 8 + 2 x 7 = 87 m. Bon tricot!

Christine Roderick 05.08.2019 - 13:41:

Beautiful shawl Present to myself I thnk

Els Sielias 13.07.2019 - 17:30:

Vraagje 9 steken opzetten? Een ribbelsteeknaald,daarna gelijk het telpatroon??

DROPS Design 15.07.2019 kl. 13:28:

Dag Els,

Ja, dat klopt! Je zet 9 steken op, breit 2 naalden recht (= 1 ribbel) en dan ga je verder met het patroon.

Els Sielias 13.07.2019 - 17:29:

Vraagje 9 steken opzetten? Een ribbelsteeknaald,daarna gelijk het telpatroon??

Anja 07.07.2019 - 22:16:

Was bedeutet der Edelstein auf dem Bild?

DROPS Design 08.07.2019 kl. 10:37:

Liebe Anja, dieses Modell sieht man auf unserem . Viel Spaß beim stricken!

PARAVY Aurore 09.06.2019 - 13:50:

Bonjour, je suis arrivée aux diagrammes A19 à A21. N'y aurait-il pas une erreur à partir du rang 7? Tous les surjets doubles ainsi que les mailles ensembles se font sur des rangs pairs alors que, jusqu'à présent, ils se faisaient sur les rangs impairs. Ne manquerait-il pas un rang jersey avant de faire les rangs ajourés ? Merci d'avance pour votre retour, cordialement

DROPS Design 11.06.2019 kl. 11:08:

Bonjour Mme Paravy, le 7ème rang de A.19, A.20 et A.21 se tricotent sur l'endroit (commem tous les rangs impairs car le 1er rang du diagramme = sur l'endroit). Au 7ème rang, les 2 dernières mailles de A.19 sont indiquées dans A.20, les 2 dernières mailles de A.20 se tricotent comme les 2 premières m du A.20 suivant puis de A.21. Bon tricot!

Micheline PAPILLON 06.06.2019 - 22:43:

Il y a une erreur sur le 23ème rang du diagramme A19-20-21. Il y a une maille en trop avant le surjet double. Je suis en train de le tricoter j'ai rectifier l'erreur de moi-même, mais il faudrait le corriger sur le diagramme si possible pour les autres tricoteuses. Merci pour tous vos jolis modèles et vos traductions. Cordialement.

DROPS Design 07.06.2019 kl. 08:57:

Bonjour Mme Papillon, merci pour votre retour, les diagrammes vont être corrigés. Bon tricot!

Kathi 04.06.2019 - 11:52:

Wo sind denn die Diagramme A13-A18? 😳

DROPS Design 04.06.2019 kl. 12:41:

Liebe Kathi, sie sind ganz unten, dh nach bzw unter A.10, A.11 und A.12. Viel Spaß beim stricken!

Muriel Etter 30.05.2019 - 08:20:

Bonjour, il est impossible d'imprimer les explications. Pouvez-vous corriger ce problème ? cordialement Muriel Etter

DROPS Design 30.05.2019 kl. 17:40:

Bonjour Muriel, cliquez sur l'icone avec imprimante + le mot 'EXPLICATIONS' juste avant les explications. Ensuite cliquez sur 'Imprimer les explications →' dans le coin supérieur droit. Bon travail!

Post a comment to pattern DROPS 200-19

We would love to hear what you have to say about this pattern!

If you want to leave a question, please make sure you select the correct category in the form below, to speed up the answering process. Required fields are marked *.