Zena wrote:
Hi. Cast on Peony jumper on 2.5mm 80cm circular as recommended but cannot join in the round as cord to long. This is my first in the round jumper. What should I do? Is this the wrong circular needle? Thank you.
03.08.2021 - 07:56DROPS Design answered:
Hi Zena, It sounds like you are knitting the smaller sizes, which need the 60 cm circular needle. Happy knitting!
03.08.2021 - 08:40
Kristiina Taaramäe wrote:
Tere. Varrukatel tehtavate kasvatuste osa on valesti tõlgitud. Peaks olema mitte enne 1. ja 3. , vaid peale 1. ja 3. Ning mitte peale 2. ja 4., vaid enne 2. ja 4. Ehk vastupidiselt õlgade kasvatustele.
28.05.2021 - 15:17
Pink Peony#pinkpeonysweater |
|||||||||||||||||||||||||
![]() |
![]() |
||||||||||||||||||||||||
Knitted sweater for children in DROPS Baby Merino. The piece is worked top down with saddle-shoulders, lace pattern and short sleeves. Sizes 3-14 years.
DROPS Baby & Children 38-21 |
|||||||||||||||||||||||||
------------------------------------------------------- EXPLANATIONS FOR THE PATTERN: ------------------------------------------------------- PATTERN: See diagrams A.1 and A.2. Find your size in the diagram. INCREASE TIP-1 (evenly spaced): To work out how to increase evenly, count the total number of stitches on the needle (e.g. 84 stitches) and divide by the number of increases to be made (e.g. 22) = 3.8. In this example, increase by making 1 yarn over after alternately each 3rd and 4th stitch (approx.). On the next round work the yarn overs twisted to avoid holes. INCREASE TIP-2 (for saddle shoulders, sleeves and yoke): BEFORE MARKER: The new stitch twists to the right. Use the left needle to pick up the strand between 2 stitches from the previous round, pick up the back strand and knit in the front loop. AFTER MARKER: The new stitch twists to the left. Use the left needle to pick up the strand between 2 stitches from the previous round, pick up the front strand and knit in the back loop. BINDING-OFF TIP: To avoid the bind-off edge being tight you can bind off with a larger size needle. If the edge is still tight, make 1 yarn over after approx. each 6th stitch at the same time as binding off; the yarn overs are bind off as normal stitches. ------------------------------------------------------- START THE PIECE HERE: ------------------------------------------------------- SWEATER – SHORT OVERVIEW OF THE PIECE: The neck and yoke are worked in the round with circular needle, top down. Stitches are increased for the shoulders, then for the sleeves and finally for the yoke. The yoke is divided for the body and sleeves and the body continued in the round. The sleeves are worked in the round with double pointed needles/short circular needle, top down. NECK: Cast on 84-88-92-92-96-100 stitches with circular needle size 2.5 MM = US 1.5 and Baby Merino. Knit 1 round, then work rib (knit 2, purl 2) for 3 cm = 1⅛". When the rib is finished, knit 1 round where you increase 22-22-26-26-26-26 stitches evenly spaced – read INCREASE TIP-1 = 106-110-118-118-122-126 stitches. Knit 1 round; yarn overs knitted twisted. Change to circular needle size 3 MM = US 2.5. YOKE: The beginning of the round is the transition between right shoulder and back piece. Insert 1 marker after the first 35-36-41-41-42-43 stitches (= approx. mid-front) – THE PIECE IS MEASURED FROM HERE! In addition, insert 4 other markers as described below – without working the stitches and each marker inserted between 2 stitches. The markers are used when increasing and should be of a different color to the marker on the neck. Marker 1: Insert the marker before the first stitch on the round (= back side of right shoulder when garment is worn). Marker 2: Count 16-16-22-22-22-22 stitches from marker 1 (= shoulder), insert the marker before the next stitch. Marker 3: Count 37-39-37-37-39-41 stitches from marker 2 (= front piece), insert the marker before the next stitch. Marker 4: Count 16-16-22-22-22-22 stitches from marker 3 (= shoulder), insert the marker before the next stitch. There are now 37-39-37-37-39-41 stitches left on round after marker 4 (= back piece). Allow the 4 markers to follow your work onwards. INCREASES FOR SADDLE SHOULDERS: Read the whole of the next section before continuing! Piece is now worked with A.1 over the stitches on front piece and back piece (see diagram for your size), and stockinette stitch over the stitches on saddle shoulder/sleeves. AT THE SAME TIME, on the first round increase 4 stitches for the shoulders as follows: Increase 1 stitch BEFORE markers 1 and 3 and increase 1 stitch AFTER markers 2 and 4 – read INCREASE TIP-2. You are only increasing on the front and back pieces, the number of sleeve stitches remains the same. Increase like this every round a total of 12-16-20-22-24-26 times = 154-174-198-206-218-230 stitches. REMEMBER THE KNITTING GAUGE! The increased stitches are worked into A.1. When A.1 is finished in height, continue pattern the same way upwards (A.2 shows 1 repetition of pattern), make sure that A.2 fits over the stitches from A.1. After the last increase, the piece measures approx. 4-5-6-7-8-9 cm = 1½"-2"-2⅜"-2¾"-3⅛"-3½" from the marker on the neck. Now increase for the sleeves as described below. INCREASES FOR SLEEVES: Continue with stockinette stitch over the stitches on the sleeves, and continue pattern as before on front piece and back piece. AT THE SAME TIME on the next round increase 4 stitches as follows: Increase 1 stitch AFTER markers 1 and 3 and increase 1 stitch BEFORE markers 2 and 4. You are only increasing on the sleeves and the number of stitches on the front and back pieces remains the same. The increased stitches are worked in stockinette stitch. Increase like this every 2nd round a total of 13-17-15-16-18-19 times = 206-242-258-270-290-306 stitches. The piece measures approx. 12-16-15-17-19-21 cm = 4¾"-6¼"-6"-6¾"-7½"-8¼" from the marker on the neck. INCREASES FOR YOKE: Now increase 1 stitch on each side of all 4 markers as follows: Work until there is 1 stitch left before markers 1 and 3, increase 1 stitch before the marker, work 1 stitch, move the marker to the right needle and increase 1 stitch after the marker. Work to markers 2 and 4, increase 1 stitch before the marker, move the marker to the right needle, work 1 stitch and increase 1 stitch after the marker (= 8 stitches increased). You are now increasing on both the front and back pieces and on the sleeves. The increased stitches are worked into A.2 on the back/front piece and in stockinette stitch on the sleeves. Increase like this every 2nd round a total of 5-2-2-1-0-0 times = 246-258-274-278-290-306 stitches. When all the increases are finished, the piece measures approx. 15-17-17-18-19-21 cm = 6"-6¾"-6¾"-7"-7½"-8¼" from the marker on the neck. If the piece is shorter than this, continue working without further increases to the correct length. Now divide the piece for body and sleeves on the next round as follows: Place the first 52-54-56-56-58-60 stitches on a thread for sleeve, cast on 8-8-8-10-10-10 new stitches (= in the side, under the sleeve), work as before over the next 71-75-81-83-87-93 stitches (= front piece), place the next 52-54-56-56-58-60 stitches on a thread for sleeve, cast on 8-8-8-10-10-10 new stitches (= in the side, under the sleeve), and work as before over the last 71-75-81-83-87-93 stitches (= back piece). Body and sleeves are finished separately. THE PIECE IS NOW MEASURED FROM HERE. BODY: = 158-166-178-186-194-206 stitches. Work A.2 as before; the stitches which do not fit into A.2 in the sides are worked in stockinette stitch. Continue working until the piece measures 12-12-15-16-17-17 cm = 4¾"-4¾"-6"-6¼"-6¾"-6¾" from the division. There is approx. 4 cm = 1½" left to finished length; try the sweater on and continue to desired length. Knit 1 round where you increase 36-36-36-40-44-44 stitches evenly spaced = 194-202-214-226-238-250 stitches. NOTE: You increase stitches here to prevent the rib being tight. Change to circular needle size 2.5 MM = US 1.5 and work rib (knit 1, purl 1) for 4 cm = 1½". Bind off with knit over knit and purl over purl – read BINDING-OFF TIP! The sweater measures approx. 34-36-40-42-44-46 cm = 13⅜"-14¼"-15¾"-16½"-17¼"-18" from the shoulder down. SLEEVES: Place the 52-54-56-56-58-60 stitches from the thread on the one side of the piece on short circular needle/double pointed needles size 3 MM = US 2.5 and knit up 1 stitch in each of the 8-8-8-10-10-10 stitches cast on under the sleeve = 60-62-64-66-68-70 stitches. Insert a marker thread in the middle of the new stitches under the sleeve. Start at the marker thread and work stockinette stitch in the round. Continue working until the sleeve measures 5-6-10-13-15-17 cm = 2"-2⅜"-4"-5⅛"-6"-6¾" from the division, There is approx. 4 cm = 1½" left to finished length; try the sweater on and continue to desired length. Knit 1 round where you decrease 4 stitches evenly spaced = 56-58-60-62-64-66 stitches. Change to double pointed needles size 2.5 MM = US 1.5 and work rib (knit 1, purl 1) for 4 cm = 1½". Bind off with knit over knit and purl over purl – remember BINDING-OFF TIP! The sleeve measures approx. 9-10-14-17-19-21 cm = 3½"-4"-5½"-6¾"-7½"-8¼" from the division. Work the other sleeve in the same way. |
|||||||||||||||||||||||||
Diagram explanations |
|||||||||||||||||||||||||
|
|||||||||||||||||||||||||
![]() |
|||||||||||||||||||||||||
![]() |
|||||||||||||||||||||||||
![]() |
|||||||||||||||||||||||||
Have you finished this pattern?Tag your pictures with #dropspattern #pinkpeonysweater or submit them to the #dropsfan gallery. Do you need help with this pattern?You'll find 27 tutorial videos, a Comments/Questions area and more by visiting the pattern on garnstudio.com. © 1982-2025 DROPS Design A/S. We reserve all rights. This document, including all its sub-sections, has copyrights. Read more about what you can do with our patterns at the bottom of each pattern on our site. |
Post a comment to pattern DROPS Baby & Children 38-21
We would love to hear what you have to say about this pattern!
If you want to leave a question, please make sure you select the correct category in the form below, to speed up the answering process. Required fields are marked *.