Midnight Dream Cardigan#midnightdreamcardigan |
|
![]() |
![]() |
Knitted jacket in 1 strand DROPS Melody or 2 strands DROPS Brushed Alpaca Silk. The piece is worked top down in stockinette stitch, with raglan. Sizes XS – XXXL.
DROPS 273-14 |
|
|
------------------------------------------------------- EXPLANATIONS FOR THE PATTERN: ------------------------------------------------------- GARTER STITCH: Knit all rows, from both the right and wrong side. 1 ridge in height = knit 2 rows. RAGLAN: All increases are worked from the right side. Increase 1 stitch by making 1 yarn over, which is worked as follows on the next row: BEFORE RAGLAN-STITCH (yarn over twists to left): Purl through the stitch loop that lies on the back of the needle (avoids a hole). Continue the new stitches in stockinette stitch. AFTER RAGLAN-STITCH (yarn over twists to right): Slip the yarn over from the left needle to the right needle purl-wise, then replace it by inserting the left needle through the back (the yarn over is the other way round). Purl through the stitch loop that lies on the front of the needle (avoids a hole). Continue the new stitches in stockinette stitch. BUTTONHOLES: Work 7-7-7-7-8-8-8 buttonholes on the right band. 1 buttonhole = knit 2 together, make 1 yarn over. On the next row, knit the yarn over to leave a hole. The top buttonhole is worked 1 cm = ⅜" below the top edge, the bottom buttonhole in the transition between the stockinette stitch and rib. The other 5-5-5-5-6-6-6 buttonholes are worked evenly between these 2 (approx. 7½-8-8-8½-7½-8-8 cm = 2⅞"-3⅛"-3⅛"-3¼"-2⅞"-3⅛"-3⅛" between each one). SLEEVE TIP: When knitting up stitches under the sleeve, you can get a small hole in the transition between stitches on the body and sleeve. This hole can be closed by picking up the strand between 2 stitches and working this strand twisted together with the first stitch between body and sleeve. DECREASE TIP: Decrease 1 stitch on each side of the marker-thread as follows: Work until there are 3 stitches left before the marker-thread, knit 2 together, knit 2 (marker-thread sits between these 2 stitches), slip 1 stitch knit-wise, knit 1 and pass the slipped stitch over the knitted stitch (2 stitches decreased). ------------------------------------------------------- START THE PIECE HERE: ------------------------------------------------------- JACKET – SHORT OVERVIEW OF THE PIECE: The pattern uses both long and short needles; start with the length which fits the number of stitches and change when necessary. The piece is worked top down. Stitches are cast on for the neckline and the piece is worked back and forth, increasing on each side for the neckline. The yoke is then continued back and forth. When the yoke is finished, it is divided for the body and sleeves and the body is continued back and forth, while the sleeves wait. The sleeves are worked top down, in the round. Stitches are knitted up along each front piece for the bands. Then stitches are knitted up along the neckline and the neck is worked back and forth to finish. NECKLINE: Cast on 54-54-56-58-60-62-64 stitches with circular needle size 5.5 MM = US 9 and 1 strand DROPS Melody or 2 strands DROPS Brushed Alpaca Silk. Purl 1 row from the wrong side. Insert 4 markers as follows (while working the stitches) and inserting each marker in a stitch (= raglan-stitches). You increase for raglan on each side of the raglan-stitches. ROW 1 (right side): Knit 1, make 1 yarn over, knit 1 and insert 1 marker in this stitch (= raglan-stitch), make 1 yarn over, knit 15 (= sleeve), make 1 yarn over, knit 1 and insert 1 marker in this stitch (= raglan-stitch), make 1 yarn over, knit 18-18-20-22-24-26-28 (= back piece), make 1 yarn over, knit 1 and insert 1 marker in this stitch (= raglan-stitch), make 1 yarn over, knit 15 (= sleeve), make 1 yarn over, knit 1 and insert 1 marker in this stitch (= raglan-stitch), make 1 yarn over, knit 1, cast on 2 stitches at end of row = 64-64-66-68-70-72-74 stitches. ROW 2 (wrong side): Purl (remember to work the yarn overs as described under RAGLAN), cast on 2 stitches at end of row = 66-66-68-70-72-74-76 stitches. ROW 3 (right side): Knit and increase for raglan on each side of the raglan-stitches, cast on 2 stitches at end of row = 76-76-78-80-82-84-86 stitches. ROW 4 (wrong side): Purl, cast on 2 stitches at end of row = 78-78-80-82-84-86-88 stitches. ROW 5 (right side): Knit and increase for raglan on each side of the raglan-stitches, cast on 1 stitch at end of row = 87-87-89-91-93-95-97 stitches. ROW 6 (wrong side): Purl, cast on 1 stitch at end of row = 88-88-90-92-94-96-98 stitches. You have increased 3 times for raglan and 5 stitches have been cast on each side for the neckline. Continue as follows: ROW 1 (right side): Knit and increase for raglan as before, cast on 4-4-5-6-7-8-9 stitches at the end of the row = 100-100-103-106-109-112-115 stitches. ROW 2 (wrong side): Work 1 edge stitch in GARTER STITCH – read explanation above, purl to end of row, cast on 4-4-5-6-7-8-9 stitches = 104-104-108-112-116-120-124 stitches. There are 26-26-28-30-32-34-36 stitches on the back piece, 23 stitches on each sleeve, 14-14-15-16-17-18-19 stitches on each front piece and 1 stitch in each raglan-line. YOKE:. Continue stockinette stitch back and forth with 1 edge stitch in garter stitch on each side (mid-front). Remember to maintain the knitting gauge. The increases for raglan continue as follows: ROW 1 (right side): Work stockinette stitch and edge-stitches as before, increasing for raglan on each side of the raglan-stitches (8 increased stitches). ROW 2 (wrong side): Work stockinette stitch and edge-stitches as before (remember to work the yarn overs as described under RAGLAN). Work ROWS 1 and 2 a total of 1-4-7-7-7-5-3 times (2-8-14-14-14-10-6 rows worked) = 112-136-164-168-172-160-148 stitches. Now increase for raglan as follows: ROW 1 (right side): Work stockinette stitch and edge-stitches, increasing for raglan on each side of the raglan-stitches (8 increased stitches). ROW 2 (wrong side): Work stockinette stitch and edge-stitches. ROW 3 (right side): Work stockinette stitch and edge-stitches, increasing for raglan only on the front and back pieces, i.e., before markers 1 and 3 and after markers 2 and 4; do not increase on the sleeves (4 increased stitches). ROW 4 (wrong side): Work stockinette stitch and edge-stitches. Work ROWS 1 to 4 a total of 9-9-8-8-9-11-13 times (= 18-18-16-16-18-22-26 increases in height on the front and back pieces and 9-9-8-8-9-11-13 increases in height on the sleeves) = 220-244-260-264-280-292-304 stitches. The raglan-increases are finished: A total of 23-26-27-27-29-31-33 increases in height on the front and back pieces and 14-17-19-19-20-20-20 increases in height on the sleeves (including the increases on the neckline). The piece measures 24-27-28-28-31-33-35 cm = 9½"-10⅝"-11"-11"-12¼"-13"-13¾" from mid back. Now divide for the body and sleeves. DIVIDE FOR BODY AND SLEEVES Work 34-37-39-40-43-46-49 stitches as before (= front piece), place the next 43-49-53-53-55-55-55 stitches on a stitch holder/thread for the sleeve, cast on 6-6-8-12-14-16-18 stitches (mid-under the sleeve), work 66-72-76-78-84-90-96 stitches (= back piece), place the next 43-49-53-53-55-55-55 stitches on a stitch holder/thread for the sleeve, cast on 6-6-8-12-14-16-18 stitches (mid-under the sleeve), work the last 34-37-39-40-43-46-49 stitches as before (= front piece). The body and sleeves are finished separately. BODY: = 146-158-170-182-198-214-230 stitches. Continue stockinette stitch with 1 edge stitch on each side until the piece measures 45-47-49-51-52-54-56 cm = 17¾"-18½"-19¼"-20"-20½"-21¼"-22" from mid back. On the next row from the right side, begin the rib. AT THE SAME TIME increase 15-15-17-19-19-21-23 stitches evenly on the first row (do not increase the edge-stitches) = 161-173-187-201-217-235-253 stitches, working as follows: Change to circular needle size 4 MM = US 6. Work 1 edge stitch, then rib (knit 1 and purl 1 – remember to increase) until there are 2 stitches left, knit 1 and work 1 edge-stitch. When the rib measures 4-4-4-4-5-5-5 cm = 1½"-1½"-1½"-1½"-2"-2"-2", bind off slightly loosely with rib. The jacket measures approx. 49-51-53-55-57-59-61 cm = 19¼"-20"-21"-21⅝"-22½"-23¼"-24" from mid-back and 54-56-58-60-62-64-66 cm = 21¼"-22"-22¾"-23⅝"-24⅜"-25¼"-26" from the shoulder. SLEEVES: Place the 43-49-53-53-55-55-55 sleeve-stitches from one thread/stitch holder onto circular needle size 5.5 MM = US 9 and knit up 1 stitch in each of the 6-6-8-12-14-16-18 cast-on stitches under the sleeve – read SLEEVE TIP = 49-55-61-65-69-71-73 stitches. Insert a marker-thread in the middle of the 6-6-8-12-14-16-18 new stitches under the sleeve. The round starts by the marker-thread. Work stockinette stitch in the round. AT THE SAME TIME, on the first round, decrease mid-under the sleeve – read DECREASE TIP as follows: Decrease 2 stitches every 0-4-3½-3-3-3-3 cm = 0"-1½"-1¼"-1⅛"-1⅛"-1⅛"-1⅛" 1-3-5-6-7-7-7 times = 47-49-51-53-55-57-59 stitches. Continue working until the sleeve measures 38-36-35-36-33-31-29 cm = 15"-14¼"-13¾"-14¼"-13"-12¼"-11⅜" from the division. Change to double pointed needles size 4 MM = US 6. Work rib (knit 1 and purl 1), AT THE SAME TIME increase 5-5-5-5-5-7-7 stitches evenly on the first round = 52-54-56-58-60-64-66 stitches. When the rib measures 4-4-4-4-5-5-5 cm = 1½"-1½"-1½"-1½"-2"-2"-2", bind off slightly loosely with rib. The sleeve measures approx. 42-40-39-40-38-36-34 cm = 16½"-15¾"-15¼"-15¾"-15"-14¼"-13⅜" from the division. LEFT BAND: Use circular needle size 4 MM = US 6. Start from the right side at the top of the left front piece and knit up 81-85-89-91-93-97-101 stitches inside the edge-stitch, down the front piece (approx. 18 stitches per 10 cm = 4" – the stitch count should be divisible by 2 + 1). Work the first row from the wrong side as follows: 1 garter stitch, rib (purl 1 and knit 1) until there are 2 stitches left, purl 1 and 1 garter stitch. From the right side: 1 garter stitch, rib (knit 1 and purl 1) until there are 2 stitches left, knit 1 and 1 garter stitch. Work this rib back and forth for 3-3-3-3-4-4-4 cm = 1⅛"-1⅛"-1⅛"-1⅛"-1½"-1½"-1½". Bind off with rib. RIGHT BAND: Knit up in the same way as the left band, beginning at the bottom of the right front piece and working upwards. Work rib for 1½-1½-1½-1½-2-2-2 cm = ½"-½"-½"-½"-¾"-¾"-¾". Now work the BUTTONHOLES – read explanation above. Continue the rib until it measures a total of 3-3-3-3-4-4-4 cm = 1⅛"-1⅛"-1⅛"-1⅛"-1½"-1½"-1½". Bind off with rib. NECK: Use circular needle size 4 MM = US 6. Start from the right side mid front and knit up 89 to 101 stitches inside 1 stitch, along the neckline (knit up a few extra stitches across the bands so they are not tight – the stitch count should be an odd number). Work the first row from the wrong side as follows: 1 garter stitch, rib (purl 1 and knit 1) until there are 2 stitches left, purl 1 and 1 garter stitch. Work this rib back and forth for 8-8-8-8-9-9-9 cm = 3⅛"-3⅛"-3⅛"-3⅛"-3½"-3½"-3½". Bind off with rib. ASSEMBLY: Sew the buttons onto the left band. |
|
![]() |
|
Have you finished this pattern?Tag your pictures with #dropspattern #midnightdreamcardigan or submit them to the #dropsfan gallery. Do you need help with this pattern?You'll find 31 tutorial videos, a Comments/Questions area and more by visiting the pattern on garnstudio.com. © 1982-2026 DROPS Design A/S. We reserve all rights. This document, including all its sub-sections, has copyrights. Read more about what you can do with our patterns at the bottom of each pattern on our site. |
|
Post a comment to pattern DROPS 273-14
We would love to hear what you have to say about this pattern!
If you want to leave a question, please make sure you select the correct category in the form below, to speed up the answering process. Required fields are marked *.