Christina D. Cersosimo wrote:
Petronella - In the Raglan decrease instructions section, there are 3 sets of instructions - what is the 3rd one for? It starts with Increase as follows... Is this used after the repeats are complete? (2 round rows complete, then 4 round rows complete)
01.03.2017 - 18:25DROPS Design answered:
Dear Christina, you'll find under Raglan 2 kinds of increase: how to inc every 2nd round before and after marker thread then how to inc every 4th round, first before the marker thread then after the marker thread. Happy knitting!
02.03.2017 - 08:37Christina D. Cersosimo wrote:
I am struggling with Row 2 with the YO's on the Chart A2 for sleeves where it is also an increase row. I am doing move marker K1, YO (per the increase instruction), then Chart A2 - K2tog, YO to one stich left and then YO, K1, move marker - but it is only increasing one stich - rather than 2 to keep the balance My counts are off, as they are an odd number of stiches, not even. Is this correct?
01.03.2017 - 18:25DROPS Design answered:
Dear Christina, when inc at the end of sleeve, you will have to adjust the pattern, so that when 2 sts remain before marker, K1, YO, K1, so that you keep the inc for raglan. Happy knitting!
02.03.2017 - 08:35
Linda Von Diesel wrote:
Ik kan niet wachten! Wat een mooi model.
23.01.2017 - 08:30
Katleen wrote:
Zeer mooi ; mooi mouwafwerking
27.12.2016 - 11:25
Petronella#petronellasweater |
|||||||||||||
|
|||||||||||||
Knitted jumper with raglan and lace pattern, worked top down with 3/4-length sleeves in DROPS Muskat. Sizes S - XXXL.
DROPS 175-31 |
|||||||||||||
RIDGE/GARTER STITCH (worked in the round): 1 ridge = 2 rounds. Knit 1 round and purl 1 round. PATTERN: See diagrams A.1, A.2 and A.3. The diagrams show all the rows in the pattern from the right side. RAGLAN: Increase every 2nd round as follows: Increase as follows before the marker thread: Start 1 stitch before the marker thread: Make 1 yarn over, knit 1, marker thread. Increase as follows, after the marker thread: Marker thread, knit 1, make 1 yarn over. On the next round work the yarn overs knit, there will be holes. Increase every 4th round as follows: Increase as follows before the marker thread: ROUND 1: Start 1 stitch before the marker thread: Make 1 yarn over, knit 1, marker thread. ROUND 2: Yarn overs worked knit, there will be holes. ROUND 3: Start 3 stitches before the marker thread: Knit 2 together, make 1 yarn over, knit 1, marker thread. No increase in stitches, but the row of holes is continued as before. ROUND 4: Yarn overs worked knit, there will be holes. Increase as follows, after the marker thread: ROUND 1: Marker thread, knit 1, make 1 yarn over. ROUND 2: The yarn overs are worked knit, there will be holes. ROUND 3: Marker thread, knit 1, make 1 yarn over, slip 1 stitch as if to knit, knit 1, pass the slipped stitch over the knitted stitch. No increase in stitches, but the row of holes continues as before. ROUND 4: The yarn overs are worked knit, there will be holes. DECREASE TIP: Start 3 stitches before the marker thread: Knit 2 together, knit 2 (the marker thread sits between these 2 stitches), slip 1 stitch as if to knit, knit 1, pass the slipped stitch over the knitted stitch = 2 stitches decreased. INCREASE TIP: Work until there is 1 stitch left before the marker thread. Make 1 yarn over, knit 2 (the marker thread sits between these 2 stitches) and make 1 yarn over. On the next round work the yarn overs twisted knit to prevent holes (the increased stitches are worked in stockinette stitch). --------------------------------------------------------- JUMPER: The piece is worked in the round on circular needle from mid back, top down. YOKE: Cast on 80-84-88-92-96-100 stitches with circular needle size 4 mm / US 6 and Muskat. Work 2 RIDGES – see description above, on the last round of the ridges increase 20 stitches evenly along the round = 100-104-108-112-116-120 stitches. Insert 4 marker threads in the piece as follows: first marker thread after 19-20-21-22-23-24 stitches (= half the back piece), second marker thread after 12 new stitches (= sleeve), third marker thread after 38-40-42-44-46-48 new stitches (= front piece), fourth marker thread after 12 new stitches (= sleeve), there are 19-20-21-22-23-24 stitches left on the needle after the last marker thread (= half the back piece). Begin with increase to raglan as described above, work stockinette stitch across the stitches on the back piece and front piece and A.1 across the sleeve stitches. The increases are different for the front piece/back piece and the sleeves as follows: FRONT PIECE/BACK PIECE: Increase every 2nd round 12-15-17-25-30-35 times, then every 4th round 7-7-7-4-3-2 times. SLEEVES: Increase every 2nd round 22-27-31-33-32-31 times, then every 4th round 2-1-0-0-2-4 times. When A.1 has been completed 1 time in height, repeat A.2 in height. The increased stitches on the sleeves are worked in to A.2 as you go. REMEMBER THE GAUGE! After all the increase to raglan, there are 272-304-328-360-384-408 stitches on the needle. The next round is worked as follows: Work 38-42-45-51-56-61 stitches (= half the back piece), work the next 60-68-74-78-80-82 stitches and place these stitches on a thread (=sleeve), work the next 76-84-90-102-112-122 stitches (= front piece), work the next 60-68-74-78-80-82 stitches and place these stitches on a thread (= sleeve), work the last 38-42-45-51-56-61 stitches (= half the back piece). BODY: Continue working as follows: work half of the back piece, cast on 8-8-10-10-12-14 new stitches, work the front piece, cast on 8-8-10-10-12-14 new stitches, work half of the back piece. There are now 168-184-200-224-248-272 stitches on the body. Insert a marker thread in each side, in the middle of the new stitches which were cast on. THE PIECE IS NOW MEASURED FROM HERE. Continue with stockinette stitch across all the stitches. When the piece measures 4 cm / 1½" decrease 1 stitch on each side of the marker threads (= 4 stitches decreased), decrease every 3 cm / 1" in total 4 times – READ DECREASE TIP = 152-168-184-208-232-256 stitches. When the piece measures 19-19-19-18-18-19 cm / 7½"-7½"-7½"-7"-7"-7½"' increase 1 stitch on each side of the marker threads (= 4 stitches increased), increase every 2 cm / ¾" in total 6 times – READ INCREASE TIP = 176-192-208-232-256-280 stitches. When the piece measures 32-32-32-33-33-32 cm / 12½"-12½"-12½"-13"-13"-12½" work A.3 across all stitches. Then bind off with knit, the piece measures approx. 54-56-58-60-62-64 cm / 21¼"-22"-22¾"-23⅝"-24⅜"-25¼" from the shoulder. SLEEVE: The sleeve is worked on a short circular needle/double pointed needles. Place the stitches for the sleeve back on a short circular needle size 4 mm / US 6, knit up 1 stitch in each of the 8-8-10-10-12-14 stitches under the sleeve = 68-76-84-88-92-96 stitches. Insert 1 marker thread mid under sleeve. THE PIECE IS NOW MEASURED FROM HERE! Continue with A.2 across all stitches. When the piece measures 4-4-4-4-4-2 cm / 1½"-1½-"1½"-1½"-1½"-¾" decrease 1 stitch on each side of the marker thread. Decrease every 2½-1½-1-1-1-1 cm / ⅞"-½"-⅜"-⅜"-⅜"-⅜" in total 8-10-12-12-12-12 times = 52-56-60-64-68-72 stitches. When the piece measures 24-22-21-20-19-16 cm / 9½"-8¾"-8¼"-8"-7½"-6¼" work 2 ridges across all the stitches, then bind off with knit. Work the other sleeve the same way. |
|||||||||||||
Diagram explanations |
|||||||||||||
|
|||||||||||||
![]() |
|||||||||||||
![]() |
|||||||||||||
Have you finished this pattern?Tag your pictures with #dropspattern #petronellasweater or submit them to the #dropsfan gallery. Do you need help with this pattern?You'll find 24 tutorial videos, a Comments/Questions area and more by visiting the pattern on garnstudio.com. © 1982-2025 DROPS Design A/S. We reserve all rights. This document, including all its sub-sections, has copyrights. Read more about what you can do with our patterns at the bottom of each pattern on our site. |
Post a comment to pattern DROPS 175-31
We would love to hear what you have to say about this pattern!
If you want to leave a question, please make sure you select the correct category in the form below, to speed up the answering process. Required fields are marked *.