Grethe Netland Dypvik wrote:
Hei,Hvilket garn kan jeg bytte i for å strikke BlackBerry fizz jakka.Vil gjerne strikke i pinne 3-4 men ikke i det alpakkagarnet som er i oppskriften.mvh Grethe
16.01.2018 - 14:28DROPS Design answered:
Hei Grethe. Du kan bytte ut Alpaca med andre kvaliteter vi har i garngruppe A, bare husk at du må ha samme strikkefasthet som er oppgitt i oppskriften. God Fornøyelse!
17.01.2018 - 08:03Maria wrote:
Was bedeuten die (24M) oder +(17M) an den Bildern.Ich kann das nicht verstehen da doch die Maschenanzahl in der Anleitung sind?
15.11.2017 - 12:18DROPS Design answered:
Liebe Maria, die Maschenanzahl an den Bildern ist die Maschenanzahl für 10 cm (meistens glatt oder kraus rechts gestrickt), "+" ist wenn mehr als 1 Wolle/Qualität gestrickt wird. Viel Spaß beim stricken!
15.11.2017 - 13:20
Minna Pikkarainen wrote:
MIksi suomenkielisessä ohjeessa ei näy kaavioita eikä piirroksia?
29.09.2017 - 12:46DROPS Design answered:
Nyt kaavion tulisi aueta.
02.10.2017 - 17:44
Vicky Williams wrote:
Do love the colour combinations on this cardigan. Looks interesting to knit!
24.06.2017 - 01:33
Conny wrote:
Möchte ich sehr gerne nacharbeiten
07.06.2017 - 14:39
Silvia wrote:
Meraviglia di modello e di colore!!!!!
01.06.2017 - 17:16
Blueberry Fizz Jacket#blueberryfizzjacket |
||||||||||||||||||||||||||||
![]() |
![]() |
|||||||||||||||||||||||||||
Knitted jacket with round yoke, multi-colored Norwegian pattern and A-shape, worked top down. Sizes S - XXXL. The piece is worked in DROPS Alpaca.
DROPS 180-8 |
||||||||||||||||||||||||||||
INFORMATION FOR THE PATTERN: RIDGE/GARTER STITCH (worked back and forth): 1 ridge = Knit 2 rows. DECREASE/INCREASE TIP: To work out how to decrease/increase evenly, count the total number of stitches on the needle (e.g. 132 stitches), minus the bands (e.g. 10 stitches) and divide by the number of decreases/increases to be made (e.g. 17) = 7.1. In this example, decrease by knitting together every 6th and 7th stitch. Do not decrease over the bands. If you are increasing, make 1 yarn over after approx. every 7th stitch, on the next row work the yarn overs twisted into the pattern so that there are no holes. ELEVATION: Insert 1 marker mid back. Start from the right side with old pink and knit until 8-8-8-9-9-10 stitches past the marker, turn, tighten the strand and purl 16-16-16-18-18-20 stitches. Turn, tighten the strand and knit 24-24-24-27-27-30 stitches, turn, tighten the strand and purl 32-32-32-36-36-40 stitches. Continue back and forth in this way by working 8-8-8-9-9-10 more stitches each time you turn (remember to tighten the strand when you turn) until you have worked back and forth over a total of 64-64-64-72-72-80 stitches and the last row is from the wrong side. Turn, tighten the strand and knit to the end of row, turn, tighten the strand and purl 1 row from the wrong side (knit the band). PATTERN: See diagram A.1. Choose diagram for your size. The whole pattern is worked in stockinette stitch. KNITTING TIP-1 (for bands): When working pattern-borders with 2 colors on the yoke, work the background color in the border on the 5 band stitches as well. KNITTING TIP-2: To avoid the knitting gauge becoming tighter when you work pattern, it is important that the strands at the back of the piece are not tight. You can increase a needle size when working pattern if this is a problem. INCREASE TIP (for the sides in the body): All increases are made from the right side! Start 1 stitch before the marker thread, make 1 yarn over, knit 2 (the marker thread sits in the middle of these 2 stitches), make 1 yarn over (= 2 stitches increased). On the next row (wrong side) purl the yarn overs twisted to prevent holes. DECREASE TIP (for mid under the sleeve): Start 3 stitches before marker thread, knit 2 together, knit 2 (the marker thread sits in the middle of these 2 stitches), slip 1 stitch as if to knit, knit 1, pass the slipped stitch over the knitted stitch (= 2 stitches decreased). BUTTONHOLE: Work buttonholes on the right band (when the garment is worn): Work from the right side until there are 3 stitches left, make 1 yarn over, knit 2 together and knit the last stitch. On the next row knit the yarn over so that there is a hole. The first buttonhole is worked when the rib in the neck measures approx. 1½-2 cm / ½"-¾". Then work the next 6-6-6-7-7-7 buttonholes with approx. 8½ cm / 3¼" between each one. ---------------------------------------------------------- JACKET: The piece is worked back and forth on circular needle from mid front and top down. The sleeves are worked in the round with short circular needle, top down, change to double pointed needles when necessary. NECKLINE: Cast on 132-136-140-148-152-160 stitches (including 5 band stitches in each side towards mid front) with circular needle size 2.5 mm / US 1.5 and old pink. Purl 1 row (= wrong side). The next row is worked as follows from the right side. Work 5 band stitches in GARTER STITCH – see description above, * knit 2, purl 2 *, repeat from *-* until there are 7 stitches left on the row, knit 2 and finish with 5 band stitches in garter stitch. Continue the rib in this way – remember BUTTONHOLE on right band – see description above. When the rib measures 2-2-2-3-3-3 cm / ¾"-¾"-¾"-1⅛"-1⅛"-1⅛" knit 1 row from the right side where you decrease 17 stitches in all sizes evenly on row – read DECREASE/INCREASE TIP = 115-119-123-131-135-143 stitches. Continue to work the yoke as described below. YOKE: Read KNITTING TIP-1 and 2! Change to circular needle size 3 mm / US 2.5. Purl 1 row from the wrong side with 5 band stitches knit in each side. For a better fit, you can now work an ELEVATION in the back of the neck – see description above. When the elevation has been completed, work the next row from the right side as follows: 5 band stitches in garter stitch, work A.1A until there are 6 stitches left on the needle (= 26-27-28-30-31-33 repeats of 4 stitches), work A.1B (= 1 stitch) and finish with 5 band stitches in garter stitch. Continue the pattern in this way and at the same time increase on each row marked with an arrow in A.1A as described below – remember DECREASE/INCREASE TIP (always increase on a row from the right side) and REMEMBER THE GAUGE! Arrow-1: Increase 36-40-44-48-52-56 stitches evenly on row = 151-159-167-179-187-199 stitches. Arrow-2: Increase 36-38-40-44-48-50 stitches evenly on row = 187-197-207-223-235-249 stitches. Arrow-3: Increase 28-34-36-40-48-50 stitches evenly on row = 215-231-243-263-283-299 stitches. Arrow-4: Increase 28-34-40-40-44-48 stitches evenly on row = 243-265-283-303-327-347 stitches. Arrow-5: Increase 26-34-34-38-44-48 stitches evenly on row = 269-299-317-341-371-395 stitches. Arrow-6: Increase 26-32-34-38-40-40 stitches evenly on row = 295-331-351-379-411-435 stitches. Arrow-7: Increase 24-28-32-36-40-40 stitches evenly on row = 319-359-383-415-451-475 stitches. Arrow-8: Increase 20-20-28-28-32-32 stitches evenly on row = 339-379-411-443-483-507 stitches. When A.1 has been completed, the piece measures approx. 24-24-24-28-28-28 cm / 9½"-9½"-9½"-11"-11"-11" from the cast-on edge mid front. Continue stockinette stitch with navy/purple and 5 band stitches in garter stitch in each side until the piece measures 24-25-26-28-30-32 cm / 9½"-9¾"-10¼"-11"-11¾"-12½" from the cast-on edge mid front (if the knitting gauge is right in height, this measurement is reached in S and XL when A.1 has been completed). The next row is worked as follows from the right side: Knit the first 54-59-63-69-76-82 stitches (= front piece), place the next 67-77-85-89-95-95 stitches on 1 thread for sleeve, cast on 8-8-10-10-12-14 new stitches on the needle (= in the side under the sleeve), knit the next 97-107-115-127-141-153 stitches (= back piece), place the next 67-77-85-89-95-95 stitches on 1 thread for sleeve, cast on 8-8-10-10-12-14 new stitches on the needle (= in the side under the sleeve) and knit the remaining 54-59-63-69-76-82 stitches (= front piece). Body and sleeves are now finished separately. THE PIECE IS NOW MEASURED FROM HERE! BODY: = 221-241-261-285-317-345 stitches. Insert 1 marker thread 58-63-68-74-82-89 stitches in from each side (= 105-115-125-137-153-167 stitches between marker threads on the back piece). Work stockinette stitch back and forth with navy/purple and 5 band stitches in garter stitch in each side towards mid front. When the piece measures 1-1-2-2-2-2 cm / ½"-½"-¾"-¾"-¾"-¾" from the separation, increase 2 stitches in each side – read INCREASE TIP (= 4 stitches increased). Increase in this way every 8th row (approx. every 2½ cm / ⅞") to finished length (if the knitting gauge is right in height, increase 13 times in each side). When the piece measures 32-33-34-34-34-34 cm / 12½"-13"-13½"-13½"-13½"-13½" from the separation, there are approx. 273-293-313-337-369-397 stitches on the needle. Work 4 ridges back and forth over all stitches. Then bind off with knit from the right side, but to avoid the bind-off edge being tight you can make 1 yarn over after approx. every 8th stitch at the same time as you bind off (the yarn overs are bind off as normal stitches). The jacket measures approx. 58-60-62-64-66-68 cm / 22¾"-23⅝"-24⅜"-25¼"-26"-26¾" from the shoulder down. SLEEVE: Place the 67-77-85-89-95-95 stitches from the thread in one side of the piece on short circular needle size 3 mm / US 2.5, in addition knit up 1 stitch in each of the 8-8-10-10-12-14 stitches cast on under the sleeve with navy/purple = 75-85-95-99-107-109 stitches. Insert 1 marker thread in the middle of the 8-8-10-10-12-14 stitches under the sleeve. Start the round here and work stockinette stitch in the round. When the sleeve measures 2-2-2-2-3-3 cm / ¾"-¾"-¾"-¾"-1"-1" from the separation, decrease 2 stitches mid under the sleeve – read DECREASE TIP. Decrease in this way every 2½-2-1½-1½-1-1 cm / ⅞"-¾"-½"-½"-⅜"-⅜" a total of 12-16-19-20-23-23 times = 51-53-57-59-61-63 stitches. Continue working until the sleeve measures 34-34-33-32-30-28 cm / 13½"-13½"-13"-12½"-11¾"-11" from the separation (shorter measurements in larger sizes because of longer yoke). Knit 1 round where you increase 17-19-19-21-19-21 stitches evenly on round = 68-72-76-80-80-84 stitches. Change to double pointed needles size 2.5 mm / US 1.5 and work rib in the round (= knit 2 /purl 2). When the rib measures 8 cm / 3⅛" (or desired length) bind off with knit over knit and purl over purl, but to avoid the bind-off edge being tight, you can make 1 yarn over after every 4th stitch AT THE SAME TIME as you bind off (yarn overs bind off as normal stitches). The sleeve measures approx. 42-42-41-40-38-36 cm / 16½"-16½"-16"-15¾"-15"-14¼" from the separation. Work the other sleeve in the same way. ASSEMBLY: Sew the buttons onto the left band. |
||||||||||||||||||||||||||||
Diagram explanations |
||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||
Have you finished this pattern?Tag your pictures with #dropspattern #blueberryfizzjacket or submit them to the #dropsfan gallery. Do you need help with this pattern?You'll find 32 tutorial videos, a Comments/Questions area and more by visiting the pattern on garnstudio.com. © 1982-2025 DROPS Design A/S. We reserve all rights. This document, including all its sub-sections, has copyrights. Read more about what you can do with our patterns at the bottom of each pattern on our site. |
Post a comment to pattern DROPS 180-8
We would love to hear what you have to say about this pattern!
If you want to leave a question, please make sure you select the correct category in the form below, to speed up the answering process. Required fields are marked *.