Sharon Hunt wrote:
Decreasing after working 2.5 cm after which I do the increases. Do I start counting for the next group of increases after working the yo’s as instructed?
17.09.2024 - 22:37DROPS Design answered:
Dear Mrs Hunt, measure 2,5 cm straight in your piece and count how many rows/rounds you need to get this height, let's say 5,5 (if your tension is right), then increase every 6th round. Happy knitting!
18.09.2024 - 08:29
Sharon Hunt-Edwards wrote:
Hi Can I use use a traveling marker where I had a marker that designated the beg of the round? “When piece measures 3 cm / 1'', inc 1 st on each side of each marker in the sides” are thes new markers between the 8 sts cast on for each sleeve? 🙏 for responding.
16.09.2024 - 20:05DROPS Design answered:
Hi Sharon, Yes, you can allow the marker(s) to follow your work onwards. The markers in each side are in the middle of the cast-on stitches under the sleeves, i.e., with 4 stitches on each side. Happy knitting!
17.09.2024 - 07:02
Sharon Hunt wrote:
Hi After completing the yoke which has a length of 9,5 inches do one continue with straight knitting to get yoke’s length before dividing for sleeves? Am at round 39, L is 7,5 may av to adjust but wondering because from my shoulder to under breasts is 15 inches. Making xxxl.
01.09.2024 - 13:59DROPS Design answered:
Dear Mrs Hunt, if your tension is tighter just continue working stocking stitch after A.1 until you reach the measurement for your size (measure on mid front from cast on edge). Happy knitting!
02.09.2024 - 08:42
Darla wrote:
Why No One Cares About Attorneys Accidents attorneys accidents
02.02.2024 - 13:52
Meg wrote:
Hello! I have completed the yoke. When continuing on, am I to add separate balls of yarn for each section (backs, front)? Also, I am not clear on where the 8 cast on stitches should end up. Are they cast on and worked with the backs? Or the front? Thank you for any help you can offer.
13.03.2022 - 04:14DROPS Design answered:
Dear Meg, the 8 sts cast on when dividing yoke are exactly between front and back pieces, they are cast on to replace stitches for sleeve - look at this lesson you will see from picture 9) how the piece is divided, stitches on sleeve slipped on a thread and new stitches cast on under sleeve and how continuing in the round. Happy knitting!
14.03.2022 - 14:12
Rosy Córdoba wrote:
Gracias por sus patrones, he tenido la oportunidad de hacer varias bufandas y gorras y me encantan. Bendiciones.
09.11.2019 - 15:00
Anne Wekking wrote:
Waar kan ik paris krijgen in zwart
17.12.2018 - 19:15
Séverine Droumaguet wrote:
Bonjour, Dans les explications, il est écrit: Tricoter les 32 premières m (= demi-dos) EN MÊME TEMPS, glisser les 40m suivantes sur un arrêt de mailles (= manche), monter 8 m sous la manche, placer un marqueur au milieu de ces 8 m, Comment monter les 8m sous la manche ? je ne comprends pas comment m'y prendre... Merci pour votre aide,
08.10.2017 - 17:18DROPS Design answered:
Bonjour Mme Droumaguet, on tricote les premières mailles du dos en augmentant en même temps 2 mailles en taille XXXL donc, en taille S, tricotez les 32 premières mailles du demi-dos sans augmenter, et glissez les 40 m suivante en attente, montez 8 m (voir vidéo, tricotez les 65 m suivantes sans augmenter en taille S, glissez les 40 m suivantes en attente, montez 8 m et tricotez les 33 dernières mailles sans augmenter = 146 m. Bon tricot!
09.10.2017 - 09:14
Stevengep wrote:
Fj1818 buy sildenafil du7865dl4642lm8932 vc2252il8901wz5276
13.11.2016 - 13:32
Marietta wrote:
Hallo, leider hab ich schon bei der Passe eine Frage. es wir Beschrieben, dass für Größe M 86M angeschlagen werden sollen. Sollen nun zeitgleich verteilt 6M zugenommen und 29 Umschläge aufgenommen werden? alles in der ersten Runde der Krausrippe? Gruß Marietta
17.05.2016 - 14:09DROPS Design answered:
Liebe Marietta, ja die Aufnahmen werden nach dem Anschlag, in der ersten Rd rechts gemacht.
18.05.2016 - 17:37
Vanilla Summer#vanillasummerdress |
||||||||||||||||
![]() |
![]() |
|||||||||||||||
Knitted DROPS dress with short sleeves, round yoke and lace pattern in ”Paris”. Worked top down. Size: S - XXXL.
DROPS 159-6 |
||||||||||||||||
GARTER ST (worked in the round): * K 1 round and P 1 round *, repeat from *-*. 1 ridge = 2 rounds. PATTERN: See diagrams A.1-A.2. DECREASE TIP: Dec as follows before marker: Work until 3 sts remain before marker, K 2 tog, K 1. Dec as follows after marker: = K 1, slip 1 st as if to K, K 1, psso INCREASE TIP: Work until 1 st remains before marker, 1 YO, K 2 (marker is between sts), 1 YO. On next round work YO twisted to avoid holes. ---------------------------------------------------------- YOKE: YOKE: Worked top down in the round on circular needle. Cast on 82-86-88-92-96-100 sts on circular needle size 4.5 mm / US 7 with Paris. Work 1 ridge in GARTER ST - see explanation above AT THE SAME TIME on first round inc 6-6-6-12-12-12 sts evenly = 88-92-94-104-108-112 sts. Work 1 ridge while AT THE SAME TIME on first round inc 22-29-38-39-46-53 sts evenly (inc with YO - P YOs twisted on next round, they should not make holes) = 110-121-132-143-154-165 sts. Switch to circular needle size 5 mm / US 8. Then work A.1 10-11-12-13-14-15 times in total in width. REMEMBER THE KNITTING GAUGE When A.1 has been worked 1 time vertically, there are 210-231-252-273-294-315 sts on needle. Piece measures approx. 22-22-23-23-24-24 cm / 8 3/4"-8 3/4"-9"-9"-9½"-9½". Work next round as follows: Work the first 32-36-40-44-47-51 sts (= half back piece) AT THE SAME TIME inc 0-0-0-0-0-2 sts evenly, slip the next 40-44-46-48-53-56 sts on a stitch holder (= sleeve), cast on 8 new sts under sleeve, insert a marker in the middle of these 8 sts, work the next 65-71-80-89-94-101 sts (= front piece) AT THE SAME TIME inc 0-0-0-0-0-5 sts evenly, slip the next 40-44-46-48-53-56 sts on a stitch holder (= sleeve), cast on 8 new sts under sleeve, insert a marker in the middle of these 8 sts, work the remaining 33-36-40-44-47-51 sts (= half back piece). AT THE SAME TIME inc 0-0-0-0-0-2 sts evenly = 146-159-176-193-204-228 sts. BODY: Now work piece in stockinette st. Insert 1 marker in piece, NOW MEASURE PIECE FROM HERE. When piece measures 3 cm / 1'', inc 1 st on each side of each marker in the sides (= 4 sts inc) - READ INCREASE TIP, repeat inc every 6-6-3½-3½-2½-2½ cm / 2½"-2½"-1 1/4"-1 1/4"-7/8"-7/8" 7-7-12-13-17-17 more times = 178-191-228-249-276-300 sts. When piece measures 45-47-48-50-51-53 cm / 17 3/4"-18½"-19"-19 3/4"-20"-21", inc 2-1-0-3-0-0 st evenly on next round = 180-192-228-252-276-300 sts. Then work A.2 (= 12 sts) 15-16-19-21-23-25 times in width. Switch to circular needle size 4.5 mm / US 7. Work 2 ridges in garter st, bind off. SLEEVE: Work sleeves in the round on double pointed needles. Slip the 40-44-46-48-53-56 sts from stitch holder back on double pointed needles size 5 mm / US 8. Cast on 8 new sts under sleeve, insert a marker in the middle of these 8 sts = 48-52-54-56-61-64 sts. Insert 1 marker in piece, NOW MEASURE PIECE FROM HERE. Work in stockinette st. When piece measures 4 cm / 1½'', dec 1 st on each side of marker (= 2 sts dec) - READ DECREASE TIP! Repeat dec when piece measures 10 cm / 4'' = 44-48-50-52-57-60 sts. When piece measures 17 cm / 6 3/4", switch to double pointed needles size 4.5 mm / US 7 and work 2 ridges. Bind off. Work the other sleeve the same way. ASSEMBLY: Sew the opening under the sleeve. |
||||||||||||||||
Diagram explanations |
||||||||||||||||
|
||||||||||||||||
![]() |
||||||||||||||||
![]() |
||||||||||||||||
Have you finished this pattern?Tag your pictures with #dropspattern #vanillasummerdress or submit them to the #dropsfan gallery. Do you need help with this pattern?You'll find 25 tutorial videos, a Comments/Questions area and more by visiting the pattern on garnstudio.com. © 1982-2025 DROPS Design A/S. We reserve all rights. This document, including all its sub-sections, has copyrights. Read more about what you can do with our patterns at the bottom of each pattern on our site. |
Post a comment to pattern DROPS 159-6
We would love to hear what you have to say about this pattern!
If you want to leave a question, please make sure you select the correct category in the form below, to speed up the answering process. Required fields are marked *.