Annelies wrote:
Heel elegant! En dan nog gehaakt ook, super.
28.05.2015 - 09:35
Claudette Bigras wrote:
Vraiment magnifique! Élégance assurée!
27.05.2015 - 22:53
Cornelia Sutter wrote:
Sehr schön! will ich unbedingt haben.
27.05.2015 - 20:34
Henriette wrote:
Lijkt me niet echt moeilijk,is het gehaakt? Dan ga ik deze als eerst maken
27.05.2015 - 19:13Sandra wrote:
Beautiful! A must have..
27.05.2015 - 18:47
Daniela Massari wrote:
Finalmente uno scialle a uncinetto che non è da donna anziana
27.05.2015 - 18:38
Christine Davies wrote:
Fantastic! Another must make for me!
27.05.2015 - 16:58
Jo wrote:
Exquisitely stunning, gorgeous!!
27.05.2015 - 16:49
Gabriele wrote:
Super tolles elegantes Teil :-) ich werde es bestimmt nacharbeiten
27.05.2015 - 16:21Aurelia wrote:
Ein sehr elegantes Stück! Freu mich schon auf die Anleitung!
27.05.2015 - 14:55
Evening In Paris#eveninginparisscarf |
||||||||||||||||||||||||||||||||||||||||
![]() |
![]() |
|||||||||||||||||||||||||||||||||||||||
Crochet DROPS shawl with dc and lace pattern in ”BabyAlpaca Silk”.
DROPS 165-11 |
||||||||||||||||||||||||||||||||||||||||
MEASURING TIP: Always measure from the first ch worked and down along the tip of shawl. CROCHET INFO: Replace first dc at beg of every dc row with 3 ch. Replace first tr at beg of every tr row with 4 ch. At beg of every row with dtr replace first dtr with 5 ch + 1 ch (to avoid a tight edge) = 6 ch. PATTERN: See diagrams A.1-A.5. INC dc-GROUP: Work 2 dc in first dc, 1 ch (= tip), skip ch 1, 2 dc in next dc = 2 dc inc in tip. NOTE: On 3rd row in A.2, inc with double dc instead of dc! INCREASE TIP: On every row with dc (and A.2) inc with 2 dc in first and last st on every row and work a inc dc-group in the tip of shawl (= 4 dc inc on row). NOTE: On 3rd row in A.2, inc with double dc instead of dc! ---------------------------------------------------------- SHAWL: Worked back and forth. ROW 1 (= from WS): Work according to diagram A.1 as follows: Work 7 ch (= 1 dtr + 1 ch) - READ CROCHET INFO with BabyAlpaca Silk on hook size 3.5 mm/E/4. Work ch 1, (1 tr, ch 4, 1 tr) in first ch on row, work ch 2, insert a marker (= tip of shawl) - move it upwards until finished measurements, ch 2, (1 tr, ch 4, 1 tr) in first ch on row, ch 1, 1 dtr in first ch. ROW 2: Work 8 ch, 7 tr around next ch-space, ch 2, 1 tr around next ch-space (= tip), ch 2, 7 tr around ch-space, ch 2, 1 dtr in 6th ch on previous row. ROW 3: Work 8 ch, (1 tr, ch 4, 1 tr) in last ch from previous row, ch 2, 1 tr in each of the middle 3 tr, ch 2, skip next ch-space, (1 tr, ch 4, 1 tr) in the middle tr from previous row, 4 ch (= tip), (1 tr, ch 4, 1 tr) in same tr, ch 2, 1 tr in each of the middle 3 tr, ch 2, (1 tr, ch 4, 1 tr) in 6th ch from previous row, ch 2, 1 dtr in 6th ch on previous row. ROW 4: Work A.Z like this: 8 ch, skip 1 ch-space, 7 tr around next ch-space, 2 ch. Work A.1a as follows: 1 tr in the middle of the 3 tr, ch 2, skip 1 ch-space, 7 tr around next ch-space, 2 ch. Work 1 tr around next ch-space (= tip). Therafter work A.1b as follows: ch 2, 7 tr around next ch-space, ch 2, 1 tr in the middle of the next 3 tr. Work A:X as follows: ch 2, skip 1 ch-space, 7 tr around next ch-space, ch 2, 1 dtr in 6th ch on previous row. REMEMBER THE CROCHET GAUGE! ROW 5: Work A.X as follows: 8 ch, (1 tr, ch 4, 1 tr) in last ch from previous row, ch 2, 1 tr in each of the middle 3 tr, 2 ch. Work A.1b as follows: Skip 1 ch-space, (1 tr, ch 4, 1 tr) in next tr, ch 2, 1 tr in each of the middle 3 tr, 2 ch. Skip 1 ch-space (1 tr, ch 4, 1 tr) in the middle tr on shawl, 4 ch (= tip). Work A.1a as follows: (1 tr, ch 4, 1 tr) in same tr, skip 1 ch-space, ch 2, 1 tr in each of the middle 3 tr, ch 2, skip 1 ch-space, (1 tr, ch 4, 1 tr) in next tr, skip 1 ch-space. Work A.Z as follows: ch 2, 1 tr in each of the middle 3 tr, ch 2, skip 1 ch-space, (1 tr, ch 4, 1 tr) in 6th ch on previous row, ch 2, 1 dtr in 6th ch. ROWS 6-11: Continue with pattern as explained on 4th and 5th row, AT THE SAME TIME work A.1a and A.1b over the new inc sts in A.x and A.Z. There are now 5 tr groups vertically along tip of shawl and piece measures approx. 24 cm / 9½'' - READ MEASURING TIP. Now work A.2 as follows: Work 3 ch (= 1 dc), work 1 dc more in last tr from previous row (= 1 dc inc), continue with 1 dc in every tr and 1 dc around every ch until the middle ch-space (= tip), then work 1 dc around ch-space, 2 dc in the first of the two middle ch (= 1 dc inc), ch 1, 2 dc in next ch (= 1 dc inc), 1 dc around same ch-space. Continue with 1 dc in every tr and 1 dc around every ch and work 2 dc in 6th ch at beg of previous row (= 1 dc inc) = 4 dc inc in total and 156 dc on row (= 78 dc on each side of tip). Then continue from 2nd row in A.2, AT THE SAME TIME continue the same inc - READ INCREASE TIP and work an INC dc-GROUP - see explanation above, beg in dc before ch in the tip of shawl. NOTE: On 3rd work 1 ch before inc dc-group and before the last inc on row so that the pattern is symmetrical. (I.e. 2 extra dc are inc on next row when 1 dc is worked around these 2 extra ch). When entire A.2 has been worked 1 time vertically, there are 174 dc on row. Then work 5 rows of A.2 1 more time vertically the same way (= 22 dc inc) = 198 dc. Now continue inc as at beg of shawl as follows - see diagram A.3-A.5: ROW 1: Work 8 ch, * (1 tr, ch 4, 1 tr) in next dc, ch 2, skip 2 dc, 1 dc in each of the next 3 dc, ch 2, skip 2 dc *, repeat from *-* 11 more times, skip 1 dc, (1 tr, ch 4, 1 tr) in next dc (= first dc of the 2 middle dc), 4 ch (= tip), (1 tr, ch 4, 1 tr) in next dc (= second dc of the middle 2 dc), ** ch 2, skip 2 dc, 1 dc in each of the next 3 dc, ch 2, skip 2 dc, (1 tr, ch 4, 1 tr) in next dc **, repeat from **-** 11 more times, ch 2, 1 dtr in last dc on row. ROW 2: Work 8 ch, skip 1 ch-space, * 7 tr around next ch-space, ch 2, 1 tr in the middle of the 3 dc, ch 2, skip 1 ch-space *, repeat from *-* 11 more times, 7 tr around next ch-space, ch 2, 1 tr around next ch-space (= tip), ch 2, 7 tr around next ch-space, ** ch 2, 1 tr in the middle of the next 3 dc, ch 2, skip 1 ch-space, 7 tr around next ch-space **, repeat from **-** 11 more times, ch 2, 1 dtr in 6th ch on previous row. ROW 3: Work 8 ch, (1 tr, ch 4, 1 tr) in last ch from previous row, * ch 2, 1 tr in each of the middle 3 tr, ch 2, skip 1 ch-space, (1 tr, ch 4, 1 tr) in next tr, skip 1 ch-space *, repeat from *-* 11 more times, ch 2, 1 tr in each of the middle 3 tr, ch 2, skip 1 ch-space, (1 tr, ch 4, 1 tr) in next tr, 4 ch (= tip), (1 tr, ch 4, 1 tr) in same tr, ch 2, 1 tr in each of the middle 3 tr, ch 2, ** skip 1 ch-space, (1 tr, ch 4, 1 tr) in next tr, skip 1 ch-space, ch 2, 1 tr in each of the middle 3 tr, 2 ch **, repeat from **-** 11 more times, skip 1 ch-space, (1 tr, ch 4, 1 tr) in 6th ch on previous row, ch 2, 1 dtr in same ch. Now work A.2 as follows: Work 3 ch (= 1 dc), work 1 dc more in last tr on previous row (= 1 dc inc), continue with 1 dc in every tr and 1 dc around every ch until the middle ch-space on shawl (= tip), then work 1 dc around ch-space, 2 dc in the first of the two middle ch (= 1 dc inc), ch 1, 2 dc in next ch (= 1 dc inc), 1 dc around same ch-space. Continue with 1 dc in every tr and 1 dc around every ch and work 2 dc in 6th ch at beg of previous row (= 1 dc inc) 364 dc on row (= 182 dc on each side of tip). Then continue from 2nd row in A.2, AT THE SAME TIME continue the same inc and work an INC DC-GROUP - see explanation above, beg in dc before ch in the tip of shawl. NOTE: On 3rd row work 1 ch before inc dc-group and before the last inc on row to make it symmetrical. I.e. inc 2 dc on next row when working 1 dc around these ch 2, AT THE SAME TIME on last row inc 8 dc evenly (i.e. 4 dc on each side of tip) = 390 dc on row. Now continue from arrow in diagram A.3, A.4 and A.5 the same way as before but now work A.3 24 times in total before A.4 (= inc in tip), and A.5 24 times in width after A.4. When A.3-A.5 has been worked vertically, continue pattern and inc as shown on 2nd-5th row in diagram until piece measures 75 cm / 29½'' in total along tip - adjust to finish on a row which is like 4th row in diagram. Fasten off. |
||||||||||||||||||||||||||||||||||||||||
Diagram explanations |
||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||||||||||||||
Have you finished this pattern?Tag your pictures with #dropspattern #eveninginparisscarf or submit them to the #dropsfan gallery. Do you need help with this pattern?You'll find 8 tutorial videos, a Comments/Questions area and more by visiting the pattern on garnstudio.com. © 1982-2025 DROPS Design A/S. We reserve all rights. This document, including all its sub-sections, has copyrights. Read more about what you can do with our patterns at the bottom of each pattern on our site. |
Post a comment to pattern DROPS 165-11
We would love to hear what you have to say about this pattern!
If you want to leave a question, please make sure you select the correct category in the form below, to speed up the answering process. Required fields are marked *.