Grethe wrote:
Men på omg.7 og 11 og 15,skal det startes og sluttes med kast og to rette der også.Jeg skjønner kastet men ikke de to rette.
23.01.2012 - 09:27
DROPS Design wrote:
På hver p fra retten.
23.01.2012 - 08:45
Grethe wrote:
I mønster 2 står det at det er et kast og to rett både i sidene og midt bak.Er det på hver omgang i mønster 2 eller er det bare i første omg. av mønsteret.
23.01.2012 - 05:59
Drops Design France wrote:
Bonjour Le Diouron, Quand on a 45 m, on continue ainsi : avant la m centrale : X.1, M.1A, répéter M.1B, M.1C, X.2, on tricote la m centrale en jersey, puis : X.3, M.1, répéter M.1B, M.1C, X.4. Les diagrammes X.1 et X.4 se tricotent au début et à la fin du rang, X.2 et X.3 se tricotent de chaque côté de la m centrale. De chaque côté, on tricote ensuite M.1A, on répète M.1B autant que nécessaire et on termine par M.1C.
10.01.2012 - 10:48
Le Diouron wrote:
Bonjour n'y aurait il pas une erreur là :Continuer ainsi : Diagrammes X.1, M.1A, répéter M.1B (= 8 m) jusqu'à ce qu'il reste 6 m (ce nombre varie en fonction des rangs des diagrammes X.1-X.4) avant la m centrale, tricoter ces 6 dernières mailles en suivant les diagrammes M.1C et X.2, 1 m en jersey (m centrale), diagrammes X.3, j'ai un soucis a partir du deuxième rg au niveau de la maille centrale ça ne tombe pas juste ! merci
09.01.2012 - 20:24
Tina wrote:
Skal i gang med denne i aften. Håber ikke den er for svær.
09.12.2011 - 08:53
Drops Design wrote:
Aller øverst er det kun en forklaring til hvordan man strikker retstrik. Når du kommer ned i opskriften, begynder du "med ret på hver p" som der står i opskriften, herefter følger du diagrammerne. God fornøjelse!
11.11.2011 - 11:17
Lotte wrote:
Der står, at man skal strikke ret på alle pinde, men når jeg ser på billedet, ser det ud til at være glatstrik. I starten står der Strik alle omslag drejet, men på billedet er omslagene lige ved midtermasken ikke strikket drejet. Desuden kan jeg ikke lige helt se for mig, hvordan M.2 skal kunne strikkes langs med hele kanten af sjalet, da der ikke er nogen angivelse af, at man skal samle masker op for at strikke det?
11.11.2011 - 10:53
Jana Kiedroňová wrote:
Tento šátek je nádherný,jemný. Moc se mi líbí.
07.07.2011 - 22:47MARGARITA wrote:
Desde México, bellisimo encaje; ojalá sea para agujas no lo distingo bien pero bellísimo
16.06.2011 - 02:03
Garden of Diamonds#gardenofdiamondsshawl |
||||||||||||||||||||||
![]() |
![]() |
|||||||||||||||||||||
Knitted DROPS shawl with wave pattern in "Lace".
DROPS 131-2 |
||||||||||||||||||||||
PATTERN: See diagrams X.1, X.2, X.3, X.4, M.1 and M.2. GARTER ST (back and forth on needle): K all rows. --------------------------------------------------------- SHAWL: Worked back and forth on circular needle to make room for all the sts. Cast on 3 sts on circular needle size 3.5 mm / US 4 with Lace. Insert a marker in the 2nd st (mid st - marks mid back of shawl). Work 1 row as follows (= RS): K 1, 1 YO, K 1, 1 YO, K 1 = 5 sts. NOTE! On next row K YOs twisted, i.e. work in back loop of YOs instead of front, to avoid holes. Then K every row while at the same time inc 4 sts on every row from RS as follows: Work 2 sts in the second st and in the next to last st in each side and make 1 YO on each side of st with marker (still work YOs twisted). Continue like this until there are 29 sts on the needle. Then work as follows from RS: Diagram X.1, diagram M.1A (= 4 sts), diagram M.1C (= 5 sts) and diagram X.2, 1 st in stockinette st (= mid st), diagram X.3, diagram M.1A (= 4 sts), diagram M.1C (= 5 sts) and diagram X.4. When the repetition has been worked 1 time vertically, there are 45 sts on needle. Continue to work as follows: Diagrams X.1, M.1A, then repeat M.1B (= 8 sts) until 6 sts remain before mid st (no of sts varies depending on which row in diagrams X.1-X.4 is being worked), over these last 6 sts work diagram M.1C and X.2, 1 st in stockinette st (= mid st), work diagrams X.3, M.1A, repeat M.1B until 9 sts remain on row (no of sts varies depending on which row in diagrams X.1-X.4 is being worked), and work these in diagram M.1C and X.4. Continue like this until M.1 has been worked a total of 20 times vertically - the inc sts are worked gradually into diagram M.1. There are now 349 sts on needle, 174 sts on each side of mid st. Work 4 rows in stockinette st while AT THE SAME TIME continuing with edge sts each side in garter st and inc on every row from RS as before = 357 sts, 178 sts on each side of mid st. Now work as follows from RS: 4 edge sts in GARTER ST - see explanation above - 1 YO, K 2, 10 times diagram M.2, K 2 before mid st, 1 YO, 1 st in stockinette st (= mid st), 1 YO, K 2, 10 times diagram M.2, K 2, 1 YO, 4 edge sts in garter st. NOTE! The inc sts in the sides and mid back are worked in stockinette st until diagram M.2 has been worked. When diagram M.2 has been worked 1 time vertically, K 1 row from WS. Loosely bind off with K sts with 2 strands. BLOCKING: Place the shawl in lukewarm water until it is soaking wet. Carefully squeeze the water out of the shawl - do not twist the shawl - then roll the shawl in a towel and squeeze to remove more water - the shawl will now only be moist. Place the shawl on a carpet or mattress - carefully stretch it out to size and fasten it with pins. Leave to dry. Repeat the process when the garment has been washed. |
||||||||||||||||||||||
Diagram explanations |
||||||||||||||||||||||
|
||||||||||||||||||||||
![]() |
||||||||||||||||||||||
![]() |
||||||||||||||||||||||
Have you finished this pattern?Tag your pictures with #dropspattern #gardenofdiamondsshawl or submit them to the #dropsfan gallery. Do you need help with this pattern?You'll find 11 tutorial videos, a Comments/Questions area and more by visiting the pattern on garnstudio.com. © 1982-2025 DROPS Design A/S. We reserve all rights. This document, including all its sub-sections, has copyrights. Read more about what you can do with our patterns at the bottom of each pattern on our site. |
Post a comment to pattern DROPS 131-2
We would love to hear what you have to say about this pattern!
If you want to leave a question, please make sure you select the correct category in the form below, to speed up the answering process. Required fields are marked *.