DROPS Alpaca Party - 13 alpaca yarns on sale all October!

Tutorial Videos

Videos: 1745
15:52
How to work the slippers in DROPS Children 27-19

In this DROPS video we show to work the “Lemon Jelly” slippers in DROPS Children 27-19. By working with smaller needles than you normally do for DROPS Snow, you get a firmer slipper. But remember the needle size in the pattern are only the recommended size. We use needle 4 in the video and working according to size 20/21 (the smallest size). We have already cast on 24 stitches and show a bit of the 1st round which is knit and a bit of the 2nd round which is purled (= 1 RIGDE in garter stitch). Work garter stich until the piece measures 3 cm. Then the first 8 stitches of the round are kept on the needle and the remaining 16 stitches are put on 1 thread. Cast on 1 stitch at the beginning and 1 stitch at the end of the 8 stitches on the needle. Work garter stich back and forth until the work measures 4 from where the stitches were put on 1 thread. Cast off 1 stitch in each side. Knit up 6 stitches in each side and put the stitches on the thread back on the needle. Put 1 marking thread in the middle of the front and 1 in the middle of the back. When the piece measures 2 from the marker threads, decrease 1 stitch on each side of the marker threads, decrease like this every other round until the piece measures 4 cm. Then cast off the remaining stitches and sew the seam under the foot in outer loops of edge stitch. These slippers are worked in DROPS Snow, the same yarn we use in the video. You must read the pattern to be able to follow this video properly. You’ll find the pattern by clicking on the picture below.

10:43
How to increase and mark the increase stitches with stitch markers in English rib

In this DROPS video we show how to increase and mark the increase stitches with different colors, the same way we do in the «Cheers to Lift» jumper in DROPS 212-28. INCREASE AS FOLLOWS IN THE STITCHES WITH PURPLE MARKERS: Work 3 stitches in the stitch and yarn over and move the marker as follows: Knit together the yarn over and stitch, move the purple marker to this stitch (i.e. stitch on right needle), but do not slip the stitch and yarn-over off the left needle, make 1 yarn over the right needle and knit together the stitch and yarn over 1 more time = 3 stitches (= 2 stitches increased). The marker sits in the first increased stitch (= knitted stitch). The next time you increase, work in the stitch with the marker. INCREASE AS FOLLOWS IN THE STITCHES WITH GREEN MARKERS: Work 3 stitches in the stitch and yarn over and move the marker as follows: Knit together the yarn over and stitch, but do not slip the stitch and yarn-over off the left needle, make 1 yarn over the right needle and knit together the stitch and yarn over 1 more time and move the green marker to this stitch = 3 stitches (= 2 stitches increased). The marker sits in the last increased stitch (= knitted stitch). The next time you increase, work in the stitch with the marker. On the next round work the 3 stitches into the English rib pattern as follows: Make 1 yarn over, slip 1 stitch as if to purl, purl the yarn over, make 1 yarn over, slip 1 stitch as if to purl. This jumper is worked in DROPS Brushed Alpaca Silk and DROPS Glitter, but in the video we use DROPS Snow. You must read a pattern with this description to be able to follow this video properly. You’ll find a pattern by clicking on the picture below.