Jackets & Jumpers

Videos: 106
10:43
How to increase and mark the increase stitches with stitch markers in English rib

In this DROPS video we show how to increase and mark the increase stitches with different colors, the same way we do in the «Cheers to Lift» sweater in DROPS 212-28. INCREASE AS FOLLOWS IN THE STITCHES WITH PURPLE MARKERS: Work 3 stitches in the stitch and yarn over and move the marker as follows: Knit together the yarn over and stitch, move the purple marker to this stitch (i.e. stitch on right needle), but do not slip the stitch and yarn-over off the left needle, make 1 yarn over the right needle and knit together the stitch and yarn over 1 more time = 3 stitches (= 2 stitches increased). The marker sits in the first increased stitch (= knitted stitch). The next time you increase, work in the stitch with the marker. INCREASE AS FOLLOWS IN THE STITCHES WITH GREEN MARKERS: Work 3 stitches in the stitch and yarn over and move the marker as follows: Knit together the yarn over and stitch, but do not slip the stitch and yarn-over off the left needle, make 1 yarn over the right needle and knit together the stitch and yarn over 1 more time and move the green marker to this stitch = 3 stitches (= 2 stitches increased). The marker sits in the last increased stitch (= knitted stitch). The next time you increase, work in the stitch with the marker. On the next round work the 3 stitches into the English rib pattern as follows: Make 1 yarn over, slip 1 stitch as if to purl, purl the yarn over, make 1 yarn over, slip 1 stitch as if to purl. This sweater is worked in DROPS Brushed Alpaca Silk and DROPS Glitter, but in the video we use DROPS Snow. You must read a pattern with this description to be able to follow this video properly. You’ll find a pattern by clicking on the picture below.

12:11
How to increase to the sleeve caps in DROPS 212-14

In this DROPS video, we show how to increase after Increasing Tip-2 to the sleeve caps of the "Cloud Fluff" sweater in DROPS 212-14. We have a smaller number of stitches than what the patterns says. We show Increase tip-2 with the 1st and 2nd increases for the sleeve caps, how we move the markers and how to work the next round (we do not show how the front and back pieces are worked). INCREASE TIP-2, INCREASE 1 ON SLEEVE CAP IS WORKED AS FOLLOWS: Work 3 stitches in the stitch and yarn-over and move the marker as follows: Purl together the yarn-over and stitch, insert 1 marker in this stitch (i.e. stitch on right needle), but do not slip the stitch and yarn over off the left needle, make 1 yarn over the right needle and purl together the stitch and yarn-over 1 more time = 3 stitches (= 2 stitches increased). The marker sits in the first increased stitch (= purled stitch). The next increase is worked in the stitch with the marker. INCREASE TIP-2, INCREASE 2 ON SLEEVE CAP WORKED AS FOLLOWS: Work 3 stitches in the stitch and yarn over and move the marker as follows: Purl together the yarn over and stitch, but wait with slipping the stitch and yarn over off the left needle, make 1 yarn over the right needle, purl together the stitch and yarn-over 1 more time and insert the marker in this stitch = 3 stitches (= 2 stitches increased). The marker sits in the last increased stitch (= purled stitch). The next increase is worked in the stitch with the marker. On the next round work the 3 stitches as follows: Make 1 yarn over, slip 1 stitch as if to purl, knit the yarn over, make 1 yarn over, slip 1 stitch as if to purl. This sweater is worked in DROPS Sky and DROPS Kid-Silk but in the video we work with DROPS Snow. You must read the pattern to be able to follow this video properly. You’ll find the pattern by clicking on the picture below.