Carol wrote:
After row 2 do you still have to chain 3 before doing either 4 or 6 dc. In row 5 does the pattern stitch (graph) replace one of the dc at either end of the stitch sequence.
13.04.2018 - 20:48DROPS Design answered:
Dear Carol, the 3 ch in 2nd rown in diagram (= 1st row in A.z) will be worked only on this row ro replace 1st dc - see video. Happy crocheting!
16.04.2018 - 08:38Pearl B. Spodick wrote:
If the instructions are available for left-handed crocheters, I'm very interested as a self-taught crocheter. Usually I just do the instructions and it comes out fine.
01.04.2018 - 17:09DROPS Design answered:
Dear Pearl, we are sorry, but we don't have instrucions for left handed crafters. Each of us knits/crochet differently, and that is especially true for left handed persons. Some works like the mirror image of right handed work, others use special movements and/or tricks to make it work for them. However, it does not matter as long as it comes out looking as it should. Happy Crocheting!
01.04.2018 - 18:55
Sharon Hunt wrote:
This is such a lovely pattern. I hope to make it soon.
28.02.2018 - 16:49
Jean wrote:
Can the pattern be written out instead of having to follow the graph.
27.02.2018 - 03:32DROPS Design answered:
Dear Jean, we are sorry, but most of our patterns comes in charts /diagrams. It is well worth to learn how to read charts, they are visually more helpful. Also, don't forget that you can always ask for help to make sense of the patterns in person in the store you bought your DROPS pattern from. Happy crafting!
27.02.2018 - 09:07
Maida wrote:
Ich glaube Sie verstehen mich falsch. Im Video ist deutlich zu sehen dass nach der kleinsten Größe gearbeitet wird. in der allerersten Reihe werden nach A3 4 Stb gemacht und in der 2 Reihe (erste Reihe von A.z) werden 2 Stb gemacht. So wie es auch in der Anleitung steht. Aber in den nächsten Reihen sind es wieder 4 Stb und das ist eben in der Anleitung nirgends zu sehen.
16.02.2018 - 13:00DROPS Design answered:
Liebe Maida, die Einteilung mit den 4 Stb zwischen den Musterrapporten bleibt die ganze Zeit gleich, nur in der 1. R von A.Z werden das erste und das letzte dieser 4 Stb durch jeweils 3 Lm ersetzt. In den nachfolgenden Reihen von A.Z sind es dann wieder 4 Stb, so wie es für die allererste Reihe beschrieben ist.
16.02.2018 - 21:39
Maida wrote:
Nochmal ich. Tut mir Leid dass ich so viele Fragen habe. Mir kommt vor es fehlt ein Teil in der Anleitung. Und zwar immer die Stb zwischen den Diagrammen A1 bis A3. Im Video wird mit der kleinsten Größe gearbeitet: 1R. A1 - A3, 4 Stb, A1 - A3, ... 2R. A3 - A1, (laut schriftlicher Anleitung) 2 Stb in die mittleren Stb 3R. A1 - A3, (nur im Video zu sehen)1 Stb um den LM-Bogen, 2 Stb in die M, 1 Stb um den LM-Bogen 4R. A3 - A1,(nur im Video zu sehen) 4 Stb
15.02.2018 - 20:15DROPS Design answered:
Liebe Maida, m Video wird es mit A.1 angefangen und A.3 enden (wie man die Diagramme häkelt) aber Sie müssen wie in der Anleitung häkeln, dh bei der 1. Reihe (= Rückreihe) von links nach rechts lesen, dh mit A.3 anfangen - und mit nur 2 Stb in der 1. Größe (4 Stb zwischen Diagramme werden in die 2. Größe gehäkelt). Viel Spaß beim häkeln!
16.02.2018 - 09:31
Maida wrote:
Und zu der 2.R von A.z habe ich auch eine Frage. Im Video wird A1, A2, A3 gehäkelt. Dann im Mittelteil werden Stb gemacht. Woher bitte soll ich wissen wie und wie viele wenn es nirgends in der Anleitung steht was genau zwischen A3 und A1 zu machen ist?
14.02.2018 - 18:05DROPS Design answered:
Liebe Maida, im Video gibt es 4 Stb, in der Anleitung häkeln Sie je nach der Größe 2-4-7-11-4-9 Stb 2 x insgesamt zwischen 2 Rapporte A.1-A.3. Viel Spaß beim häkeln!
15.02.2018 - 08:58
Maida wrote:
Es geht nochmal um die 1.R. von A.z. Laut Video wird folgendes gemacht: A3, A2, A1, 3LM, 1 M überspringen, je 1 Stb in die nächsten 2 M, 3LM, FM (bzw KM) in die 2 zusammenabgemaschten Stb der Vorrunde? In der Anleitung steht es anders da, wovei es in der Anleitung mit der FM nach den 3 LM weniger Sinn ergibt.
14.02.2018 - 18:03DROPS Design answered:
Liebe Maida, Anleitung wird korrigiert, nach A.1 und vor den 2-9 Stb (siehe Größe) am Anfang der Reihe häkeln Sie nur 1 Lm und keine fM vor den Stb. Bei der 1. Reihe wird dann vor A.3: 3 LM, 1 fM in die nächste Masche gehäkelt, dann 1 Km. Viel Spaß beim häkeln!
15.02.2018 - 08:56
Maida wrote:
Hallo! ich versuche es nun mit dieser Anleitung und habe gleich ein paar Fragen. Im Anleitungsvideo für die Diagramme A1,A2,A3 werden für den Stern FM statt KM gemacht. Was ist nun richtig? Ich habe die erste Rückreihe (1 Reihe von A.z) nun beendet und will die zweite Reihe von A.z machen. Wiederhole ich hier immer wieder A1 bis A3 oder sind dazwischen noch andere Sachen zu beachten wie in den ersten beiden Reihen?
14.02.2018 - 10:53DROPS Design answered:
Liebe Maida, es sollte 1 Kett-M sein, dh wie im Diagram (und nicht wie im Video). Beim A.z häkeln Sie wie zuvor: A.1, A.2 wiederholen und mit A.3 enden. Viel Spaß beim häkeln!
14.02.2018 - 11:44
Monterrin Claudine wrote:
Bonjour, novice pour crocheter je me suis lancée dans ce modèle très joli (157-18). Dos : monter 29ml pour les manches je me raccroche au dos et continue sur celui-ci avec le rg4az, et à la fin je monte 31ml.Au retour sur ces 31ml je fais juste a1 et a3 du 1er rg ou de az. A la fin je ne vois comment faire avec mes 29 ml restantes
14.01.2018 - 13:53DROPS Design answered:
Bonjour Mme Monterrin, à la fin du rang, continuez le point fantaisie comme avant sur ces 29 ml = on crochète le 1er rang de A.1-A.3 sur les 31 ml et le 4ème rang de A.z (= A.1 pour commencer le rang, on répète A.2 jusqu'à ce qu'il reste 5 des 29 ml et on termine par A.3. Bon crochet!
15.01.2018 - 09:50
Shining Star#shiningstarcardigan |
||||||||||||||||||||||
![]() |
![]() |
|||||||||||||||||||||
Crochet DROPS jacket with lace pattern and shawl collar in ”Merino Extra Fine”. Size: S - XXXL.
DROPS 157-18 |
||||||||||||||||||||||
CROCHET INFO: Replace first dc at beg of every dc row with 3 ch. PATTERN: See diagrams A.1-A.3. ---------------------------------------------------------- BACK PIECE: Worked back and forth. Work 83-87-93-101-111-121 ch on hook size 5 mm / H/8 with Merino Extra Fine. Then work as follows from RS: Work A.1 – see explanation above, over the first 8 ch, NOTE: Replace 1st dc with 3 ch – see CROCHET INFO above, A.2 over the next 12-12-12-12-24-24 ch, A.3 over the next ch 5, 1 dc in each of the next 4-6-9-13-6-11 ch, A.1, A.2, A.3, 1 dc in each of the next 4-6-9-13-6-11 ch, A.1, A.2 over the next 12-12-12-12-24-24 ch and A.3. Then repeat A.z vertically until finished measurements. NOTE: On 1st row in A.z (= from WS) work as follows: Work A.3, A.2 1-1-1-1-2-2 times in width, A.1, 3 ch (replace 1 dc), 1 dc in each of the next 2-4-7-11-4-9 dc, 3 ch (replace 1 dc), 1 sc in next st, A.3, A.2, A.1, 3 ch (replace 1 dc), 1 dc in each of the next 2-4-7-11-4-9 dc, 3 ch (replace 1 dc), 1 sc in next st, A.3, A.2 1-1-1-1-2-2 times in width and A.1. REMEMBER THE CROCHET GAUGE! When piece measures approx. 45-46-47-48-49-50 cm / 17¾''-18''-18½''-19''-19¼''-19¾'', adjust to finish with 2nd row in A.z - cut the yarn. Then work sleeves as follows: Work 29 loose ch, beg from WS and continue A.3, A.2 and A.1 and dc over back piece as before and finish with 31 loose ch, turn piece. Now work 1st row in A.1-A.3 over ch from RS, AT THE SAME TIME continue with pattern over back piece as before (i.e. work 4th row in A.z over these sts) as follows: Work 1 dc in each of the first ch 6, A.1 over the next 8 ch, A.2 2 times in width (i.e. work last A.2 over the last ch 5, then work the rest of A.2 over A.1), work A.2 1-1-1-1-2-2 times in width as before, A.3, 1 dc in each of the next 4-6-9-13-6-11 dc, A.1, A.2, A.3, 1 dc in each of the next 4-6-9-13-6-11 dc, A.1, A.2 1-1-1-1-2-2 times in width, then work A.2 2 times in width (i.e. work the first A.2 over A.3 and the next 6 ch), A.3 over the next 5 ch and 1 dc in each of the last 6 ch. Continue this pattern until piece measures approx. 62-64-66-68-70-72 cm / 24 3/8''-25¼''-26''-26¾''-27½''-28 3/8'' - adjust to finish after a row from WS. Then finish each shoulder/sleeve separately as follows: RIGHT SHOULDER/SLEEVE: Work 6 dc, A.1 1 time and A.2 3-3-3-3-4-4 times, A.3, 1 dc in each of the next 4-6-9-13-6-11 dc. Turn and work pattern as before. Continue like this until piece measures 64-66-68-70-72-74 cm / 25¼''-26''-26¾''-27½''-28 3/8''-29 1/8'' in total, adjust to finish with a whole repetition of A.z. Fasten off. LEFT SHOULDER/SLEEVE: Work the left shoulder/sleeve the same way but reversed, work A.1 instead of A.3 at beg of row. RIGHT FRONT PIECE: Worked back and forth. Work 63-65-70-74-81-86 ch (includes 3 ch to turn with) on hook size 5 mm / H/8 with Merino Extra Fine. Work 1 dc in 4th ch from hook, 1 dc in each of the next 5-5-7-7-9-9 ch (= band), A.1 over the next 8 ch, A.2 over the next 12 ch, A.3 over the next ch 5, 1 dc in each of the next 4-6-9-13-6-11 ch, A.1 over the next 8 ch, A.2 over the next 12-12-12-12-24-24 ch, A.3 over the last 5 ch. Then repeat A.z vertically until finished measurements. NOTE: On 1st row in A.z (= from WS) work as follows: Work A.3, A.2 1-1-1-1-2-2 times in width, A.1, 3 ch (replace 1 dc), 1 sc in next st, 1 dc in each of the next 2-4-7-11-4-9 dc, 3 ch (replace 1 dc), A.3, A.2, A.1, 3 ch (replace 1 dc), 1 sc in next st, 1 dc in each of the next 5-5-7-7-9-9 dc. When piece measures approx. 45-46-47-48-49-50 cm / 17¾''-18''-18½''-19''-19¼''-19¾'', adjust to finish with 2nd row in A.z. Cut the yarn. Then work 29 loose ch for sleeve and continue as on back piece. When piece measures 64-66-68-70-72-74 cm / 25¼''-26''-26¾''-27½''-28 3/8''-29 1/8'', adjust to finish with a whole repetition of A.z (i.e. last row is from RS) - cut the yarn. Then work shawl collar. SHAWL COLLAR: Work shawl collar back and forth, beg from RS as follows: Work 1 dc in each of the first 6-6-8-8-10-10 dc, 1 dc in first dc on A.1, * 3 dc in next ch-space *, repeat from *-* 2 more times, 1 dc in next dc, * 3 dc in next ch-space *, repeat from *-* 2 more times, 1 dc in last dc in A.3, 0-0-0-1-1-1 dc in next dc = 27-27-29-30-32-32 dc. Then work short rows over band sts as follows: ROW 1 (WS): 5 sc, 5 hdc, 17-17-19-20-22-22 dc ROW 2 (RS): Work 1 dc in each of the 27-27-29-30-32-32 sts. Repeat these 2 rows until piece measures approx. 10 cm / 4'' on the most narrow part – adjust to finish with 2nd row (RS). Fasten off. LEFT FRONT PIECE: Work as right but reversed. Work according to diagram A.3 instead of A.1 at beg of row. When piece measures 45-46-47-48-49-50 cm / 17¾''-18''-18½''-19''-19¼''-19¾'', adjust to finish with 2nd row in A.z, work as before over front piece from WS, then work 31 loose ch for sleeve. When piece measures 64-66-68-70-72-74 cm / 25¼''-26''-26¾''-27½''-28 3/8''-29 1/8'', adjust to finish with a whole repetition of A.z (i.e. last row is from RS), work shawl collar. NOTE: There is no need to cut the yarn. ASSEMBLY: Place front pieces on top of back piece and work the shoulders as follows: 1 sc through both layers, * ch 3, 1 sc in next ch-space *, repeat from *-* along the entire shoulder/sleeve and finish with 1 sc. Work the sides tog as follows: 1 sc, * ch 3, 1 sc in ch-space on next row *, repeat from *-* along the entire side and finish with 1 sc. Work tog under sleeves as follows: * 1 sc in ch in next ch-space, 3 ch *, repeat from *-* and finish with 1 sc. |
||||||||||||||||||||||
Diagram explanations |
||||||||||||||||||||||
|
||||||||||||||||||||||
![]() |
||||||||||||||||||||||
![]() |
||||||||||||||||||||||
Have you finished this pattern?Tag your pictures with #dropspattern #shiningstarcardigan or submit them to the #dropsfan gallery. Do you need help with this pattern?You'll find 8 tutorial videos, a Comments/Questions area and more by visiting the pattern on garnstudio.com. © 1982-2025 DROPS Design A/S. We reserve all rights. This document, including all its sub-sections, has copyrights. Read more about what you can do with our patterns at the bottom of each pattern on our site. |
Post a comment to pattern DROPS 157-18
We would love to hear what you have to say about this pattern!
If you want to leave a question, please make sure you select the correct category in the form below, to speed up the answering process. Required fields are marked *.