Marta wrote:
Olá ! Gosto muito do modelo, gostava de conseguir fazer.
21.03.2014 - 20:20
Laura wrote:
I'm really struggling with the DPN and this yarn...any pointers?
24.02.2014 - 17:15DROPS Design answered:
Dear Laura, if you have problems with DPN, maybe you could try with magic loop - see video below ? Happy knitting!
25.02.2014 - 09:22
Matthildur Sigursveinsdottir wrote:
Hvenar kemur mynstur no Model as 013
28.01.2014 - 12:44
Andrée-Anne Mercier wrote:
Love you off-center motifs! Bold and beautiful!
11.01.2014 - 21:54
Bertina wrote:
Mooie trui en een mooie kleur
08.01.2014 - 09:34
Birthe Hanne Boesgaard wrote:
Virkelig flot
31.12.2013 - 14:01
Laura wrote:
Bellissimo... molto giovane e attuale
24.12.2013 - 14:06
Anna wrote:
Sweet! My favorite in this collection.
19.12.2013 - 22:16
Angelika Grebenstein wrote:
Ein schönes Frühlingsmodell
18.12.2013 - 12:38
Elisabeth wrote:
En underbart vacker feminin tröja. Spetsigt skir. Ljuvlig!!
15.12.2013 - 11:54
Cheryl#cherylsweater |
||||||||||||||||
|
||||||||||||||||
Knitted DROPS jumper with round yoke and lace pattern in ”Brushed Alpaca Silk”. Size: S - XXXL.
DROPS 154-13 |
||||||||||||||||
GARTER ST (in the round on circular needle): * K 1 round and P 1 round *, repeat from *-*. 1 ridge = 2 rounds. PATTERN: See diagrams A.1 and A.2. DECREASE TIP (applies to the body): Dec as follows before marker: K 2 tog. Dec as follows after marker: Slip 1 st as if to K, K 1, psso. INCREASE TIP: Inc 1 st by making 1 YO. On next round work YO twisted to avoid holes. -------------------------------------------------------- BODY: Worked in the round on circular needle. Cast on 224-256-288-320 sts on circular needle size 5 mm / US 8 with Brushed Alpaca Silk. Work 1 ridge in GARTER ST - see explanation above. K 1 round, then work rib = K 4/P 4. When piece measures 6 cm / 2 3/8'', work all P sts tog 2 by 2 = 168-192-216-240 sts. Insert 2 markers in the piece; 1 at the beg of round and 1 after 84-96-108-120 sts (= in each side). Then work in stockinette st. REMEMBER THE KNITTING GAUGE. When piece measures 7 cm / 2¾'', dec 1 st on each side of both markers - READ DECREASE TIP (= 4 sts dec). Repeat dec every 3½-4-4½-5 cm / 1 1/4"-1½"-1 3/4"-2" 3 more times (= 4 dec in total) = 152-176-200-224 sts. When piece measures 24-26-27-29 cm / 9½"-10 1/4"-10 5/8"-11 3/8", inc 1 st on each side of both markers – READ INCREASE TIP (= 4 sts inc). Repeat inc every 3 cm / 1'' 3 more times (= 4 inc in total) = 168-192-216-240 sts. When piece measures 35-39-41-45 cm / 13 3/4"-15 1/4"-16 1/8"-17 3/4", bind off 14-16-18-20 sts in each side for armholes (i.e. Bind off 7-8-9-10 sts on each side of both markers) = 70-80-90-100 sts remain on back/front piece. Put piece aside and knit the sleeves. SLEEVE: Worked in the round on double pointed needles. Cast on 48-52-56-60 sts on double pointed needles size 5 mm / US 8 with 1 strand Alpaca Silk. Work 2 ridges in GARTER ST - see explanation above. Then work in stockinette st. When piece measures 5 cm / 2'', insert 1 marker at the beg of round = mid under sleeve. On next round inc 1 st on each side of marker. Repeat inc every 5-3-2½-2 cm / 2"-1 1/8"-7/8"-3/4" 3-5-7-9 more times (= 4-6-8-10 inc in total) = 56-64-72-80 sts. When piece measures 24-25-26-27 cm / 9½"-9 3/4"-10 1/4"-10 5/8", bind off 14-16-18-20 sts mid under sleeve (i.e. Bind off 7-8-9-10 sts on each side of marker) = 42-48-54-60 sts remain on needle. Put piece aside and Make another sleeve. YOKE: Slip sleeves on to same circular needle as body = 224-256-288-320 sts. Work * A.1 (= 14 sts), A.2 (= 18 sts) *, repeat from *-* (= 7-8-9-10 repetitions of A.1 and A.2 in width). Switch to a shorter circular needle when needed. When A.1 and A.2 have been worked, 112-128-144-160 sts remain on needle. K 1 round AT THE SAME TIME dec 38-50-52-60 sts evenly = 74-78-92-100 sts. Cut the yarn. Then work an elevation at the back of neck as follows in stockinette st, insert 1 marker in middle st (= mid back) and beg here: K 7 sts past marker mid back, turn, tighten yarn and P 14 sts back, turn, tighten yarn and K 21 sts, turn, tighten yarn and P 28 sts back. Continue like this - work 7 sts more on every turn until a total of 56-56-70-70 sts have been worked, turn and K 1 round until mid back again. Work 2 ridges in garter st. Loosely bind off with K. Yoke measures approx. 23 cm / 9'' (mid front) and entire jumper measures approx. 58-62-64-68 cm / 22 3/4"-24½"-25 1/4"-26 3/4". ASSEMBLY: Sew the openings under the sleeves tog. |
||||||||||||||||
Diagram explanations |
||||||||||||||||
|
||||||||||||||||
![]() |
||||||||||||||||
![]() |
||||||||||||||||
Have you finished this pattern?Tag your pictures with #dropspattern #cherylsweater or submit them to the #dropsfan gallery. Do you need help with this pattern?You'll find 25 tutorial videos, a Comments/Questions area and more by visiting the pattern on garnstudio.com. © 1982-2025 DROPS Design A/S. We reserve all rights. This document, including all its sub-sections, has copyrights. Read more about what you can do with our patterns at the bottom of each pattern on our site. |
Post a comment to pattern DROPS 154-13
We would love to hear what you have to say about this pattern!
If you want to leave a question, please make sure you select the correct category in the form below, to speed up the answering process. Required fields are marked *.