Marianne wrote:
Ich verstehe das Muster nicht, für was braucht man den Blendenstreifen, wo sitzt er in der Zeichnung? Die Zahlenangaben bei Muster L scheinen nicht zu stimmen. Es passt nie. MFg Marianne
24.11.2026 - 12:44DROPS Design answered:
Liebe Marianne, in diesem Video zeigen wir, wie man die Blenden separat strickt (im Video Krausrechts, hier sollen Sie wie beschrieben stricken); und wie man dann die Maschen dazwischen anschlägt um die Passe zu stricken. An welcher Stelle soll die Maschenanzahl in L nicht stimmen, können Sie uns mehr sagen? Danke im voraus.
25.11.2026 - 08:02
Kyoto Cardigan#kyotocardigan |
|
![]() |
![]() |
Knitted jacket in DROPS Andes or DROPS Snow. Piece is knitted top down in stockinette stitch with raglan, V-neck, rolling edges and belt. Size
DROPS 272-10 |
|
|
---------------------------------------------------------- EXPLANATION FOR THE PATTERN: ---------------------------------------------------------- KNITTING TIP: When working short rows there will be a small hole when turning the piece - the hole can be closed by using the technique German Short Rows as follows: Slip first stitch purlwise with strand in front of piece. Place strand over right needle and tighten well at the back (should lead to two loops on needle). Work these loops together on next row. RAGLAN: All increases are done from right side. Increase 1 stitch by making 1 yarn over. On next row from wrong side work yarn overs as explained below: BEFORE RAGLAN STITCH (= twist yarn over towards the left): Purl yarn over in stitch loop behind the needle - to avoid holes. AFTER RAGLAN STITCH (= twist yarn over towards the right): Move yarn over from left needle to right needle purlwise, slip yarn over back on left needle by inserting left needle from behind in yarn over (yarn over is now twisted). Purl yarn over in stitch loop that is in front the needle - to avoid holes. V-NECK: All increases are done from right side. Increase 1 stitch by making 1 yarn over inside 11-11-11-11-13-13-13 band stitches. On next row from wrong side work yarn overs as explained below: AT THE BEGINNING OF ROW: Move yarn over from left needle to right needle purlwise, slip yarn over back on left needle by inserting left needle from behind in yarn over (yarn over is now twisted). Purl yarn over in stitch loop that is in front the needle - to avoid holes. AT THE END OF ROW: Purl yarn over in stitch loop that is behind the needle - to avoid holes. Work the new stitches in stockinette stitch. INCREASE TIP: When increasing stitches evenly in transition for rib, there will be an even increase if you increase where stitches are going to be purled, the stitches in stockinette stitch will then continue nicely over into rib. SLEEVE TIP: When picking up stitches mid under sleeve, there will be a small hole in the transition between stitches on body and sleeves. The holes can be closed by picking up the strand between two stitches - work this strand twisted together with the first stitch between body and sleeve to close the hole. DECREASE TIP (applies to mid under sleeves): Begin 3 stitches before marker and knit 2 together, knit 2 (marker is between these 2 stitches), slip 1 stitch knitwise, knit 1, pass slipped stitch over stitch worked (2 stitches decreased). ---------------------------------------------------------- START THE PIECE HERE: ---------------------------------------------------------- JACKET - SHORT OVERVIEW OF THE PIECE: In this pattern needles of different length have been used, begin with fitting length for number of stitches and switch as needed. First work 2 bands, then cast on stitches for yoke between bands. Work yoke back and forth on circular needle from mid front, and work top down with increases for raglan. When yoke is done, divide piece for body and sleeves. Work body downwards back and forth on circular needle while putting the sleeves aside. Then work sleeves downwards in the round on needle. Sew bands from each front piece together, seam = mid back, fasten band to stitches at the back of the neck. If 0 stitches are given for the chosen size, it means that you skip the information and jump to next information. RIGHT BAND: Cast on 11-11-11-11-13-13-13 stitches on needle size 8 MM = US 11 with 1 strand DROPS Andes or 1 strand DROPS Snow and work as follows: ROW 1 (= wrong side): Slip 1 stitch purlwise with strand in front of piece, knit 1, slip 1 stitch purlwise with strand in front of piece, knit 1, purl 7-7-7-7-9-9-9. ROW 2 (= right side): Knit 7-7-7-7-9-9-9, purl 1, knit 1, slip 1 stitch purlwise with strand in front of piece, knit 1. ROW 3 (= wrong side): Slip 1 stitch purlwise with strand in front of piece, knit 1, slip 1 stitch purlwise with strand in front of piece, knit 1, purl 4-4-4-4-6-6-6, turn piece. ROW 4 (= right side): Read KNITTING TIP, knit 4-4-4-4-6-6-6, purl 1, knit 1, slip 1 stitch purlwise with strand in front of piece, knit 1. Work 1st to 4th ROW until band measures 7-7-7-7½-7½-8½-8½ cm = 2¾"-2¾"-2¾"-2⅞"-2⅞"-3¼"-3¼" inside the most narrow part (band measures approx. 14-14-14-15-15-17-17 cm = 5½"-5½"-5½"-6"-6"-6¾"-6¾" at the edge along I-cord edge), then work 1st and 2nd ROW until entire band measures 17-17-17-17½-19½-20½-20½ cm = 6¾"-6¾"-6¾"-6⅞"-7⅝"-8⅛"-8⅛" inside the most narrow part, finish with a row from wrong side. Cut the yarn and put piece aside. LEFT BAND: Cast on 11-11-11-11-13-13-13 stitches on needle size 8 MM = US 11 with 1 strand DROPS Andes or 1 strand DROPS Snow and work as follows: ROW 1 (= wrong side): Purl 7-7-7-7-9-9-9, knit 2, slip 1 stitch purlwise with strand in front of piece, knit 1. ROW 2 (= right side): Slip 1 stitch purlwise with strand in front of piece, knit 1, slip 1 stitch purlwise with strand in front of piece, purl 1, knit 4-4-4-4-6-6-6, turn piece. ROW 3 (= wrong side): Remember KNITTING TIP, purl 4-4-4-4-6-6-6, knit 2, slip 1 stitch purlwise with strand in front of piece, knit 1. ROW 4 (= right side): Slip 1 stitch purlwise with strand in front of piece, knit 1, slip 1 stitch purlwise with strand in front of piece, purl 1, knit 7-7-7-7-9-9-9. Work 1st to 4th ROW until band measures 7-7-7-7½-7½-8½-8½ cm = 2¾"-2¾"-2¾"-2⅞"-2⅞"-3¼"-3¼" inside the most narrow part (band measures approx. 14-14-14-15-15-17-17 cm = 5½"-5½"-5½"-6"-6"-6¾"-6¾" at the edge along I-cord edge), then work only 1st and 4th ROW onwards (do not work 2nd and 3rd ROW), until entire band measures 17-17-17-17½-19½-20½-20½ cm = 6¾"-6¾"-6¾"-6⅞"-7⅝"-8⅛"-8⅛" inside the most narrow part, finish with a row from wrong side. Do not cut the yarn, work next row from right side as explained under YOKE. YOKE: Now cast on stitches for yoke between bands. Use circular needle size 8 MM = US 11 and work first row from right side as follows: Work left band as before, cast on 41-41-41-43-47-49-49 new stitches on row, work stitches from right band as before (over all stitches) = 63-63-63-65-73-75-75 stitches. Purl 1 row from wrong side while working the 4 outermost stitches in each side as before. Insert 4 markers in piece without working the stitches, insert markers in a stitch, these stitches are called raglan stitches and increase is done for raglan on each side of raglan stitches. Count 12-12-12-12-14-14-14 stitches (= left front piece), insert 1st marker in next stitch, count 11-11-11-11-13-13-13 stitches (= sleeve), insert 2nd marker in next stitch, count 13-13-13-15-15-17-17 stitches (= back piece), insert 3rd marker in next stitch, count 11-11-11-11-13-13-13 stitches (= sleeve), insert 4th marker in next stitch, 12-12-12-12-14-14-14 stitches remain after last marker (= back piece). INFORMATION BEFORE CONTINUING: Work in stockinette stitch back and forth but work the 4 outermost stitches in each side as before. AT THE SAME TIME increase for RAGLAN and V-NECK - read explanation above on how to increase and work as explained below - read both sections before continuing. Remember to follow the knitting gauge! RAGLAN: Increase for raglan on every other row, increase on each side of raglan stitches until 7-10-13-13-13-14-12 increases have been done in total (= 8 stitches increased every increase row). Remember to follow the knitting gauge! Then continue increase as follows: Increase for raglan on every other row on front pieces and back piece but on sleeves increase only every 4th row (= alternately 4 and 8 stitches increased), repeat this increase 8-6-4-6-6-6-10 times in total on front pieces and back piece and 4-3-2-3-3-3-5 times on sleeves. 15-16-17-19-19-20-22 increases have been done in total on front pieces and back piece and 11-13-15-16-16-17-17 increases on sleeves. After last increase piece measures approx. 21-23-24-27-27-29-31 cm = 8¼"-9"-9½"-10⅝"-10⅝"-11⅜"-12¼" from cast-on edge mid back. 1-1-0-1-1-1-1 increase remain for V-neck. Now divide yoke for body and sleeves V-NECK: Increase for V-neck every 6th row 3-3-3-4-4-5-5 times in total, increase inside the outermost 11-11-11-11-13-13-13 stitches in each side. Then increase for V-neck every 8th row 2 times in total = 5-5-5-6-6-7-7 increases done in total for V-neck in each side. DIVIDING FOR BODY AND SLEEVES: When dividing piece for body and sleeves the raglan stitches will be placed somewhat in on front piece/back piece, i.e. AT THE SAME TIME as next row is worked divide yoke for body and sleeves as follows: Work 33-35-37-39-42-45-47 stitches as before (= front piece), slip the next 31-33-37-39-39-39-39 stitches on a thread for sleeve, cast on 6-6-8-8-10-12-14 new stitches on row (= in the side mid under sleeve), work 47-51-53-59-61-67-71 stitches in stockinette stitch (= back piece), slip the next 31-33-37-39-39-39-39 stitches on a thread for sleeve, cast on 6-6-8-8-10-12-14 new stitches on row (= in the side mid under sleeve), and work the last 33-35-37-39-42-45-47 stitches as before (= front piece). Finish body and sleeves separately. BODY: = 125-133-143-153-165-181-193 stitches. Work in stockinette stitch with 4 edge stitches in each side as before. When last increase for V-neck is done, there are 127-135-143-155-167-183-195 stitches on row. Work until piece measures 45-47-49-51-51-53-55 cm = 17¾"-18½"-19¼"-20"-20"-21"-21⅝" from cast-on edge mid back. On next row from right side begin rib while AT THE SAME TIME increasing 20-24-24-24-28-32-32 stitches evenly on 1st row (do not increase over the 4 outermost stitches in each side) = 147-159-167-179-195-215-227 stitches, work as follows: Switch to circular needle size 6 MM = US 10 and work as follows: ROW 1 (= right side): 4 edge stitches as before, * knit 3, purl 1 *, work from *-* until 7 stitches remain on needle, knit 3 and 4 edge stitches as before. ROW 2 (= wrong side): Purl with 4 edge stitches in each side as before. Work 1st and 2nd ROW 3-3-3-3-4-4-4 times in total (= 6-6-6-6-8-8-8 rows worked). Bind off somewhat loosely by knitting. Jacket measures 49-51-53-55-56-58-60 cm = 19¼"-20"-21"-21⅝"-22"-22¾"-23⅝" from marker mid front and approx. 54-56-58-60-62-64-66 cm = 21¼"-22"-22¾"-23⅝"-24⅜"-25¼"-26" from the top of shoulder. SLEEVE: Slip 31-33-37-39-39-39-39 sleeve stitches from one thread on to needle size 8 MM = US 11 and pick in addition up 1 stitch in each of the 6-6-8-8-10-12-14 stitches cast on under sleeve - read SLEEVE TIP = 37-39-45-47-49-51-53 stitches. Insert 1 marker thread in the middle of the 6-6-8-8-10-12-14 new stitches under sleeve - round begins at the marker thread. Work stockinette stitch in the round on needle - AT THE SAME TIME when 1 round has been worked after division, decrease mid under sleeve – read DECREASE TIP and decrease as follows: Decrease 2 every 3 cm = 1⅛" 1-1-3-3-3-3-3 times = 35-37-39-41-43-45-47 stitches on needle. Work until sleeve measures 40-38-38-35-35-36-34 cm = 15¾"-15"-15"-13¾"-13¾"-14¼"-13⅜" from division. On next round begin rib while AT THE SAME TIME increasing 5-7-9-7-9-7-9 stitches evenly on 1st round - remember INCREASE TIP = 40-44-48-48-52-52-56 stitches. Switch to circular needle size 6 MM = US 10 and work as follows: ROUND 1: * Purl 1, knit 3 *, repeat from *-* the entire round. ROUND 2: Knit all stitches. Work 1st and 2nd ROUND 3-3-3-3-4-4-4 times in total (= 6-6-6-6-8-8-8 rounds worked). Then work 2 rounds in stockinette stitch (= rolling edge). Bind off somewhat loosely by knitting. Sleeve measures approx. 45-43-43-40-41-42-40 cm = 17¾"-17"-17"-15¾"-16⅛"-16½"-15¾" from division. ASSEMBLY: Sew bands from each front piece together - seam = mid back. Then sew band to cast-on edge round the neck. BELT: Cast on 8 stitches on needle size 8 MM = US 11 with 1 strand DROPS Andes/Snow. Work as follows: ROW 1 (= right side): * Slip 1 stitch purlwise with strand in front of piece, knit 1 *, work from *-* the entire row, turn. ROW 2 (= wrong side): * Slip 1 stitch purlwise with strand in front of piece, knit 1 *, work from *-* the entire row, turn. Repeat 1st and 2nd ROW until belt measures approx. 150-160-170-185-200-215-230 cm = 59"-63"-69"-72¾"-78¾"-84⅝"-90½" - pull the piece along the way to make sure the stitches look nice. When correct length is reached, knit all stitches twisted together 2 by 2 = 5 stitches remain. Bind off by purling. Tie the belt around the waist. |
|
![]() |
|
Have you finished this pattern?Tag your pictures with #dropspattern #kyotocardigan or submit them to the #dropsfan gallery. Do you need help with this pattern?You'll find 20 tutorial videos, a Comments/Questions area and more by visiting the pattern on garnstudio.com. © 1982-2026 DROPS Design A/S. We reserve all rights. This document, including all its sub-sections, has copyrights. Read more about what you can do with our patterns at the bottom of each pattern on our site. |
|
Post a comment to pattern DROPS 272-10
We would love to hear what you have to say about this pattern!
If you want to leave a question, please make sure you select the correct category in the form below, to speed up the answering process. Required fields are marked *.