DROPS Children 49 · Lots of new kid designs!

Knitting tips & tricks

Learn lots of useful tips and tricks to aid on your knitting, such as how to knit buttonholes, pick up new stitches, knit stripes, work short rows, recover a dropped stitch and so much more.

Videos: 109
14:14
How to work a double knitted band with buttonholes

In this DROPS video we show how to work double band with buttonholes. Pick up stitches along right front piece, with a long yarn end to pick up stitches with. Begin pick up at the bottom of front piece and pick up 1 stitch in every knitted row along the entire front piece or skip every 4-5 stitch, inside 1 edge stitch. Look at your pattern what it says. Now continue piece at the end of row where ball is (bottom of front piece). Cast on new stitches for band as an extension of the stitches pick up at the bottom of front piece (cast on stitches from wrong side. We cast on 16 stitches, but it can be different from pattern to pattern). Work band over the 16 stitches at the same time as band is knitted together with stitches picked up along the front piece as follows: ROW 1 (= right side): Slip first stitch on to right needle purlwise with strand in front of piece, * knit 1, slip 1 stitch on to right needle purlwise with strand in front of piece *, work from *-* until 1 stitch remains of the 16 band stitches, slip last stitch on to right needle knitwise, with strand behind piece, knit next stitch, pass slipped stitch over stitch worked, turn. ROW 2 (= wrong side): * Slip first/next stitch on to right needle purlwise with strand in front of piece, knit 1 *, work from *-* over all the 16 band stitches, turn. Repeat rows 1 and 2. Read in the pattern you are working from when buttonholes should be knitted. Work buttonhole, begin from right side, as follows: Work the first 8 stitches as before, turn and work over the 8 stitches as before, work 3 rows in total over the 8 stitches (work last row from right side). Cut the yarn. Work 4 rows in total as before over the remaining 8 band stitches (work first row from right side) and work last stitch from right side together with next stitch along edge of jacket as before. On last row from wrong side work as before over all band stitches and continue as before over all band stitches. We use the yarn DROPS Snow in the video. You must read a pattern to be able to follow this video properly. You’ll find a pattern using this technique by clicking on the pictures below.

9:57
How to work a double knitted V-neck with knit 2 / purl 2

In this DROPS video we show how we work a double knitted V-neck. The neck should be worked in the round, but we only show parts of what happens on the front piece. We are showing: 1) Time: 00.04-01.36. How to put the 2 mid-stiches on a needle and knit, and at the same time knit up stitches from the right side on the neckline. Insert 1 marker between the 2 mid-stitches; these stitches are always knitted. Knit up 2 more stitches on the left side, but the number of stitches must be divisible by 4. 2) Time: 01:37 -03:12. Count back to the beginning of the round so the mid-stitches are knitted when working rib. Work rib (knit 2, purl 2), until there are 2 stitches left before the marker, knit 2 together (even it one stitch should have been a purl stitch), then slip 1 stitch as if to knit, knit 1 and pass the slipped stitch over the knitted stitch = 2 knitted stitches mid-front, purl 1 stitch and continue the rib to the end of the round. 3) Time: 03:13 -04:10. Decrease like this on the next round. Above the 6 middle stitches, there will then only be knitted stitches. 4) Time: 04:12 -04:29. Work in the round and decrease on every round until the finish measurement. 5) Time: 04:30-05:52. Work 1 round without decreasing = folding edge. 6) Time: 05:54-08:21. Now increase on each side of the mid-stitches every round as follows: Work rib until there is 1 stitch left before the marker, make 1 yarn over, knit 2 (mid-stitches), 1 yarn over and work rib to the end of the round; yarn overs are worked twisted on the next round. 7) Time: 08:25-09:06. Continue to increase until the finish measurement. Cast off with knit over knit and purl over purl. 8) Time: 09:10-09:38. Fold the neck double to the inside and sew a couple of stitches to keep it in place. 9) Time: 09:39-09:56. Finish the double knitted V-neck. We use the yarn DROPS Snow in the video. You must read a pattern with this V-neck to be able to follow this video properly. You’ll find a pattern by clicking on the picture below.