Anne Villaume wrote:
N'y a t'il pas une erreur au niveau des diagrammes des torsades ( torsades 4 mailles centrales ?
13.11.2017 - 22:29DROPS Design answered:
Bonjour Mme Villaume, le diagramme A.3 semble correct, que pensez-vous avoir vu comme erreur, pouvez-vous nous en dire plus? Merci d'avance.
14.11.2017 - 09:14
Annely#annelyset |
|||||||||||||||||||||||||
![]() |
![]() |
||||||||||||||||||||||||
The set consists of: Knitted head band and wrist warmers with cables. The piece is worked in DROPS Flora.
DROPS 182-12 |
|||||||||||||||||||||||||
INFORMATION FOR THE PATTERN: RIDGE/GARTER STITCH (worked back and forth): 1 ridge = Knit 2 rows. PATTERN: Head band: See diagrams A.1 and A.2. Wrist warmers: See diagrams A.2 to A.4. The diagrams show all the rows in the pattern seen from the right side. DECREASE TIP (for head band): To work out how to decrease evenly, count the total number of stitches on the needle (e.g. 54 stitches), minus the edge stitches (e.g. 6 stitches) and divide by the number of decreases to be made (e.g. 12) = 4. In this example, you knit every 3rd and 4th stitch together, but do not decrease over the edge stitches. INCREASE TIP-1 (for the thumb gusset on the wrist warmers): Make 1 yarn over, knit 1, make 1 yarn over (= 2 stitches increased). On the next round knit the yarn overs twisted to prevent holes. Continue to increase on each side of the increased stitches so that you get a gusset. INCREASE TIP-2 (for wrist warmers): To work out how to increase evenly, count the total number of stitches on the needle (e.g. 50 stitches), minus the stitches you are not going to increase over (e.g. 22 stitches) and divide the remaining stitches with the number of increases to be made (e.g. 14) = 2. In this example, you increase after every 2nd stitch by making 1 yarn over, on the next round work the yarn overs twisted to prevent holes. ---------------------------------------------------------- HEAD BAND: The piece is worked back and forth on the needle. Cast on 42 stitches with needle size 2.5 mm and Flora. Work 2 RIDGES – see description above. The next row is worked as follows from the right side: Knit 3 edge stitches, * Knit 3, 1 yarn over *, repeat from *-* until there are 3 stitches left on the needle and finish with knit 3 edge stitches = 54 stitches. Purl 1 row from the wrong side with knit 3 edge stitches in each side (the yarn overs are purled twisted to prevent holes). Continue by working A.1 (= 54 stitches) until the piece measures approx. 48-54 cm – finish with the 6th row in A.1 so that the pattern starts and finishes in the same way. Knit 1 row from the right side and decrease AT THE SAME TIME 12 stitches evenly on row – read DECREASE TIP = 42 stitches. Knit 5 rows and then loosely cast off with knit from the right side. BAND: The piece is worked back and forth on the needle. Cast on 14 stitches with needle size 2.5 mm. Work 1 ridge. The next row is worked as follows from the right side: 1 edge stitch in garter stitch, work A.2 over the next 12 stitches (= 3 repeats of 4 stitches), finish with 1 edge stitch in garter stitch. Continue the pattern in this way until the piece measures 10 cm. Work 1 ridge and then loosely cast off with knit from the right side. Cut the strand, form the band into a ring and sew the cast-off edge to the cast-on edge with 1 stitch in each stitch. Pull the head band through the ring. Sew the head band together mid front – sew the cast-off edge to the cast-on edge with 1 stitch in each stitch. Place the band mid front so that it hides the seam. ---------------------------------------------------------- LEFT WRIST WARMER: The piece is worked in the round with double pointed needles. Cast on 64-72 stitches with double pointed needles size 2.5 mm and Flora. Knit 1 round. Then work A.2 in the round (= 16-18 repeats of 4 stitches). When the piece measures 5-6 cm knit the stitches in each cable together 2 and 2 the complete round (the other stitches are purled) = 48-54 stitches. Continue working with knit over knit and purl over purl until the piece measures 10-11 cm. REMEMBER THE KNITTING TENSION! The next round is worked as follows: S/M: Knit 2, purl 9, knit 1 in the front and back of each of the next 2 stitches (= 2 stitches increased), purl 9 and knit 26 = 50 stitches. L/XL: Knit 3, purl 9, knit 1 in the front and back of each of the next 2 stitches (= 2 stitches increased), purl 9, knit 31 and decrease at the same time 2 stitches evenly over these 31 stitches = 54 stitches. The next round is worked as follows in both sizes: 2-3 stitches stocking stitch, work A.3 (= 22 stitches) and work 26-29 stitches stocking stitch. Continue the pattern in this way. When the piece measures 14-15 cm start the increases for the thumb gusset. Increase 1 stitch on each side of the next to last stitch on the round (i.e. on the inside of the hand) – read INCREASE TIP-1. Increase in this way on each side of the increased stitches every 3rd round a total of 6-7 times = 13-15 thumb-gusset stitches and a total of 62-68 stitches on the needle. When the piece measures 19-21 cm place the 13-15 thumb-gusset stitches + 1 stitch on each side of these on a thread (= 15-17 stitches on the thread). On the next round, cast on 3 new stitches on the needle over the stitches on the thread = 50-54 stitches. Continue with stocking stitch and A.3 as before until the piece measures 21-22 cm. Knit 1 round and increase at the same time 14 stitches evenly in both sizes – read INCREASE TIP-2 (do not increase over the 22 stitches in A.3) = 64-68 stitches. Continue working A.2 in the round – NOTE: A.4 shows how A.2 fits over A.3, there should be purl 2 / 2 cable stitches the complete round. When you have worked 10 rounds with A.2 the whole wrist warmer measures approx. 24-25 cm. Cast off with knit over knit and purl over purl. THUMB: Place the 15-17 stitches from the thread back on double pointed needles size 2.5 mm and in addition knit up 9-7 stitches on the edge of the back of the thumb-gusset stitches (i.e. knit up 1 stitch in each of the 3 stitches which were cast on + 3-2 stitches on each side of these 3 stitches) = 24-24 stitches. Work 3-5 rounds stocking stitch in the round. Then work 6 rounds of A.2 before casting off with knit over knit and purl over purl. RIGHT WRIST WARMER: Cast on 64-72 stitches with double pointed needles size 2.5 mm. Knit 1 round. Then work A.2 in the round (= 16-18 repeats of 4 stitches). When the piece measures 5-6 cm knit the stitches in each cable together 2 and 2 the complete round (the other stitches are purled) = 48-54 stitches. Continue working with knit over knit and purl over purl until the piece measures 10-11 cm. The next round is worked as follows: S/M: Knit 26, purl 9, knit 1 in the front and back of each of the next 2 stitches (= 2 stitches increased), purl 9 and knit 2 = 50 stitches. L/XL: Knit 31 and decrease at the same time 2 stitches evenly over these 31 stitches, purl 9, knit 1 in the front and back of each of the next 2 stitches (= 2 stitches increased), purl 9 and knit 3 = 54 stitches. The next round is worked as follows in both sizes: 26-29 stitches stocking stitch, work A.3 (= 22 stitches) and finish with 2-3 stitches stocking stitch. Continue the pattern in this way. When the piece measures 14-15 cm start the increases for the thumb gusset. Increase 1 stitch on each side of the second stitch on the round (i.e. on the inside of the hand) – read INCREASE TIP-1. Increase in this way on each side of the increased stitches every 3rd round a total of 6-7 times = 13-15 thumb-gusset stitches and a total of 62-68 stitches on the needle. When the piece measures 19-21 cm place the 13-15 thumb-gusset stitches + 1 stitch on each side of these on a thread (= 15-17 stitches on the thread). On the next round cast on 3 new stitches on the needle over the stitches on the thread = 50-54 stitches. Continue with stocking stitch and A.3 as before until the piece measures 21-22 cm. Knit 1 round and at the same time increase 14 stitches evenly in both sizes – read INCREASE TIP-2 (do not increase over the 22 stitches in A.3) = 64-68 stitches. Continue to work A.2 in the round – NOTE: A.4 shows how A.2 fits over A.3, there should be purl 2 / 2 cable stitches the complete round. When you have worked 10 rounds of A.2 the whole wrist warmer measures approx. 24-25 cm. Cast off with knit over knit and purl over purl. Work thumb in the same way as for the left wrist warmer. |
|||||||||||||||||||||||||
Diagram explanations |
|||||||||||||||||||||||||
|
|||||||||||||||||||||||||
![]() |
|||||||||||||||||||||||||
Have you finished this pattern?Tag your pictures with #dropspattern #annelyset or submit them to the #dropsfan gallery. Do you need help with this pattern?You'll find 26 tutorial videos, a Comments/Questions area and more by visiting the pattern on garnstudio.com. © 1982-2025 DROPS Design A/S. We reserve all rights. This document, including all its sub-sections, has copyrights. Read more about what you can do with our patterns at the bottom of each pattern on our site. |
Post a comment to pattern DROPS 182-12
We would love to hear what you have to say about this pattern!
If you want to leave a question, please make sure you select the correct category in the form below, to speed up the answering process. Required fields are marked *.