Nyte wrote:
I have the same issue as Diane below, if I knit section 5, with 2 repeats of the diagram, I have 141 stitches and 24 ridges. But the Drops answer is that there should be 48 ridges and 165 stitches. The instructions make it seem like you need to knit the diagrams 2 times vertically but you do have to knit them 4 times vertically in total to get the length and correct number of stitches :)
15.04.2025 - 19:21DROPS Design answered:
Dear Nyte, when working diagrams section 5 you work at total of 24 ridges (48 rows) and increase 1 stitch at the end of each row, so that you will increase a total of 48 sts when working 2 repeats in height of the diagrams, 117+48=165 sts. Happy knitting!
23.04.2025 - 10:00
Patrizia Fontana wrote:
Non capisco come si lavora l'occhiello prima della maglia successiva di cui al ferro 2..cioe' cosa si intende per occhiello..grazie
01.03.2025 - 02:07DROPS Design answered:
Buongiorno Patrizia, è un aumento nascosto, deve sollevare il filo prima della maglia successiva e lavorarlo come indicato. Buon lavoro!
03.03.2025 - 09:00
Ann-Iren Olden wrote:
Hei, på bildet ser det ut som om det er flere farger. I oppskriften er det bare rosa og grå stemmer det??
17.12.2024 - 14:34DROPS Design answered:
Hej Ann-Iren, til luen er det 2 farver og til sjalet er det 4 farver :)
17.12.2024 - 15:01
Sylvie wrote:
Bonjour, Je suis entrain de réaliser le châle et voici ma question : La vidéo ne démarre pas au tout début de la mosaïque et je pense que les 2 premiers rangs je dois les tricoter comme du jacquard pour lancer et former le début du motif et je pourrais seulement qu'à partir du 3ème rang commencer comme sur la vidéo faire glisser les mailles ? Merci pour votre réponse. Sylvie
30.09.2024 - 23:19DROPS Design answered:
Bonjour Sylvie, le point mosaïque ne se tricote pas exactement comme du jacquard, vous allez glisser certaines mailles et tricoter les autres dans la couleur indiquée au début du rang pendant 2 rangs (le 1er sur l'endroit et le 2ème sur l'envers), et au rang suivant sur l'endroit, vous tricotez les mailles indiquées avec l'autre couleur et glissez les autres - dans cette vidéo, nous montrons comment tricoter ce type de motifs. En même temps, vous devrez diminuer/augmenter comme avant en début/fin de rang. Bon tricot!
01.10.2024 - 09:37
Pauline wrote:
Hello ...I am on section 3 of the purple way shawl and I need you to help me understand how to make the increases and decreases without messing up the mosaic pattern ....can you simplify the instructions please....I don't understand the pattern
02.09.2024 - 01:31DROPS Design answered:
Dear Pauline, you have to increase and decrease just as you did before, at the same time work diagrams, on 1st row: decrease at the beg of row from RS (first stitch A.3) and increase at the end of the same row = A.3. From WS work the first st as shown in A.3 and the 2nd stitch (the one you increased) in A.6. Happy knitting!
02.09.2024 - 09:32
CAMILLA wrote:
HVORDAN TAGER MAN IND I OPSKRIFTEN PÅ SJAL. I SKRIVER KUN HVOR MAN TAGER UD OG IKKE HVORNÅR MAN SKAL BEGYNDE AT TAGE IND IGEN.
04.10.2022 - 11:40DROPS Design answered:
Hei Camilla. Du øker og feller i hvert parti, men det det økes hele tiden flere masker enn det felles. Du feller alle maskene til slutt samtidig når du feller av. mvh DROPS Design
09.10.2022 - 13:34
Diane wrote:
Bonjour, à la section 5, si je tricote 2 fois A3 à A6 en hauteur, je me retrouve avec 141 mailles et non 165 ? Ou je dois tricoter 2 autres fois A3 à A6 pour avoir 165 mailles ? Le châle sera alors plus long que 135 cm !!! Merci beaucoup.
17.08.2022 - 02:53DROPS Design answered:
Bonjour Diane, vous allez tricoter un total de 48 côtes mousse et augmenter 1 maille par côte mousse (= 1 m tous les 2 rangs), autrement dit vous allez passer de 117 mailles + 48 mailles = 165 mailles. Bon tricot!
17.08.2022 - 08:22
Anette wrote:
Hvad har jeg gjort forkert, når jeg mangler 25 masker, når jeg har strikket parti 5 ???
19.12.2021 - 20:34DROPS Design answered:
Hej Anette, det er svært at gætte sig til... har du alle udtagner med ifølge A.6 ?
21.12.2021 - 08:13
Heike wrote:
Wow ! Tolles Tuch - lassen sich die Bereiche auch erweitern , sodass das Tuch grösser wird ?
31.10.2021 - 11:14DROPS Design answered:
Liebe Heike, wahrscheinlich kann man das Tuch vergrössern aber leider können wir nicht jede Anleitung nach jeder Anfrage anpassen, gerne hilft Ihnen Ihr DROPS Laden damit weiter - auch telefonisch oder per E-Mail. Viel Spaß beim stricken!
03.11.2021 - 07:25
Ewa Dulat wrote:
Errata: chodzi oczywiście nie o schemat A1 lecz A2 11 S/M
10.12.2020 - 21:03
Purple Way#purplewayshawl |
|||||||
![]() |
![]() |
||||||
Knitted hat in DROPS Alpaca with mosaic pattern and garter stitch. Knitted shawl in DROPS Alpaca with mosaic pattern, garter stitch and stripes.
DROPS 197-29 |
|||||||
EXPLANATION FOR THE PATTERN: ---------------------------------------------------------- GARTER STITCH (back and forth): 1 ridge = knit 2 rows. PATTERN: Hat: See diagrams A.1 and A.2. Choose diagram for your size. Shawl: See diagrams A.3 to A.6. MOSAIC PATTERN: See diagram A.1 and A.2 for hat and A.3 to A.6 for shawl and read explanation for technique below. On all rows from right side hold yarn behind piece (i.e. on wrong side of piece) when slipping a stitch. On all rows from wrong side hold yarn in front of piece (i.e. towards you and still on wrong side of piece) when slipping a stitch. Make sure that the yarn is not too tight on wrong side of piece! To maintain control over pattern insert a marker between every pattern repetition. Work pattern in garter stitch. A.1/A.3 show which colour to use on row. On every pattern row that begins and ends with a black square in A.1/A.3 (colour B), knit all stitches with colour B and slip all stitches with colour A. On every pattern row that begins and ends with a empty square in A.1/A.3 (colour A), knit all stitches with colour A and slip all stitches with colour B. DECREASE TIP (applies to hat): All decreases are done from the right side! To calculate how to decrease evenly, use the total number of stitches on row (e.g. 122 stitches), minus edge stitches (2 stitches) and divide the remaining stitches by number of decreases to be done (e.g. 12) = 10. In this example knit approx. every 9th and 10th stitch together. ---------------------------------------------------------- START THE PIECE HERE: ---------------------------------------------------------- HAT - SHORT OVERVIEW OF THE PIECE: Work piece back and forth on circular needle. HAT: Cast on 112-122 stitches (including 1 edge stitch in each side of piece) on circular needle size 3 mm with old pink. Work 4 ridges in GARTER STITCH - read explanation above. Switch to circular needle size 3.5 mm and work pattern - read MOSAIC PATTERN, as follows: Work A.1 (= 1 stitch), work A.2 (= 11-12 stitches) over the next 110-120 stitches (= 10-10 times in width) and A.1 over last stitch. REMEMBER THE KNITTING TENSION! Continue pattern until piece measures 17-18 cm. Then work piece in garter stitch with old pink. Then decrease as follows: Decrease 11-12 stitches evenly every 4th row - read DECREASE TIP, 9 times in total = 13-14 stitches. Cut the yarn and pull it through the remaining stitches, tighten together and fasten. Hat measures approx. 25-26 cm. Sew hat together inside 1 edge stitch with old pink. ---------------------------------------------------------- SHAWL - SHORT OVERVIEW OF THE PIECE: Piece is worked back and forth on circular needle, diagonally from corner to corner in sections with garter stitch, stripes and mosaic pattern. SHAWL: Cast on 3 stitches on circular needle size 3.5 mm with light camel. Work 1 ridge in GARTER STITCH - read explanation above. SECTION-1 (garter stitch in light camel): ROW 1 (= right side): Slip 1 stitch purlwise, knit until 1 stitch remains on needle, work 2 stitches in last stitch (= 1 stitch increased). ROW 2 (= wrong side): Knit 2, knit loop before next stitch on left needle twisted (= 1 stitch increased), knit until 2 stitches remain on needle, knit 2 stitches twisted together (= 1 stitch increased and 1 stitch decreased). Repeat 1st and 2nd row until there are 63 stitches on needle (= 61 ridges in total). REMEMBER THE KNITTING TENSION! Piece measures approx. 56 cm measured along first stitch from right side. SECTION-2 (stripes): Continue to increase and decrease as before but now work stripes as follows: Cut the yarn where there is more than 2 ridges before same colour is used again. Work * 1 ridge in dark pink, 2 ridges with light camel *, work from *-* 3 times in total (= 9 ridges) = 72 stitches on needle. Then work stripes as follows: * Work 1 ridge with dark pink, 2 ridges with light camel, 1 ridge with dark pink, 1 ridge with old pink, 2 ridges with light camel, 1 ridges with old pink, 2 ridges with light camel *, work from *-* 2 times in total (= 20 ridges) = 92 stitches on needle. Piece measures approx. 88 cm measured along first stitch from right side. SECTION-3 (mosaic pattern with dark pink and light camel): Continue to increase and decrease as before but now work pattern as follows: Work 1 ridge with dark pink = 93 stitches. Then work MOSAIC PATTERN - read explanation above, with dark pink and light camel as follows: Work A.3 (= 1 stitch), A.4 (= 18 stitches), work A.5 (= 12 stitches) over the next 72 stitches (= 6 times in width), A.6 (= 1 stitch) and A.3 over last stitch (this is the stitch to work 2 stitches in from right side. From wrong side work first stitch as A.3 and work 2nd stitch in pattern A.6). Loop to be picked up between 2 stitches on every row from wrong side are worked in A.6. When A.3 to A.6 have been worked 1 time vertically (= 12 ridges), there are 105 stitches on row. Piece measures approx. 100 cm measured along first stitch from right side. SECTION-4 (stripes): Continue to increase and decrease as before but now work stripes as follows: Work 1 ridge with dark pink, 2 ridges with light camel, 1 ridge with dark pink, 1 ridge with old pink, 2 ridges with light camel, 1 ridges with old pink, 2 ridges with light camel, 1 ridge with old pink (= 11 ridges) = 116 stitches on needle. Piece measures approx. 110 cm measured along first stitch from right side. SECTION-5 (mosaic pattern with old pink and off white): Continue to increase and decrease as before but now work pattern as follows: Work 1 ridge with old pink = 117 stitches. Then work mosaic pattern with old pink and off white as follows: Work A.3 over first stitch, A.4 over the next 18 stitches, work A.5 over the next 96 stitches (= 8 times in width), A.6 over 1 stitch and A.1 over last stitch (it is this stitch 2 stitches are worked in from right side. From wrong side work first stitch as A.3 and work 2nd stitch in pattern A.6). Loop to be picked up between 2 stitches on every row from wrong side are worked in A.6. When A.3 to A.6 has been worked 1 time vertically, repeat pattern vertically, every time the pattern is repeated work 1 repetition more of A.5 in width. When A.3 to A.6 have been worked 2 times vertically (= 48 ridges), there are 165 stitches on row. Piece measures approx. 135 cm measured along first stitch from right side (approx. 3 cm remain). If you want a larger shawl repeat A.3 and A.6 vertically until desired measurements. SECTION-6 (stripes): Continue to increase and decrease as before but now work stripes as follows: Work 2 ridges with light camel, 1 ridge with dark pink, 1 ridge with old pink and then cast off with old pink. Make sure to avoid a tight cast-off edge, cast off with 1 needle size larger if needed. |
|||||||
Diagram explanations |
|||||||
|
|||||||
![]() |
|||||||
Have you finished this pattern?Tag your pictures with #dropspattern #purplewayshawl or submit them to the #dropsfan gallery. Do you need help with this pattern?You'll find 14 tutorial videos, a Comments/Questions area and more by visiting the pattern on garnstudio.com. © 1982-2025 DROPS Design A/S. We reserve all rights. This document, including all its sub-sections, has copyrights. Read more about what you can do with our patterns at the bottom of each pattern on our site. |
Post a comment to pattern DROPS 197-29
We would love to hear what you have to say about this pattern!
If you want to leave a question, please make sure you select the correct category in the form below, to speed up the answering process. Required fields are marked *.