Izabela wrote:
Jeden z moich faworytów. Idealny. Taki bym chciała :)
15.12.2017 - 13:12
Wilmo wrote:
I will knit this one! How will I know when the pattern is published?
14.12.2017 - 19:19
Cathy wrote:
I love this sweater, the colors are beautiful. I want to knit this one!
13.12.2017 - 22:17
Beata Rucinska wrote:
I love this colorful sweater! Definitely on my "to do" list when realeased
13.12.2017 - 20:28
Lone G wrote:
Cheerful and nice :-). I will make this for my daughter, when released.
11.12.2017 - 15:36
Nadia wrote:
Ooh, I love this one! Can't wait for the pattern to be released 😊😊🍀
11.12.2017 - 15:11
Magic Mountain#magicmountainsweater |
||||||||||||||||||||||||||||||||||
![]() |
![]() |
|||||||||||||||||||||||||||||||||
Knitted jumper with round yoke and multi-coloured Norwegian pattern, worked top down. Sizes S - XXXL. The piece is worked in DROPS Paris.
DROPS 187-8 |
||||||||||||||||||||||||||||||||||
INFORMATION FOR THE PATTERN: RIDGE/GARTER STITCH (worked in the round): 1 ridge = 2 rounds. Knit 1 round and purl 1 round. RIDGE/GARTER STITCH (worked back and forth): 1 ridge = Knit 2 rows DECREASE/INCREASE TIP (evenly spaced): To work out how to decrease/increase evenly, count the total number of stitches on the needle (e.g. 90 stitches) and divide by the number of decreases/increases to be made (e.g. 6) = 15. In this example, decrease by knitting together every 14th and 15th stitch. When increasing make 1 yarn over after every 15th stitch. On the next round/row work the yarn overs twisted to avoid holes. PATTERN: See diagrams A.1 and A.2. Choose diagram for your size. The whole pattern is worked in stocking stitch. KNITTING TIP: To avoid the knitting tension becoming tighter when working pattern, it is important that the strands at the back of the piece are not tight. You can use a size larger needle when working pattern if this is a problem. DECREASE TIP (for mid under sleeve): Start 2 stitches before the marker thread, knit 2 together, slip 1 stitch as if to knit, knit 1, pass the slipped stitch over the knitted stitch (= 2 stitches decreased). ---------------------------------------------------------- JUMPER: The yoke and body are worked in the round with circular needle, top down to where the rib begins, then the front and back pieces are worked separately back and forth. The sleeves are worked in the round with short circular needle/double pointed needles, top down. NECKLINE: Cast on 90-96-96-102-102-108 stitches with short circular needle size 4.5 mm and raspberry. Knit 1 round. Change to dark beige and work the next round as follows: * Knit 3, 3 stitches in GARTER STITCH – see description above *, work from *-* to end of round. Continue the rib like this until the neck measures 4 cm. Knit 1 round where you decrease 6-10-6-8-4-6 stitches evenly on round – read DECREASE/INCREASE TIP = 84-86-90-94-98-102 stitches. Change to circular needle size 5.5 mm. Knit 1 round where you increase 31-29-30-31-32-33 stitches evenly on round = 115-115-120-125-130-135 stitches. Then work the yoke as described below. YOKE: Work A.1 in the round (= 23-23-24-25-26-27 repeats of 5 stitches). Continue the pattern as shown in the diagram. Read KNITTING TIP and REMEMBER THE KNITTING TENSION! AT THE SAME TIME on each round marked with an arrow in the diagram increase as described below: Arrow-1: Increase 15-19-20-22-23-25 stitches evenly on round = 130-134-140-147-153-160 stitches. Arrow-2: Increase 14-18-20-21-23-24 stitches evenly on round = 144-152-160-168-176-184 stitches (you now have room for 18-19-20-21-22-23 repeats of 8 stitches). Arrow-3: Increase 30-34-38-42-40-44 stitches evenly on round = 174-186-198-210-216-228 stitches. Arrow-4: Increase 26-29-32-35-34-32 stitches evenly on round = 200-215-230-245-250-260 stitches (you now have room for 40-43-46-49-50-52 repeats of 5 stitches). Arrow-5: Increase 24-25-26-27-30-28 stitches evenly on round = 224-240-256-272-280-288 stitches (you now have room for 28-30-32-34-35-36 repeats of 8 stitches). Arrow-6: Increase 18-20-12-20-24-24 stitches evenly on round = 242-260-268-292-304-312 stitches. The increases are finished in sizes S and M. L + XL + XXL + XXXL: Arrow-7: Increase 12-18-21-18 stitches evenly on round = 280-310-325-330 stitches. Increases are finished in sizes L and XL. XXL + XXXL: Arrow-8: Increase 19-18 stitches evenly on round = 344-348 stitches. Increases are finished in sizes XXL and XXXL. ALL SIZES: = 242-260-280-310-344-348 stitches. Finish working A.1. The piece measures approx. 24-24-28-28-32-32 cm from the cast-on edge. The next round is worked as follows (with moss green in sizes S and M, apricot in sizes L and XL and with off white in sizes XXL and XXXL): Place the first 42-46-52-55-60-60 stitches on 1 thread for sleeve, cast on 6-6-8-8-8-12 new stitches on the needle (= in side under sleeve), knit 79-84-88-100-112-114 stitches (= front piece), place the next 42-46-52-55-60-60 stitches on 1 thread for sleeve, cast on 6-6-8-8-8-12 new stitches on needle (= in side under sleeve) and knit the remaining 79-84-88-100-112-114 stitches (= back piece). Cut the strands. Body and sleeves are finished separately. THE PIECE IS NOW MEASURED FROM HERE! BODY: = 170-180-192-216-240-252 stitches. Insert 1 marker thread in the one side of the piece, in the middle of the 6-6-8-8-8-12 stitches cast on under sleeve. Start the round here and work A.2 in the round (= 17-18-16-18-20-21 repeats of 10-10-12-12-12-12 stitches). On the round marked with arrow-7 in A.2 decrease 2 stitches evenly on round (applies only to size S) = 168-180-192-216-240-252 stitches. When A.2 has been completed, the piece measures approx. 33-33-29-29-25-25 cm from the division. Continue with stocking stitch and dark beige. When the piece measures 34-36-34-36-34-36 cm from the division (or to desired length, there is 4 cm left to finished length) divide the piece for a split in each side. Keep the first 84-90-96-108-120-126 stitches on the needle and place the remaining 84-90-96-108-120-126 on 1 thread or extra needle. Knit 1 row from the right side - AT THE SAME TIME increase 15-21-21-21-21-27 stitches evenly on this row (do not increase over the outermost 3 stitches in each side) = 99-111-117-129-141-153 stitches. Change to circular needle size 4.5 mm and work rib as follows from the wrong side: 3 edge stitches in GARTER STITCH – see description above, * purl 3, knit 3 *, work from *-* until there are 6 stitches left on the row, purl 3 and finish with 3 edge stitches in garter stitch. Continue the rib like this for 4 cm. Cast off with garter stitch over garter stitch, knit over knit and purl over purl, but to avoid the cast-off edge being tight, make 1 yarn over after every 6th stitch at the same time as you cast off (yarn overs cast off as normal stitches). Work in the same way over the stitches on the thread/extra needle. The jumper measures approx. 64-66-68-70-72-74 cm from the shoulder down. SLEEVE: Place the 42-46-52-55-60-60 stitches from the thread on the one side of the piece on short circular needle size 5.5 mm and, in addition, knit up 1 stitch in each of the 6-6-8-8-8-12 stitches cast on under the sleeve = 48-52-60-63-68-72 stitches. Work the first round in A.2 and decrease at the same time 1-1-1-0-1-1 stitch on this round = 47-51-59-63-67-71 stitches. Insert 1 marker thread at the beginning of the round (= mid under sleeve) and 1 marker thread in the middle of the round (= mid top of sleeve). Work A.2 in the round, but start the round as described below: In sizes M, L and XXXL work A.2 from and including stitch 2 in the diagram. In size S work A.2 from and including stitch 3 in the diagram. In size XXL work A.2 from and including stitch 4 in the diagram. In size XL work A.2 from and including stitch 6 in the diagram. When starting on these different stitches, all sizes will then match the marker thread on top of sleeve with the stitch marked with a black star in the diagram, but because of different numbers of stitches in A.2 in sizes S and M the start of the round will need to be recounted when the number of stitches in the repeat has changed to 12 stitches in these sizes. AT THE SAME TIME when the piece measures 3-3-3-2-2-2 cm from the division, decrease 2 stitches mid under the sleeve – read DECREASE TIP. Decrease like this every 5½-5-3-3-2½-2 cm a total of 7-8-11-12-13-15 times = 33-35-37-39-41-41 stitches. When A.2 has been completed finish working the sleeve with dark beige. When the piece measures 39-39-36-36-33-33 cm from the division, knit 1 round where you increase 9-7-5-9-7-7 stitches evenly on round = 42-42-42-48-48-48 stitches. Change to double pointed needles size 4.5 mm and work rib in the round (= knit 3 / purl 3). When the rib measures 4 cm cast off with knit over knit and purl over purl, but to avoid the cast-off edge being tight, make 1 yarn over after every 6th stitch at the same time as you cast off (yarn overs cast off as normal stitches). The sleeve measures approx. 43-43-40-40-37-37 cm from the division. Work the other sleeve in the same way. |
||||||||||||||||||||||||||||||||||
Diagram explanations |
||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||||||||
Have you finished this pattern?Tag your pictures with #dropspattern #magicmountainsweater or submit them to the #dropsfan gallery. Do you need help with this pattern?You'll find 28 tutorial videos, a Comments/Questions area and more by visiting the pattern on garnstudio.com. © 1982-2025 DROPS Design A/S. We reserve all rights. This document, including all its sub-sections, has copyrights. Read more about what you can do with our patterns at the bottom of each pattern on our site. |
Post a comment to pattern DROPS 187-8
We would love to hear what you have to say about this pattern!
If you want to leave a question, please make sure you select the correct category in the form below, to speed up the answering process. Required fields are marked *.