MARIA LUCIA LOMBARDO wrote:
Buongiorno, come si può creare l'arrotondamento in piano della manica? Ho acquistato il filato wish e volevo realizzare questo maglione. C'è un video tutorial? Grazie per la risposta. Maria Lucia
25.10.2021 - 11:55DROPS Design answered:
Buonasera Maria Lucia, deve procedere come indicato nel modello, non ci sono dei tutorial specifici. Buon lavoro!
04.11.2021 - 23:38
Véronique wrote:
Alvéoles
13.08.2021 - 15:16
Shannon Oxley wrote:
Honeycomb Spun
03.08.2021 - 18:41
Winter Hive#winterhivesweater |
||||||||||||||||||||||
![]() |
![]() |
|||||||||||||||||||||
Knitted jumper in DROPS Wish. The piece is worked with cables, honeycomb pattern and high neck. Sizes S - XXXL.
DROPS 227-27 |
||||||||||||||||||||||
------------------------------------------------------- EXPLANATIONS FOR THE PATTERN: ------------------------------------------------------- RIDGE/GARTER STITCH (worked back and forth): Knit all rows. 1 ridge = knit 2 rows. PATTERN: See diagrams A.1 to A.6. The diagrams show all rows in the pattern from the right side. DECREASE TIP-1 (evenly spaced): To work out how to decrease evenly, count the total number of stitches on needle (e.g. 36 stitches) and divide by number of decreases to be made (e.g. 4) = 9. In this example decrease by knitting each 8th and 9th stitch together. INCREASE TIP (for sleeves): Start 1 stitch before the marker thread, 1 yarn over, knit 2 (marker thread sits between these 2 stitches), 1 yarn over. On the next round knit the yarn overs twisted to avoid holes (2 stitches increased). ------------------------------------------------------- START THE PIECE HERE: ------------------------------------------------------- JUMPER – SHORT OVERVIEW OF THE PIECE: The front and back pieces are worked separately, back and forth and bottom up then sewn together. The sleeves are worked in the round with double pointed needles/short circular needle. The neck is worked to finish. FRONT PIECE: Cast on 74-82-82-90-98-106 stitches with circular needle size 7 mm and DROPS Wish. Purl 1 row from the wrong side. Then work as follows from the right side: 1 edge stitch in GARTER STITCH – read description above, knit 2, * purl 2, knit 2 *, work from *-* over the next 4-8-8-12-16-20 stitches, A.1 (= 14 stitches), A.2 (= 32 stitches), A.3 (= 14 stitches), knit 2, * purl 2, knit 2 *, work from *-* over the next 4-8-8-12-16-20 stitches, 1 edge stitch in garter stitch. Work this rib for 10 cm. Change to circular needle size 8 mm. Then work as follows from the right side: 1 edge stitch in garter stitch, stocking stitch over the next 6-10-10-14-18-22 stitches and decrease 1-2-0-1-2-3 stitches over these stitches, A.4 (= 14 stitches), A.5 (= 32 stitches), A.6 (= 14 stitches), stocking stitch over the next 6-10-10-14-18-22 stitches and decrease 1-2-0-1-2-3 stitches over these stitches, 1 edge stitch in garter stitch = 72-78-82-88-94-100 stitches. Continue this pattern. REMEMBER THE KNITTING TENSION! When the piece measures 35-36-37-38-39-40 cm, cast off 3-4-4-5-7-9 stitches at the beginning of the next 2 rows for the armholes = 66-70-74-78-80-82 stitches. Continue the pattern until the piece measures 48-50-52-54-56-58 cm. Now decrease 14 stitches evenly over A.5. On the next row place the middle 12-12-12-14-14-14 stitches on a thread for the neck and finish each shoulder separately. Then cast off stitches on each row from the neck as follows: 2 stitches 1 time and 1 stitch 2 times = 16-18-20-21-22-23 stitches on the shoulder. Continue working until the piece measures 53-55-57-59-61-63 cm, then decrease 4 stitches evenly over the cable in A.4/A.6 = 12-14-16-17-18-19 stitches. Work until the piece measures 54-56-58-60-62-64 cm, cast off. Work the other shoulder in the same way. BACK PIECE: Cast on 74-82-82-90-98-106 stitches with circular needle size 7 mm and DROPS Wish. Purl 1 row from the wrong side. Then work as follows from the right side: 1 edge stitch in garter stitch, knit 2, * purl 2, knit 2 *, work from *-* over the next 4-8-8-12-16-20 stitches, A.1 (= 14 stitches), A.2 (= 32 stitches), A.3 (= 14 stitches), knit 2, * purl 2, knit 2 *, work from *-* over the next 4-8-8-12-16-20 stitches, 1 edge stitch in garter stitch. Work this rib for 10 cm. Change to circular needle size 8 mm. Then work as follows from the right side: 1 edge stitch in garter stitch, stocking stitch over the next 6-10-10-14-18-22 stitches and decrease 1-2-0-1-2-3 stitches over these stitches, A.4 (= 14 stitches), A.5 (= 32 stitches), A.6 (= 14 stitches), stocking stitch over the next 6-10-10-14-18-22 stitches and decrease 1-2-0-1-2-3 stitches over these stitches, 1 edge stitch in garter stitch = 72-78-82-88-94-100 stitches. Continue this pattern. When the piece measures 35-36-37-38-39-40 cm, cast off 3-4-4-5-7-9 stitches at the beginning of the next 2 rows for the armholes = 66-70-74-78-80-82 stitches. Continue the pattern until the piece measures 52-54-56-58-60-62 cm. Now decrease 14 stitches evenly over A.5. On the next row cast off the middle 18-18-18-20-20-20 stitches for the neck and finish each shoulder separately. Then cast off 1 stitch on the next row from the neck = 16-18-20-21-22-23 stitches on the shoulder. Continue working until the piece measures 53-55-57-59-61-63 cm, then decrease 4 stitches evenly over the cable in A.4/A.6 = 12-14-16-17-18-19 stitches. Work until the piece measures 54-56-58-60-62-64 cm, cast off. Work the other shoulder in the same way. SLEEVE: Cast on 36-40-40-44-44-48 stitches with double pointed needles size 7 mm and DROPS Wish. Knit 1 round then work rib (knit 2, purl 2) for 6 cm. Change to double pointed needles size 8 mm and knit 1 round where you decrease 4-6-4-6-4-6 stitches evenly spaced – read DECREASE TIP = 32-34-36-38-40-42 stitches. Insert a marker thread at the beginning of the round = mid-under sleeve. Work stocking stitch in the round. When the sleeve measures 8 cm, increase 1 stitch on each side of the marker thread– read INCREASE TIP. Increase like this every 9½-9-9-8½-8-8 cm a total of 5 times = 42-44-46-48-50-52 stitches. When the sleeve measures 49-48-47-46-43-42 cm, finish the sleeve cap back and forth (from mid-under sleeve). Continue working until the sleeve measures 51-51-50-50-49-49 cm (sleeve cap 2-3-3-4-6-7 cm). Cast off. Work the other sleeve in the same way. ASSEMBLY: Sew the shoulder seams. Sew the sleeve cap to the armhole. Then sew the rest of the sleeve to the armhole – see sketch. Sew the side seams. NECK: Start from the right side on one shoulder and knit up 56 to 64 stitches around the neck (including the stitches on the thread), with short circular needle size 7 mm and DROPS Wish. The number of stitches should be divisible by 4. Work rib (knit 2, purl 2) for 12 cm. Cast off with knit over knit and purl over purl. |
||||||||||||||||||||||
Diagram explanations |
||||||||||||||||||||||
|
||||||||||||||||||||||
![]() |
||||||||||||||||||||||
![]() |
||||||||||||||||||||||
![]() |
||||||||||||||||||||||
Have you finished this pattern?Tag your pictures with #dropspattern #winterhivesweater or submit them to the #dropsfan gallery. Do you need help with this pattern?You'll find 29 tutorial videos, a Comments/Questions area and more by visiting the pattern on garnstudio.com. © 1982-2025 DROPS Design A/S. We reserve all rights. This document, including all its sub-sections, has copyrights. Read more about what you can do with our patterns at the bottom of each pattern on our site. |
Post a comment to pattern DROPS 227-27
We would love to hear what you have to say about this pattern!
If you want to leave a question, please make sure you select the correct category in the form below, to speed up the answering process. Required fields are marked *.