Heidi wrote:
How many skeins of Drops Symphony & Drops Eskimo do I need to make these boots?
24.12.2012 - 21:17DROPS Design answered:
If you take the small size (35/37) you need 100 gr Eskimo (1 skein = 50 gr) and 100 gr Symphony brown and 100 gr Symphony beige (also 50 gr per skein). In total 2 skeins Eskimo and 4 skeins of Symphony
25.12.2012 - 15:51
Karen wrote:
Hallo, bestaat er een video van hoe je moet haken met 2 draden? Ik heb dit nog nooit gedaan. Alvast bedankt!
12.12.2012 - 09:59DROPS Design answered:
Je haakt niet met de twee draden tegelijk. Je haakt eerst met Symphony en wisselt dan van draad naar Eskimo.
13.12.2012 - 16:52
Nathalie wrote:
Jeg må indrømme at jeg synes denne opskrift er svær at finde hoved og hale i. Der står at man starter med at hækle tøflen - men det man i virkeligheden hækler er skaftet og når det er gjort så mangler jeg stadig en opskrift på selve sålen.. er det bare mig der er helt gal på den? Mvh Nathalie
06.11.2012 - 10:20DROPS Design answered:
Hej Nathalie, når du skifter til Eskimo starter du på selve sålen og hækler de 4-5 cm ifølge opskriften. Sålen syr du da sammen midt under foden til sidst. God fornøjelse!
16.11.2012 - 09:21
Shelly Ramsey wrote:
Hello! =) I have 2 say that these are wonderful! If u would like a non-slip or a rubber sole here`s what 2 do when done with boot, take RUBBERIZE-IT (made for dipping tool handles in) put 1 thin layer on bottom of boot & allow 2 dry completely 4 a non-slip...Now 4 a sole 2 walk outside in u`ll have 2 put about 3 layers on allowing it 2 dry in btwn. works best if u use a spoon or stiff paint brush 2 spread.
28.10.2012 - 10:42Vivi Jara wrote:
Hola, me encantan todos los trabajos, y los felicito x la generosidad de ponerlos a disposicion de todos!!! Querria el patron de estas botitas xfi!!! pero la pag da error. PodrÃan reponerlo xfavor? muchas gracias y felicitaciones!!! vivian de Argentina
18.02.2012 - 01:23
Drops Design France wrote:
Bonjour Assia, pour vous aider, vous avez toute notre vidéothèque à votre disposition, et n'hésitez pas à contacter votre magasin ou le forum DROPS pour toute aide complémentaire. Bon crochet !
02.01.2012 - 11:02Assia wrote:
S'il vous plai commeent travailler cet ouvrage merci
28.12.2011 - 19:16
Marija wrote:
Jätte fina
11.12.2011 - 07:56
Bianca wrote:
Het, Alvast bedankt! Lijkt me idd leuk om in de babycollectie te zien verschijnen. Ik ging zelf aan de slag met fijner garen en naald waardoor ik een kleiner slofje bekom.
03.11.2011 - 08:00
DROPS Design NL wrote:
Hoi Bianca. Ik kan u helaas niet helpen met het aanpassen, maar u kunt het doen met hulp van de stekenverhouding (aantal st/nld per 10 cm) of pas een bestaande babyslof patroon aan. Ik heb verder uw wens vertaald en doorgestuurd naar ons Design Team. Misschien een leuk idee voor een komende babycollectie. Succes.
31.10.2011 - 14:01
Pocahontas#pocahontasslippers |
|
|
|
|
Crochet DROPS slippers in "Snow" and "Symphony" or "Melody".
DROPS 133-9 |
|
|
CROCHET 2 STS TOG: Crochet the first st but wait with last YO and pull through, crochet next st and at last pull trough now pull thread through all 3 loops on hook. -------------------------------------------------------- SLIPPER: Worked back and forth, top down. Work 32-34-36 loose ch on hook size 8 mm with 2 threads Symphony (1 thread brown and 1 thread light beige) or Melody (2 threads beige). Turn piece. Work 1 dc in 2nd ch from hook, then work 1 dc in every ch the entire row = 31-33-35 dc. Continue to work as follows: * 2 ch, turn piece, work 1 tr in every st, 1 ch, turn piece, work 1 dc in every st *, repeat from *-* - REMEMBER THE CROCHET TENSION – important so that the slippers are the correct size. AT THE SAME TIME when piece measures 10-10-10 cm, dec 2 sts on the row as follows: Work the first 2 sts tog - see explanation above - and the 2 middle sts tog = 29-31-33 sts on row. Then continue until piece measures 19-20-21 cm. Now work the foot in dc as follows – insert a marker in the middle st: ROW 1: Work 1 dc in every st until st before mid st, 2 dc in next st, 1 ch (= middle st), skip next st, 2 dc in next st, 1 dc in each of the last sts, turn piece. ROW 2: Work 1 dc in each of the first sts until the ch, work 7 tr in the middle ch (the 4th tr of the 7 tr is now the middle st) and 1 dc in each of the last sts, turn piece. ROW 3: Work 1 dc in each of the next sts until st before mid st, work 2 dc in next st, 1 ch (= mid st), skip next st, work 2 dc in next st, 1 dc in each of the last sts, turn piece. ROW 4: Work 1 dc in each st until mid st, 7 tr in ch and 1 dc in each of the last sts, turn piece. Repeat 3rd and 4th row until piece measures approx. 22-24-27 cm in length - measured when piece is folded double. Switch to Snow and now measure piece from here. * Work 1 row with dc, finish row with 1 ch and turn piece *, repeat from *-* until piece measures approx. 4-4,5-5 cm - at the same time on last row, work the first 2 and the last 2 sts tog - see explanation above. Cut the thread. ASSEMBLY: Fold the slipper double, sew tog edge to edge in front loop of outermost st to avoid a chunky seam. Loosely work a row with dc at the top of leg with Snow. Work a ch-row with Snow of approx. 150 cm, make a small pompom in each end – Tip: Before the last pompom is inserted on the ch-row, pull the ribbon through a st at the bottom of leg in the transition between Symphony / Melody to Snow so it is fastened tightly. Tie this ch-row around the leg. |
|
Have you finished this pattern?Tag your pictures with #dropspattern #pocahontasslippers or submit them to the #dropsfan gallery. Do you need help with this pattern?You'll find 7 tutorial videos, a Comments/Questions area and more by visiting the pattern on garnstudio.com. © 1982-2025 DROPS Design A/S. We reserve all rights. This document, including all its sub-sections, has copyrights. Read more about what you can do with our patterns at the bottom of each pattern on our site. |
Post a comment to pattern DROPS 133-9
We would love to hear what you have to say about this pattern!
If you want to leave a question, please make sure you select the correct category in the form below, to speed up the answering process. Required fields are marked *.