In this DROPS video we show you how to work chart M.1 and M.2 for the pattern in DROPS 109-14. In this video we have 3 edge sts in garter in each side, we work M.1 two times and we have already worked 1 report of the chart in height. Then we show the first 4 rows of the diagram where the pleats comes in the 4th row. To see the pattern with this chart, see: DROPS 109-14
The video above can be used in the following patterns
Comments (4)
Kim wrote:
I need to decrease the length of the sleeves to 20 inches. How do you suggest I get this done? I increased every 2 inch instead of 2 2/3 , will that work? I am almost finished with the jacket. Yeah
29.12.2018 - 02:39DROPS Design answered:
Dear Kim, you can start decreasing earlier - adjust the first decrease to get the desired total length. Happy knitting! 02.01.2019 - 12:30Kim wrote:
Left front piece;when do you bind off 10 sts towards mid front for neck? Where is the mid front on the 29 stitches for the neck?
18.12.2018 - 04:55DROPS Design answered:
Dear Kim, the 10 sts towards the front on a left front piece (worked bottom up) will be the first 10 sts at the beginning of a row from wrong side, ie a row starting from neckline and finishing towards armhole. Happy knitting! 18.12.2018 - 09:21Kim Rogers wrote:
There are all white boxes. Are they purl or knit stitches?
05.10.2018 - 17:40DROPS Design answered:
Dear Mrs Rogers, the white squares are worked K from RS and P from WS and the black dots are worked P from RS and K from WS. See also video. Happy knitting! 08.10.2018 - 10:30Kim wrote:
What is 3 p and 7 p? Is that the 4th and 8th row of purling?
05.10.2018 - 01:56DROPS Design answered:
Dear Kim, 3.p = 3rd row in M.1 and 7.p = 7th row in M.1. Happy knitting! 05.10.2018 - 08:02