How to increase 4 stitches in 1 stitch and yarn over with 2-color in English Rib

Keywords: english rib, stripes,

In this DROPS video we show how to increase 4 stitches in 1 stitch and yarn over with 2-color in English Rib as follows: = Knit the yarn-over and knitted stitch together, but wait to slip the stitch from the needle, * make 1 yarn over right needle and knit the stitch and yarn over together without slipping the stitch off the needle *, work from*-* a total of 2 times = 5 stitches (i.e. 4 stitches increased). We use the yarn DROPS Snow in the video. You must read a pattern, chart explanation and look at the chart to be able to follow this video properly. You’ll find a pattern using this technique by clicking on the picture below.

Comments (1)

Laura wrote:

Door deze video op YouTube te kijken kon ik hem vertraagd afspelen,dan snap je veel sneller de bedoeling

14.07.2019 - 12:41

Leave a comment about this video

Your email address will not be published. Required fields are marked *.