How to increase 4 stitches in 1 stitch and yarn over with 2-colour in English Rib

Tags: english rib, stripes,

In this DROPS video we show how to increase 4 stitches in 1 stitch and yarn over with 2-colour in English Rib as follows:

= Knit the yarn-over and knitted stitch together, but wait to slip the stitch from the needle, * make 1 yarn over right needle and knit the stitch and yarn over together without slipping the stitch off the needle *, work from*-* a total of 2 times = 5 stitches (i.e. 4 stitches increased).

We use the yarn DROPS Snow in the video.

You must read a pattern, chart explanation and look at the chart to be able to follow this video properly. You’ll find a pattern using this technique by clicking on the picture below.

The video above can be used in the following patterns

You can adjust the speed of this video by clicking on the icon, on the play bar.

Our videos do not have sound.

We are a worldwide company and our videos are watched by people around the world, speaking different languages, many of whom do not understand English.

We have therefore written instructions to accompany this video, and there is no sound to disturb while watching. Enjoy!

Comments (1)

Laura 14.07.2019 - 12:41:

Door deze video op YouTube te kijken kon ik hem vertraagd afspelen,dan snap je veel sneller de bedoeling

Leave a comment about this video

Your email address will not be published. Required fields are marked *.