Gail King wrote:
I love this look and want to make it but I don't understand about the yarn and prices. Please help me understand.
27.03.2019 - 01:54DROPS Design answered:
Hi Gail! Depending on your size (S/M – L/XL - XXL - XXXL) you will need respecively 800-900-1000-1050 g of yarn (DROPS Merino Extra Fine), it means 16-18-20-21 skeins. The yarn cost mentionned in the pattern is calculated from the materials needed to make the pattern in its smallest size. Happy knitting!
27.03.2019 - 07:39
Trisha A wrote:
I am currently doing the shawl collar but the pattern doesn't explain about decreasing, it only has a two row explanation of stitches. The picture clearly shows that the shawl collar should go to a point but the explanation states 'until the piece measures 10-10-11-11' It really doesn't make any sense to me - please help.
26.03.2019 - 22:11DROPS Design answered:
Dear Trisha, you will get the same shape as on the chart when working the shawl collar - eg from RS on right shawl collar work 32 tr, turn and on next row from WS work: 11 sc, 5 hdc, 5 dc, 11 tr, turn. Repeat these 2 rows, the collar will be higher on the tr-side and shorter on the sc side. You should then measure along the sc-side = the most narrow part on collar. Happy crocheting!
27.03.2019 - 08:07
Pam wrote:
Can you please give written pattern for each A1a A1b and A1c. Thank you
03.02.2019 - 18:32DROPS Design answered:
Dear Pam, in UK-English work A.1B: 4 ch (= 1st dtr), 1 ch, slip 5 dc, 3 dtr, 2 ch, 2 dtr in next ch. A.1A: skip 4 dc, 2 dtr, 2 ch, 2 dtr in next dc, A.1c = skip 4 dc, 1 dtr, 2 ch, 1 dtr in next dc, 1 ch, skip 4 dc, 1 dtr in last dc. Happy crocheting!
04.02.2019 - 13:06
Trisha A wrote:
Help. I can follow the pattern OK but the numbers just don't add up, I have even done an excel spreadsheet and still its not working. I have chained 120, having done all the 96 dc you then turn and follow the diagram, easy as the pattern reads ROW 1 (= RS): Work A.1b 1 time, then work A.1a until 10 dc remain (= 14-16-18-20 times in width) and finish with A.1c 1 time. Instead of getting 16 shell patterns I get 18! What am I doing wrong?
29.01.2019 - 17:40DROPS Design answered:
Dear Trisha, You are working A.1b, repeating A.1c and finishing A.1c = you will get 18 shells at the end of pattern in size M together with A.1b and A.1c, that's right. Happy crocheting!
30.01.2019 - 07:20
Clare wrote:
This is the first time I have attempted to crochet anything. I thought I had understood the pattern until I found the video for fan pattern! I was trying to take the dtr into the 2ch of previous row rather than just go under the chain. I wonder if I should start again ;-( Also for largest size why are there only 20 ch for the sleeves? I don't understand, I would have thought there should be more than smaller sizes. Seems like the sleeves will be much shorter than depicted in the photo?
14.01.2019 - 10:37DROPS Design answered:
Dear Clare, you may start again as the pattern is explained/shown in the video. You cast on less sts on sleeve for larger size since shoulder will be larger. Happy crocheting!
14.01.2019 - 13:00
Clare wrote:
This is the first time I have attempted to crochet anything. I thought I had understood the pattern until I found the video for fan pattern! I was trying to take the dtr into the 2ch of previous row rather than just go under the chain. I wonder if I should start again ;-( Also for largest size why are there only 20 ch for the sleeves? I don't understand, I would have thought there should be more than smaller sizes. Seems like the sleeves will be much shorter than depicted in the photo?
13.01.2019 - 23:41
Mialina wrote:
Merci beaucoup !!!! Super réactif et compréhensible !!!! Bonne journée !!!
29.10.2018 - 11:03
Mialina wrote:
Bonjour après avoir arrêté le travail du dos et monter les 30 ml que faut il faire ? Est ce qu’il faut laisser les mailles en l’air pendre et reprendre le dos avec les 3rgs de A1 et finir A1avzc des mailles en l’air ? Au secours je suis perdu
26.10.2018 - 17:51DROPS Design answered:
Bonjour Mialina, vous crochetez les 30 ml, puis vous continuez A.1 sur les mailles du dos comme avant et terminez par 34 ml (= vous avez une chaînette de chaque côté du dos pour les manches). Au rang suivant, crochetez A.1b, répétez A.a et terminez par A.1c comme expliqué = votre premier rang sur les manches et le dos est fait, vous continuez maintenant sur toutes les mailles avec A.1b, A.1a et A.1c (vu sur l'endroit). Bon crochet!
29.10.2018 - 07:43
Marie-claude Marceille wrote:
Je ne comprend pas la suite après avoir monté les 58 cm de dos! on ne coupe pas la laine et on monte 20 ml en prolongement de chaque extrémités du travail effectué pour les manches ?
18.10.2018 - 06:43DROPS Design answered:
Bonjour Mme Marceille, après les 58 cm du dos, vous coupez le fil, puis continuez en montant une chaînette de 20 ml, puis crochetez A.1 comme avant sur le dos (= sur l'envers), et montez 24 ml pour l'autre manche. Continuez ensuite en point fantaisie comme indiqué. Bon crochet!
18.10.2018 - 09:43
Marion Deira wrote:
Hallo, het haken van het vest ging prima, duidelijk allemaal. de schouders heb ik aan elkaar. nu ben ik erg aan het puzzelen met de kraag. ik kom er maar niet uit hoe dit nou aan elkaar zit en hoe het er uit moet zien aan de achterkant. kunt u mij daar bij helpen?
18.09.2018 - 15:47DROPS Design answered:
Dag Marion, Als het goed is heb je tijdens het haken van de voorpanden een stukje extra gehaakt over alleen het deel van de voorbiezen, zodat er a.h.w. een lapje bovenop vast zit aan beide kanten. Deze beide stukken naai je aan de bovenkant vast en daarna aan de hals op het achterpand
19.09.2018 - 16:26
Waterfall#waterfalljacket |
|||||||||||||
|
|||||||||||||
Crochet DROPS jacket with shawl collar in ”Merino Extra Fine”. Size: S - XXXL.
DROPS 149-37 |
|||||||||||||
TR-GROUPS: 1 tr-group = 2 tr + ch 2 + 2 tr. PATTERN: See diagram A.1. ---------------------------------------------------------- BACK PIECE: Worked back and forth. Ch 108-120-133-145 on hook size 5 mm / H/8 with Merino Extra Fine. Work first row as follows (= WS): 1 sc in 2nd ch from hook and then 1 sc in each of the next 3 ch, * skip 1 ch, 1 sc in each of the next 4 ch *, repeat from *-* until 3-5-3-5 ch remain, skip 1 ch, 1 sc in each of the next 2-4-2-4 ch = 86-96-106-116 sc. Continue to work as follows: ROW 1 (= RS): Work A.1b 1 time, then work A.1a until 10 sc remain (= 14-16-18-20 times in width) and finish with A.1c 1 time. REMEMBER THE CROCHET GAUGE! ROW 2 (= WS): Turn piece and work A.1c 1 time, A.1a (= 14-16-18-20 times in width), A.1b 1 time. ROW 3 (= RS): Turn piece and work A.1b 1 time, A.1a (= 14-16-18-20 times in width), A.1c 1 time. Repeat 2nd and 3rd row until piece measures approx. 46-50-54-58 cm / 18"-19¾"-21¼"-22¾" – make sure to finish with 3rd row (= RS). Fasten off. Ch 30-25-25-20 loosely, beg from WS and continue A.1 over back piece as before and finish with 34-29-29-24 loose ch, turn piece. Continue to work as follows: ROW 1 (= RS): In 10th ch from hook work 2 tr + 2 ch + 2 tr (= A.1b), work A.1a 4-3-3-2 times in total, skip the last 4 ch, in tr at beg of back piece work 2 tr + 2 ch + 2 tr (= 1 tr-group), then work A.1a over back piece as before but in last tr at end of back piece work 2 tr + 2 ch + 2 tr, then work over the last 30-25-25-20 ch as follows: Skip the next 4 ch, A.1a 4-3-3-2 times in total and then A.1c 1 time, turn piece. ROW 2 (= WS): Turn piece and work A.1c 1 time, A.1a 24-24-26-26 times and finish with A.1b 1 time. ROW 3 (= RS): Turn piece and work A.1b 1 time, A.1a 24-24-26-26 times and finish with A.1c 1 time. Repeat 2nd and 3rd row until piece measures approx. 70-76-81-86 cm / 27½"-30"-32"-34" – make sure to finish with 3rd row (= RS). Work 11-11-12-12 tr-groups, finish with 1 ch and 1 tr in ch-space on next tr-group. Fasten off. Skip 2 tr-groups (= neck). Work 1 sl st in ch-space on next tr-group, then ch 5. Work 11-11-12-12 tr-groups. Fasten off. RIGHT FRONT PIECE: Worked back and forth. Ch 98-104-110-117 on hook size 5 mm / H/8 with Merino Extra Fine. Work 1 sc in 2nd ch from hook and then 1 sc in each of the next 3 ch, * skip 1 ch, 1 sc in each of the next 4 ch *, repeat from *-* until 3-4-5-2 ch remain, skip 1 ch, work 1 sc in each of the next 2-3-4-1 ch = 78-83-88-93 sc. ROW 1 (= RS): 4 ch (= 1 tr), 1 tr in each of the next 32 sc (= 33 tr for band) NOTE: Work band with every other row tr and dtr. Then ch 1, skip 4 sc, 2 tr + 2 ch + 2 tr in next sc, then work A.1a 6-7-8-9 times in total, finish with A.1c 1 time. ROW 2 (= WS): Turn piece and work A.1c 1 time, A.1a 6-7-8-9 times, 2 tr + 2 ch + 2 tr in next tr-group, 1 ch, work 1 dtr in each of the next 33 tr. ROW 3 (= RS): 4 ch (= 1 tr), 1 tr in each of the next 32 dtr (= 33 tr), 1 ch, 2 tr + 2 ch + 2 tr in first tr-group, then work A.1a 6-7-8-9 times in total, finish with A.1c 1 time. Repeat 2nd and 3rd row until piece measures 46-50-54-58 cm / 18"-19¾"-21¼"-22¾". Make sure to finish after 3rd row (= RS). Fasten off. Ch 30-25-25-20 loosely, beg from WS and then work A.1 and dtr over band as before, turn piece. Continue to work as follows: ROW 1 (= RS): 4 ch (= 1 tr), 1 tr in each of the next 32 tr (= 33 tr), 1 ch, 2 tr + 2 ch + 2 tr in ch-space in next tr-group, work A.1a until 1 tr remains on front piece, work 2 tr + 2 ch + 2 tr in tr, then work over the last 30-25-25-20 ch as follows: A.1a 4-3-3-2 times in total and then A.1c 1 time. ROW 2 (= WS): Turn piece and work A.1c 1 time, A.1a 11-11-12-12 times, 2 tr + 2 ch + 2 tr in next tr-group, 1 ch, then 1 dtr in each of the last 33 tr. ROW 3 (= RS): 4 ch (= 1 tr), 1 tr in each of the next 32 tr (= 33 tr), 1 ch, 2 tr + 2 ch + 2 tr in first tr-group, then work A.1a 11-11-12-12 times in total, finish with A.1c 1 time. Repeat 2nd and 3rd row until piece measures 72-78-83-88 cm / 28½"-30¾"-32¾"-34½". Finish with 2nd row. SHAWL COLLAR: When piece measures 72-78-83-88 cm / 28½"-30¾"-32¾"-34½", only work over band sts (= 32 tr/dtr). Then work short rows over band sts as follows: ROW 1 (RS): 32 tr, turn piece. ROW 2 (WS): 11 sc, 5 hdc, 5 dc, 11 tr, turn piece. Repeat these 2 rows until piece measures 10-10-11-11 cm / 4"-4"-4½"-4½" on the most narrow part – make sure to finish with 1st row (RS). LEFT FRONT PIECE: Work as right but reversed. NOTE: When piece measures approx. 46-50-54-58 cm / 18"-19¾"-21¼"-22¾" (make sure that last row is from RS), work next row from WS as follows: 33 dtr, work tr-groups as before over front piece and finish with 34-29-29-24 ch, turn piece and beg row as on back piece. Work band sts as on right front piece, finish shawl collar with 1st row (from WS instead of RS). ASSEMBLY: Work collar tog mid back as follows: 1 sc, *1 ch, 1 sc in next st*, repeat *-*. Place front piece on top of back piece and work the shoulders and band sts tog for neckline at the back as follows: * 1 sc through both layers, 3 ch, skip 2 dc *, repeat *-*. Work the sides tog as follows: 1 sc, *3 ch,1 sc in ch on next row*, repeat *-*. Work tog under sleeves as follows: * 1 sc in next ch with tr-group, 3 ch *, repeat *-* and end with 1 sc. |
|||||||||||||
Diagram explanations |
|||||||||||||
|
|||||||||||||
![]() |
|||||||||||||
![]() |
|||||||||||||
Have you finished this pattern?Tag your pictures with #dropspattern #waterfalljacket or submit them to the #dropsfan gallery. Do you need help with this pattern?You'll find 5 tutorial videos, a Comments/Questions area and more by visiting the pattern on garnstudio.com. © 1982-2025 DROPS Design A/S. We reserve all rights. This document, including all its sub-sections, has copyrights. Read more about what you can do with our patterns at the bottom of each pattern on our site. |
Post a comment to pattern DROPS 149-37
We would love to hear what you have to say about this pattern!
If you want to leave a question, please make sure you select the correct category in the form below, to speed up the answering process. Required fields are marked *.