Paternotte wrote:
Pourquoi à la fin du col doit-on faire 20 diminutions pour augmenter dès le début de l’empiecement? Pourquoi ce rétrécissement pendant 2rangs?
10.04.2020 - 13:48DROPS Design answered:
Bonjour Mme Paternotte, on diminue après les côtes du col pour conserver la largeur souhaitée (il faut plus de mailles en côtes que de mailles en jersey pour la même largeur), on tricote ensuite l'empiècement en augmentant régulièrement. Bon tricot!
14.04.2020 - 10:32
Griet wrote:
In patroon A.1 moet je in de 1ste, 3de, 11de en 13de rij een omslag maken tussen 2 steken. Moet je dit 1 maal doen of herhaal je dit gedurende de hele rij? Alvast dank voor het antwoord!
14.12.2019 - 17:46DROPS Design answered:
Dag Griet,
Dit doe je inderdaad bij elke patroonherhaling in de breedte, dus over de hele rij.
16.12.2019 - 16:36
Paola Canovaro wrote:
Sto eseguendo il modello,dopo la fine degli aumenti con le frecce fino ad arrivare all'inizio del corpo i calcoli sono sbagliati Grazie sono da rivedere. Sulla domanda che ho fatto prima,sto facendo la taglia al grazie. Prosím, kdy bude přeloženo do češtiny? Děkuji
03.12.2019 - 11:53DROPS Design answered:
Buongiorno Paola. I calcoli del numero delle maglie ci sembrano corretti. A questo link trova il testo in ceco. Buon lavoro>!
04.12.2019 - 16:43
Corinne GUILLET wrote:
Bonjour, dans les modèles, lorsque vous donnez le numéro des aiguilles, est ce la taille ou les données en mm, information sur le carton Romance Pro. Merci pour vos précisions. Cordialement
01.11.2019 - 11:14DROPS Design answered:
Bonjour Mme Guillet, tout à fait, la taille des aiguilles indiquées dans les modèles français est en système métrique, taille indiquée sur nos aiguilles. Bon tricot!
04.11.2019 - 14:57
Diane wrote:
Bonjour,quand je reprend les 64 ms des manches, vous dites relever 1 maille dans chacune des 10 ms sous la manche =74ms. si ont dit 64+10+10=84ms svp m'expliquer ?merci
28.08.2019 - 19:16DROPS Design answered:
Bonjour Diane, quand vous avez sauté les mailles des manches à la fin de l'empiècement, vous avez monté 10 m au-dessus des mailles mises en attente pour chacune des manches, vous avez donc 64 m mises en attente et vous relevez 1 maille dans chacune des 10 mailles que vous avez monté au dernier tour de l'empiècement, soit 74 m au total pour chaque manche. Bon tricot!
29.08.2019 - 08:59
Cathrine Persson wrote:
Hei. Når man skal strikke rapport A1, står det at man skal øke 24 masker jevnt fordelt ved stjerne. Strikker str M. Tilsammen etter A1 skal man ha 140 masker inkl 4 masker økt gjennom mønsteret. Da mangler det 4 masker når man starter med 108 masker. Har prøvd å regne på de forskjellige str, kun str S stemmer slik jeg ser. Er det en feil et sted?
03.08.2019 - 21:18DROPS Design answered:
Hej. I storlek M stickar du A.1 27 gånger. Du har i början 108 m (4 x 27 =108 m). När du har ökat 4 maskor i A.1 består den av 8 m. 8 x 27 = 216 m. 24 m ska ökas på ökningsvarvet med svart stjärna. 216+24 = 240 m. Lycka till!
22.08.2019 - 10:20
Claudine wrote:
Bonjour , après les augmentations du 1er rang sur A1 ou dois je augmenter ensuite pour parvenir a 216 mailles.Je ne comprends pas votre schéma Merci pour votre réponse
10.07.2019 - 15:34DROPS Design answered:
Bonjour Claudine, on augmente 1 maille dans chaque A.1 au 1er tour, au 3ème tour, au 11ème tour et au 13ème tour (cf jetés dans le diagramme) = vous avez désormais 8 m dans chaque A.1 soit 8 m x 27 = 216 m. Au tour avec une étoile dans A.1, vous augmentez 24 m à intervalles réguliers = 240 m. Bon tricot!
10.07.2019 - 16:00
Anne TUPIN wrote:
Pour ce modèle (DROP 197-10), je ne comprends pas à quel moment je dois augmenter les 82 mailles mentionnées au 6e rang du paragraphe "DOS & DEVANT". Par ailleurs, faut-il effectuer ces augmentations sur un même rang ? Sinon, doivent-elles se faire de manière progressive sur plusieurs rangs, jusqu'à l'arrivée aux côtes en bas du pull ?
15.05.2019 - 14:08DROPS Design answered:
Bonjour Mme Tupin, quand le dos et le devant (après la séparation des manches) mesure 27 cm, vous tricotez 1 tour endroit et sur ce tour, vous répartissez 82 augmentations (voir ici comment faire = vous avez maintenant 336 mailles sur l'aiguille et vous continuez au tour suivant en côtes 2 m end/2 m env avec l'aiguille 2,5. Bon tricot!
15.05.2019 - 15:06
Olaug wrote:
Rekker opp for 3 gong. Strikka på frå armhole på nytt utan å felle - fortsatt alt for stor. No 3. gong legg eg inn felling i midje.
25.03.2019 - 19:54
Grete Simpson wrote:
Hva er overvidden i de forskjellige størrelsene?
12.03.2019 - 19:30
Talvik#talviksweater |
||||||||||||||||||||||||||||
![]() |
![]() |
|||||||||||||||||||||||||||
Knitted jumper with round yoke in DROPS Alpaca. Piece is knitted top down with Nordic pattern. Size: S - XXXL Knitted hat with Nordic pattern and pompom in DROPS Alpaca.
DROPS 197-10 |
||||||||||||||||||||||||||||
EXPLANATION FOR THE PATTERN: ---------------------------------------------------------- PATTERN: Jumper: See diagrams A.1 and A.2. Hat: See diagram A.3. Work all stitches in stocking stitch. DECREASE/INCREASE TIP (evenly): To calculate how to decrease/increase evenly, use the total number of stitches on round (e.g. 124 stitches) and divide stitches by number of decreased/increases to be done (e.g. 20) = 6.2. In this example decrease by knitting approx. every 5th and 6th stitch together. When increasing make a yarn over after approx. every 6th stitch. On next round work yarn over twisted to avoid hole. KNITTING TIP: To avoid the knitting tension to tighten when working pattern, it is important not to tighten the strands on back side of piece. Switch to a higher needle number when working pattern if the pattern is somewhat tight. INCREASE TIP (applies to sides of body): Work until 2 stitches remain before marker thread, make 1 yarn over, knit 4 (marker thread is in the middle of these stitches), make 1 yarn over (= 2 stitches increased). On next round knit yarn over twisted to avoid holes. Then work the new stitches in stocking stitch. DECREASE TIP-1 (applies to mid under sleeve): Decrease 1 stitch on each side of marker thread as follows: Work until 4 stitches remain before marker and knit 2 together, knit 4 (marker thread is between these 4 stitches), slip 1 stitch knitwise, knit 1, pass slipped stitch over stitch worked (= 2 stitches decreased). DECREASE TIP-2 (applies to hat): Work until 2 stitches remain before marker thread, knit the next 2 stitches together (= 1 stitch decreased). Repeat at each of the remaining marker threads. ---------------------------------------------------------- START THE PIECE HERE: ---------------------------------------------------------- JUMPER - SHORT OVERVIEW OF THE PIECE: Worked in the round on circular needle from mid back, work top down. Work sleeves in the round on double pointed needles/a short circular needle. NECK EDGE: Cast on 124-128-136-140-148-152 stitches on a short circular needle size 2.5 mm with off white. Knit 1 round. Now work rib (= knit 2/purl 2) for 3 cm. Knit 1 round while decreasing 20-20-20-20-20-20 stitches evenly - read DECREASE/INCREASE TIP = 104-108-116-120-128-132 stitches. Knit 1 round. YOKE: Switch to circular needle size 3 mm. Read KNITTING TIP and REMEMBER THE KNITTING TENSION! Now work pattern A.1 (= 4 stitches) 26-27-29-30-32-33 times in total on round. On round with black star in A.1 increase 20-24-20-24-32-36 stitches evenly – remember DECREASE/INCREASE TIP = 228-240-252-264-288-300 stitches (including the 4 stitches increased in every repetition of A.1. Now work pattern A.2 in the round, AT THE SAME TIME on round with arrow increase evenly as follows: ARROW-1: Increase 24-36-36-36-36-36 stitches = 252-276-288-300-324-336 stitches. ARROW-2: Increase 24-24-36-36-36-36 stitches = 276-300-324-336-360-372 stitches. ARROW-3: Increase 24-24-24-36-36-36 stitches = 300-324-348-372-396-408 stitches. ARROW-4: Increase 12-24-24-24-24-24 stitches = 312-348-372-396-420-432 stitches. When entire A.2 has been worked vertically, piece measures 20 cm from cast-on edge. Now work piece in light beige and stocking stitch, AT THE SAME TIME on first round increase 14-10-14-17-20-14 stitches evenly. Increase like this every 4th-4th-5th-6th-8th-8th round 1-2-2-2-2-4 times in total = 326-368-400-430-460-488 stitches. Then work until piece measures 22-24-26-28-30-32 cm from cast-on edge. Work next round as follows: Knit 49-54-58-64-70-75 (= half back piece), slip the next 64-75-83-86-90-93 stitches on a stitch holder for sleeve, cast on 10-10-12-12-14-16 new stitches on needle (= in the side under sleeve), knit 99-109-117-129-140-151 (= front piece), slip the next 64-75-83-86-90-93 stitches on a stitch holder for sleeve, cast on 10-10-12-12-14-16 new stitches on needle (= in the side under sleeve) and knit the remaining 50-55-59-65-70-76 stitches (= half back piece). Finish body and sleeves separately. NOW MEASURE PIECE FROM HERE! BODY: = 218-238-258-282-308-334 stitches. Insert 1 marker thread in the middle of the 10-10-12-12-14-16 new stitches that were cast on under sleeves. Move the marker threads upwards when working. Continue in the round with light beige and stocking stitch. When piece measures 4 cm from division, increase 1 stitch on each side of both marker threads - read INCREASE TIP (= 4 stitches increased). Increase like this every 8th round 9 times in total = 254-274-294-318-344-370 stitches. Continue like this until piece measures 27 cm. Knit 1 round while increasing 82-86-94-106-116-122 stitches evenly - remember DECREASE/INCREASE TIP = 336-360-388-424-460-492 stitches. Switch to circular needle size 2.5 mm and work rib = knit 2/purl 2 for 4 cm. Cast off with knit over knit and purl over purl but to avoid at tight cast-off edge make 1 yarn over after every 4th stitch (cast off yarn overs as stitches). Jumper measures approx. 56-58-60-62-64-66 cm from shoulder and down. SLEEVE: Slip the 64-75-83-86-90-93 stitches from stitch holder in one side of piece double pointed needles/a short circular needle size 3 mm and pick in addition up 1 stitch in each of the 10-10-12-12-14-16 new stitches cast on under sleeve = 74-85-95-98-104-109 stitches. Insert 1 marker thread in the middle of the 10-10-12-12-14-16 stitches under sleeve. Begin round here and work in stocking stitch in the round. When sleeve measures 4 cm from division, decrease 2 stitches mid under sleeve - read DECREASE TIP-1! Decrease like this every 10th-8th-6th-6th-6th-4th round 7-3-9-5-1-18 times and every 8th-6th-4th-4th-4th-2nd round 4-12-10-14-20-4 times = 52-55-57-60-62-65 stitches. When sleeve measures 38-36-35-33-31-30 cm from division (shorter measurements in the larger sizes because of longer yoke), knit 1 round while increasing 16-17-19-20-18-19 stitches evenly - remember DECREASE/INCREASE TIP = 68-72-76-80-80-84 stitches. Switch to double pointed needles size 2.5 mm and work rib in the round = knit 2/purl 2. When rib measures 5 cm, cast off with knit over knit and purl over purl but to avoid a tight cast-off edge make 1 yarn over after every 4th stitch (cast off yarn overs as regular stitches). Sleeve measures approx. 43-41-40-38-36-35 cm from division. Work the other sleeve the same way. ---------------------------------------------------------- HAT - SHORT OVERVIEW OF THE GARMENT: Work in the round on a short circular needle. Switch to double pointed needles when needed. HAT: Cast on 120-132 stitches on circular needle size 2.5 mm with off white. Knit 1 round. Then work rib (= knit 2/purl 2) for 2 cm. Switch to circular needle size 3 mm and work pattern A.3 (= 12 stitches) 10-11 times in total on round. REMEMBER THE KNITTING TENSION! When A.3 has been worked vertically, piece measures approx. 14-14 cm. Then work in stocking stitch in the round with light beige. When piece measures 15-15 cm, insert 6 marker threads in the piece, 20-22 stitches apart each marker thread. On next round, decrease 1 stitch before every marker thread – read DECREASE TIP-2. Decrease like this every other round 14-17 times in total = 36-30 stitches. Knit 2 and 2 stitches together until there are 9-8 stitches on needle. Cut the yarn and pull it through the remaining stitches, tighten tog and fasten. Hat measures approx. 24-26 cm. Make a pompom approx. 6 cm in diameter. Use 3 strand light camel, 1 strand off white and 1 strand light beige to make pompom and fasten at the top of hat. |
||||||||||||||||||||||||||||
Diagram explanations |
||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||
Have you finished this pattern?Tag your pictures with #dropspattern #talviksweater or submit them to the #dropsfan gallery. Do you need help with this pattern?You'll find 26 tutorial videos, a Comments/Questions area and more by visiting the pattern on garnstudio.com. © 1982-2025 DROPS Design A/S. We reserve all rights. This document, including all its sub-sections, has copyrights. Read more about what you can do with our patterns at the bottom of each pattern on our site. |
Post a comment to pattern DROPS 197-10
We would love to hear what you have to say about this pattern!
If you want to leave a question, please make sure you select the correct category in the form below, to speed up the answering process. Required fields are marked *.