DROPS Super Sale · SAVE 30% on 5 cosy, wool yarns
DROPS Polaris
100% Wool
from 3.55 € /100g
Get the yarn to make this pattern from 49.70€.

The yarn cost is calculated from the pattern’s smallest size and the yarn’s cheapest product type. Looking for an even better price? You might find it on the DROPS Deals!

DROPS Autumn & Winter 26/27

Silver Night Cardigan

Knitted jacket in 1 strand DROPS Polaris or 2 strands DROPS Snow. Piece is knitted top down with European yoke, V-neck, I-cord and bands. Size XS – XXXL.

Highlight Size:


DROPS 271-42

#silvernightcardigan

DROPS design: Pattern po-142
Yarn group F or E + E
----------------------------------------------------------

SIZE:
XS - S - M - L - XL - XXL - XXXL

YARN:
DROPS POLARIS from Garnstudio (belongs to yarn group F)
1400-1600-1700-1900-2100-2300-2500 g colour 04, Medium Grey

Or use:
DROPS SNOW from Garnstudio (belongs to yarn group E)
1000-1150-1250-1350-1500-1650-1800 g colour 46, Medium Grey

NEEDLES:
DROPS CIRCULAR NEEDLE SIZE 15 mm: Length 80 cm.
DROPS CIRCULAR NEEDLE SIZE 8 mm: Length: 80 cm.
DROPS DOUBLE POINTED NEEDLES SIZE 8 mm.
The technique MAGIC LOOP will be used.

KNITTING TENSION:
7 stitches in width and 9 rows vertically in stocking stitch on needle size 15 mm = 10 x 10 cm.
REMEMBER: Needle size is only a suggestion. If you have too many stitches on 10 cm switch to larger sized needles or if you get too few stitches on 10 cm switch to smaller sized needles.

-------------------------------------------------------

Alternative Yarn – See how to change yarns here
Yarn Groups A to F – Use the same pattern and change the yarn here
Yarn usage using an alternative yarn – Use our yarn converter here

-------------------------------------------------------

You might also like...

DROPS Polaris
100% Wool
from 3.55 € /100g
Get the yarn to make this pattern from 49.70€.

The yarn cost is calculated from the pattern’s smallest size and the yarn’s cheapest product type. Looking for an even better price? You might find it on the DROPS Deals!

Pattern instructions

0
0

----------------------------------------------------------

EXPLANATION FOR THE PATTERN:

----------------------------------------------------------

INCREASE TIP-1:
INCREASE 1 STITCH TOWARDS THE LEFT- from RIGHT SIDE:
Use left needle to pick up yarn between 2 stitches from row below, pick up yarn from the front and knit stitch in stitch loop behind the needle.
INCREASE 1 STITCH TOWARDS THE RIGHT - from RIGHT SIDE:
Use left needle to pick up yarn between 2 stitches from row below, pick up yarn from the back and knit stitch in stitch loop in front of needle.

INCREASE TIP-2:
INCREASE 1 STITCH TOWARDS THE RIGHT - from WRONG SIDE:
Use left needle to pick up yarn between 2 stitches from row below, pick up yarn from the back and purl stitch in stitch loop in front of needle.
INCREASE 1 STITCH TOWARDS THE LEFT - from WRONG SIDE:
Use left needle to pick up yarn between 2 stitches from row below, pick up yarn from the front and purl stitch in stitch loop behind the needle.

2 STITCHES I-CORD:
BEGINNING OF ROW:
Slip 1 stitch purlwise with strand in front of piece, knit 1.
END OF ROW:
Work until 2 stitches remain on needle, slip 1 stitch purlwise with strand in front of piece, knit 1.
Work the same way both from right side and wrong side.

INCREASE TIP-3- for rib transition:
When increasing stitches evenly in transition for rib, there will be an even increase if you increase where stitches are going to be purled, the stitches in stocking stitch will then continue nicely over into rib.

SLEEVE TIP:
When picking up stitches mid under sleeve, there will be a small hole in the transition between stitches on body and sleeves. The holes can be closed by picking up the strand between two stitches - work this strand twisted together with the first stitch between body and sleeve to close the hole.

DECREASE TIP (applies to sleeves):
Decrease 1 stitch on each side of marker thread as follows:
Work until 3 stitches remain before marker thread, knit 2 together, knit 2 (marker thread is between these 2 stitches), slip 1 stitch knitwise, knit 1, pass slipped stitch over stitch worked (= 2 stitches decreased). When decreasing 1 stitch, decrease alternately before and after marker thread.

----------------------------------------------------------

START THE PIECE HERE:

----------------------------------------------------------

JACKET - SHORT OVERVIEW OF THE PIECE:
In this pattern needles of different length have been used, begin with fitting length for number of stitches and switch as needed.
If 0 stitches are given for the chosen size, it means that you skip the information and jump to next information.
Garment is worked as point 1 - 5.
1 – BACK PIECE:
Cast on stitches in the back of neck and work back piece back and forth downwards while at the same time increasing in each side of piece until number of stitches for shoulder width is reached. Back piece has a slight diagonal shoulder.
2 - FRONT PIECES:
First work a button band. Then pick up stitches along one shoulder on back piece, work front piece downwards while increasing towards the neck. Repeat on the other shoulder.
3- YOKE:
On next row work all stitches on same circular needle - work as follows: Work stitches on one front piece, pick up stitches for sleeve along the side on front piece, work stitches on back piece, pick up stitches for sleeve along the side on the other front piece and work stitches on last front piece = work yoke over all stitches back and forth from mid front.
4 – INCREASES FOR NECK, BODY AND SLEEVES:
While working the yoke increase stitches for V-neck, body and sleeves.
5 - BODY AND SLEEVES:
When all stitches have been increased and yoke is knitted to given measurements, divide the piece for body and sleeves. Work body downwards back and forth on circular needle while putting the sleeves aside. Then work sleeves downwards in the round on needle.
Finish working a belt.

----------------------------------------------------------

BACK PIECE:
Work piece back and forth on circular needle. Cast on 13-14-13-14-14-16-16 stitches on circular needle size 15 mm with 1 strand DROPS Polaris or 2 strands DROPS Snow.
ROW 1 (= wrong side): Purl all stitches.
ROW 2 (= right side): Read INCREASE TIP-1 and knit 1, increase 1 stitch towards the left, knit until 1 stitch remains, increase 1 stitch towards the right, knit 1.
ROW 3 (= wrong side): Read INCREASE TIP-2 and purl 1, increase 1 stitch towards the right, purl until 1 stitch remains, increase 1 stitch towards the left, purl 1.
ROW 4 (= right side): As 2nd ROW.
ROW 5 (= wrong side): As 3rd ROW.
ROW 6 (= right side): As 2nd ROW.
ROW 7 (= wrong side): As 3rd ROW.
ROW 8 (= right side): As 2nd ROW.
Increases are done in size XS and S. Work 3rd ROW 1 more time in the other sizes = 27-28-29-30-30-32-32 stitches.
Remember to follow the knitting tension! Cut the yarn, slip stitches on a thread or an stitch holder.

RIGHT BAND:
Cast on 6 stitches on circular needle size 15 mm.
Work as follows:
ROW 1 (= wrong side): 2 STITCHES I-CORD - read explanation above, knit 1, purl 2, knit 1.
ROW 2 (= right side): Purl 1, knit 2, purl 1, 2 stitches I-cord.
Work 1st and 2nd ROW until piece measures approx. 8-8-8-8-8-9-9 cm, adjust so that last row is worked from wrong side.
Cut the yarn – leave the stitches on thread or stitch holder.

RIGHT FRONT PIECE:
Find right shoulder on back piece as follows: Place back piece flat with right side up, place back piece so that stitches on thread/stitch holder is towards you, right side of piece = right shoulder.
Now pick up stitches along right diagonal shoulder on back piece - begin from right side at the armhole and pick up stitches in towards the neck as follows:
Pick up 1 stitch in every row worked inside edge stitch (= 8-8-9-9-9-9-9 stitches for shoulder), finish by working over right band as before (= 6 stitches band) = 14-14-15-15-15-15-15 stitches.
Insert 1 marker in piece in towards the neck, between shoulder and band. All length measurements are done from this marker, measured in stitch direction.
Work 5 rows stocking stitch and band as before (work first row from wrong side).
Piece measures approx. 5 cm from marker. Then increase stitches towards the neck as follows:
ROW 1 (= right side): Knit until 7 stitches remain, increase 1 stitch towards the right, knit 1 – remember INCREASE TIP-1, finish with band as before.
ROW 2 (= wrong side): Work band as before, purl the rest of row.
ROW 3 (= right side): Knit until 6 stitches remain, finish with band as before.
ROW 4 (= wrong side): Work band as before, purl the rest of row.
Work 1st to 4th ROW 2 times in total (= 8 rows worked) = 16-16-17-17-17-17-17 stitches.
Piece measures approx. 14 cm.
Cut the yarn, slip stitches on a thread or stitch holder, now work left shoulder along the left diagonal shoulder on back piece as explained below.

LEFT BAND:
Cast on 6 stitches on circular needle size 15 mm.
Work as follows:
ROW 1 (= wrong side): Knit 1, purl 2, knit 1, 2 stitches I-cord.
ROW 2 (= right side): 2 stitches I-cord, purl 1, knit 2, purl 1.
Work 1st and 2nd ROW until piece measures approx. 8-8-8-8-8-9-9 cm, adjust so that last row is worked from wrong side.
Don't cut the yarn – leave the stitches on thread or stitch holder.

LEFT FRONT PIECE:
Pick up stitches along left diagonal shoulder on back piece - begin from right side at the neck and pick up stitches out towards the armhole as follows:
With circular needle size 15 mm work band stitches from the right side as before (= 6 stitches), continue by picking up 1 stitch in every row worked inside outermost stitch along the shoulder down towards armhole (= 8-8-9-9-9-9-9 stitches) = 14-14-15-15-15-15-15 stitches for shoulder.
Insert 1 marker in piece in towards the neck between band and shoulder. All length measurements are done from this marker, measured in stitch direction.
Work 5 rows stocking stitch and band as before (work first row from wrong side).
Piece measures approx. 5 cm from marker. Then increase stitches towards the neck as follows:
ROW 1 (= right side): Work band as before, knit 1, increase 1 stitch towards the left - remember INCREASE TIP-1, knit the rest of row.
ROW 2 (= wrong side): Purl until 6 stitches remain, work band as before.
ROW 3 (= right side): Work band as before, knit the rest of row.
ROW 4 (= wrong side): Purl until 6 stitches remain, work band as before.
Work 1st to 4th ROW 2 times in total (= 8 rows worked) = 16-16-17-17-17-17-17 stitches.
Piece measures approx. 14 cm.
Now slip front pieces and back piece together and pick up stitches for sleeve as explained below.

YOKE:
ROW 1 (= right side): Work band as before, knit 1, increase 1 stitch towards the left - remember INCREASE TIP-1, knit until 1 stitch remains on front piece, insert 1 marker on row, knit 1 (= stitch belongs to sleeve), pick up 10 stitches along the side of left front piece (= stitches for sleeve - pick up stitches inside outermost stitch), knit first stitch from back piece (= stitch belongs to sleeve), insert 1 marker on row, knit until 1 stitch remains on back piece, insert 1 marker on row, knit 1 (= stitch belongs to sleeve), pick up 10 stitches along the side on right front piece (= stitches for sleeve - pick up stitches inside outermost stitch), knit first stitch from right front piece (= stitch belongs to sleeve), insert 1 marker on row, knit over front piece until 7 stitches remain, increase 1 stitch towards the right - remember INCREASE TIP-1, knit 1, finish with band as before.
ROW 2 (= wrong side):
Work band as before, purl until 6 stitches remain, finish with band as before.

3 increases for V-neck have been done in total. There are 12 stitches on each sleeve, 25-26-27-28-28-30-30 stitches on back piece and 16-16-17-17-17-17-17 stitches on each front piece = 81-82-85-86-86-88-88 stitches. Continue with increases as explained below.

Increase for body and sleeves inside 2 stitches in stocking stitch on front pieces/back piece. Work as follows - AT THE SAME TIME continue increase for V-neck every 4th row 3-3-3-3-3-4-4 more times (= 6-6-6-6-6-7-7 times in total in each side for V-neck).
Work as follows:

ROW 1 (= right side): Work as before until 2 stitches remain before first marker, increase 1 stitch towards the right, knit 2, move marker on to right needle, increase 1 stitch towards the left, work until next marker, increase 1 stitch towards the right, move the marker on to right needle, knit 2, increase 1 stitch towards the left, work until 2 stitches remain before next marker, increase 1 stitch towards the right, knit 2, move marker on to right needle, increase 1 stitch towards the left, work until next marker, increase 1 stitch towards the right, move marker on to right needle, knit 2, increase 1 stitch towards the left, work the rest of row as before (= 8 stitches increased - NOTE: Remember to increase for V-neck as explained above.
ROW 2 (= wrong side): Work band as before, purl until 6 stitches remain, finish with band as before.
Work 1st and 2nd ROW 6-7-8-8-9-10-11 times in total (= 12-14-16-16-18-20-22 rows). Increases for V-neck are now done. There are 24-26-28-28-30-32-34 stitches on each sleeve, 37-40-43-44-46-50-52 stitches for back piece and 25-26-28-28-29-31-32 stitches for each front piece = 135-144-155-156-164-176-184 stitches.

Sleeve measures approx. 13-16-18-18-20-22-24 cm - when the jacket is folded double at the shoulder, piece should measure 20-23-25-25-27-29-31 cm from the edge on shoulder and down along the armhole. If the garment is shorter than this, continue until correct measurements without increases.
Now divide yoke for body and sleeves.

DIVIDING FOR BODY AND SLEEVES:
AT THE SAME TIME as next row is worked divide yoke for body and sleeves as follows:
Work 25-26-28-28-29-31-32 stitches as before (= front piece), slip the next 24-26-28-28-30-32-34 stitches on a thread for sleeve, cast on 2-2-2-4-6-6-8 new stitches on row (= in the side mid under sleeve), and work the next 37-40-43-44-46-50-52 stitches in stocking stitch (= back piece), slip the next 24-26-28-28-30-32-34 stitches on a thread for sleeve, cast on 2-2-2-4-6-6-8 new stitches on row (= in the side mid under sleeve) and work the last 25-26-28-28-29-31-32 stitches as before (= front piece).
Finish body and sleeves separately.

BODY:
= 91-96-103-108-116-124-132 stitches.
Work stocking stitch and bands as before until piece measures 52-54-56-58-60-62-64 cm from cast-on edge mid back.
On next row from right side begin rib while AT THE SAME TIME increasing 4-3-4-3-3-3-3 stitches evenly on row (do not increase over bands), read INCREASE TIP-3 and work as follows:
Switch to circular needle size 8 mm, work 6 stitches band as before, work rib (= knit 3 and purl 1) – remember increase until 9 stitches remain, finish with 3 knit and 6 stitches band as before = 95-99-107-111-119-127-135 stitches.
Work 6 rows rib in total - i.e. work last row from wrong side.
Cast off somewhat loosely by knitting from the right side.
Jacket measures approx. 57-59-61-63-65-67-69 cm from mid back and 60-62-64-66-68-70-72 cm from the top of shoulder.

SLEEVES:
Slip 24-26-28-28-30-32-34 sleeve stitches from one thread on to needle size 15 mm and pick in addition up 1 stitch in each of the 2-2-2-4-6-6-8 stitches cast on under sleeve - read SLEEVE TIP = 26-28-30-32-36-38-42 stitches.
Insert 1 marker in the middle of the 2-2-2-4-6-6-8 new stitches under sleeve - round begins at the marker thread.
Work in stocking stitch in the round - AT THE SAME TIME when sleeve measures 1 cm from division, decrease mid under sleeve – read DECREASE TIP and decrease as follows: Decrease 2 stitches 0-0-0-1-2-2-2 times every 2nd round, then decrease 1 stitch alternately before and after marker thread every 5 cm 2-2-2-2-2-2-4 times in total = 24-26-28-28-30-32-34 stitches on needle.
Work until sleeve measures 38-36-34-34-33-31-30 cm from division.
Switch to double pointed needles size 8 mm and work rib (= knit 3 and purl 1) while AT THE SAME TIME increasing 4-2-4-4-2-4-2 stitches evenly on 1st round - remember INCREASE TIP -3= 28-28-32-32-32-36-36 stitches.
Work 6 rounds rib in total. Cast off somewhat loosely by knitting.
Sleeve measures 43-41-39-39-38-36-35 cm from division and approx. 56-57-57-57-58-58-59 cm from pick up edge on shoulder.

BELT:
Work a tube with 3 stitches on circular needle size 15 mm as follows: Cast on 3 stitches and knit 1 row. Then work as follows: * Slip all 3 stitches back onto left needle, tighten yarn and knit over all stitches *, repeat from *-* until belt measures 170-180-190-200-215-230-245 cm. Cut and fasten the yarn. The belt can be basted through a couple of stitches in each side of body.

ASSEMBLY:
Sew bands from each front piece together - seam = mid back, then fasten band to stitches in the back of the neck.

Diagram

Diagram for DROPS 271-42

Each of our patterns has specific tutorial videos to help you. Learn to knitt

Do you have a question? See a list of frequently asked questions (FAQ)

Knitting tension is what determines the final measurements of your work, and is usually measured per 10 x 10 cm. It is provided like so: number of stitches in width x number of rows in height - eg: 19 stitches x 26 rows = 10 x 10 cm.

The knitting tension is very individual; some people knit/crochet loosely while others work tightly. You adjust the knitting tension with the needle size, which is why the suggested needle size is only meant as a guide! You need to adjust this (up or down) to ensure that YOUR knitting tension matches the knitting tension provided in the pattern. If you work with a different knitting tension than provided you will have a different yarn consumption, and your work will have different measurements than what the pattern suggests.

The knitting tension also determines which yarns can replace each other. As long as you achieve the same knitting tension you can replace one yarn with another.

See DROPS lesson: How to measure your tension/gauge

See DROPS video: How to make a gauge tension swatch

The required amount of yarn is provided in grams, eg: 450 g. To calculate how many balls you’ll need you first need to know how many grams are in 1 ball (25g, 50g or 100g). This information is available if you click on the individual yarn quality on our pages. Divide the amount required with the amount of each ball. For example, if each ball is 50g (the most common amount), the calculation will be as follows: 450 / 50 = 9 balls.

The important thing when changing from one yarn to another is that the knitting/crochet tension remains the same. This is so that the measurements of the finished piece will be the same as on the sketch provided. It is easier to achieve the same knitting tension using yarns from the same yarn group. It is also possible to work with multiple strands of a thinner yarn to achieve the knitting tension of a thicker one. Please try our yarn converter. We recommend you to always work a test swatch.

Please NOTE: when changing yarn the garment might have a different look and feel to the garment in the photo, due to individual properties and qualities of each yarn.

See DROPS lesson: Can I use a different yarn than the one mentioned in the pattern?

All our yarns are categorised into yarn groups (from A to F) according to thickness and knitting tension – group A contains the thinnest yarns and group F the thickest. This makes it easier for you to find alternative yarns to our patterns, should you wish to switch yarn. All yarns within the same group have a similar knitting tension and can easily replace each other. However, different yarn qualities have different structures and properties which will give the finished work a unique look and feel.

Click here for an overview of the yarns in each yarn group

At the top of all our patterns you’ll find a link to our yarn calculator, which is a helpful tool should you wish to use a different yarn than suggested. By filling in the yarn quality you wish to replace, the amount (in your size) and number of strands, the calculator will present good alternative yarns with the same knitting tension. Additionally it will tell you how much you’ll require in the new qualities and whether you’ll need to work with multiple strands. Most skeins are 50g (some are 25g or 100g).

If the pattern is worked with multiple colours, every colour will have to be calculated separately. Similarly, if the pattern is worked with several strands of different yarns (for example 1 strand Alpaca and 1 strand Kid-Silk) you will have to find alternatives for each, individually.

Click here to see our yarn calculator

Since different yarns have different qualities and textures we have chosen to keep the original yarn in our patterns. However, you can easily find options among our available qualities by using our yarn calculator, or simply pick a yarn from the same yarn group.

It is possible that some retailers still have discontinued yarns in stock, or that someone has a few skeins at home that they would like to find patterns for.

The yarn calculator will provide both alternative yarn as well as required amount in the new quality.

If you think it's hard to decide what size to make, it can be a good idea to measure a garment you own already and like the size of. Then you can pick the size by comparing those measures with the ones available in the pattern's size chart.

You'll find the size chart at the bottom of the pattern.

See DROPS lesson: How to read size chart

The needle size provided in the pattern serves only as a guide, the important thing is to follow the knitting tension. And since knitting tension is very individual, you will have to adjust the needle size to ensure that YOUR tension is the same as in the pattern – maybe you’ll have to adjust 1, or even 2 needle sizes, up or down to achieve the correct tension. For this, we recommend that you work test swatches.

Should you work with a different knitting tension than the one provided, the measurements of the finished garment might deviate from the measurement sketch.

See DROPS lesson: How to measure your tension/gauge

See DROPS video: How to make a tension/gauge swatch

Working a garment top-down provides more flexibility and room for personal adjustment. For example it is easier to try the garment on while working, as well as making adjustments to length of yoke and shoulder caps.

The instructions are carefully explaining every step, in the correct order. Diagrams are adjusted to the knitting direction and are worked as usual.

The diagram depicts all rows/rounds, and every stitch seen from the right side. It is read from bottom to top, from right to left. 1 square = 1 stitch.

When working back and forth, every other row is worked from the right side and every other row is worked from the wrong side. When working from the wrong side, the diagram will have to be worked reversed: from left to right, knit stitches are purled, purl stitches are knit etc.

When working in the round every round is worked from the right side and the diagram are worked from right to left on all rounds.

See DROPS lesson: How to read knitting diagrams

The diagram depicts all rows/rounds, and every stitch seen from the right side. It is worked from bottom to top, from right to left.

When working back and forth every other row is worked from the right side: from right to left and every other row is worked from the wrong side: from left to right.

When working in the round, every row in the diagram are worked from the right side, from right to left.

When working a circular diagram you start in the middle and work your way outwards, counter clockwise, row by row.

The rows usually start with a given number of chain stitches (equivalent to the height of the following stitch), this will either be depicted in the diagram or explained in the pattern.

See DROPS lesson: How to read crochet diagrams

Instructions for working several diagrams after each other on the same row/round, will often be written like so: “work A.1, A.2, A.3 a total of 0-0-2-3-4 times". This means you work A.1 once, then A.2 is worked once, and A.3 is repeated (in width) the number of times provided for your size – in this case like so: S = 0 times, M = 0 times, L=2 times, XL= 3 times and XXL = 4 times.

The diagrams are worked as usual: begin with the first row in A.1, then work the first row in A.2 etc.

See DROPS lesson: How to read knitting diagrams

See DROPS lesson: How to read crochet diagrams

The total width of the garment (from wrist-to-wrist) will be larger in the larger sizes, despite the actual sleeves being shorter. The larger sizes have longer sleeve caps and wider shoulders, so there will be a good fit in all sizes.

The measurement sketch/schematic drawing provides information regarding the full length of the garment. If it’s a jumper or a jacket the length is measured from the highest point on the shoulder closest to the neckline, and straight down to the bottom of the garment. It is NOT measured from the tip of shoulder. Similarly, the length of yoke is measured from the highest point on the shoulder and down to where yoke is split into body and sleeves.

On a jacket measures are never taken along bands, unless specifically stated. Always measure inside band stitches when measuring the length.

See DROPS lesson: How to read a schematic drawing

Diagrams are often repeated on the round or in height. 1 repeat is the diagram the way it appears in the pattern. If it says to work 5 repeats of A.1 in the round, then you work A.1 a total of 5 times after/next to each other in the round. If it says to work 2 repeats of A.1 vertically/in height you work the entire diagram once, then begin again at the start and work the entire diagram one more time.

Chain stitches are slightly narrower than other stitches and to avoid working the cast-on edge too tight, we simply chain more stitches to begin with. The stitch count will be adjusted on the following row to fit the pattern and measurement sketch.

The rib edge is more elastic and will contract slightly compared to, for example, stocking stitch. By increasing before the rib edge, you avoid a visible difference in width between the rib edge and the rest of the body.

It’s very easy to cast off too tightly, and by making yarn overs while casting off (and simultaneously casting these off) you avoid a too tight cast off edge.

See DROPS video: How to bind off with yarn overs (yo)

To achieve an even increase (or decrease) you can increase on, for example: every 3rd and 4th row alternately, like so: work 2 rows and increase on the 3rd row, work 3 rows and increase on the 4th. Repeat this until the increase is complete.

See DROPS lesson: Increase or decrease 1 st on every 3rd and 4th row alternately

Should you prefer to work in the round instead of back and forth, you may of course adjust the pattern. You’ll need to add steeks mid-front (usually 5 stitches), and follow the instructions. When you would normally turn and work from the wrong side, simply work across the steek and continue in the round. At the end you’ll cut the piece open, pick up stitches to work bands, and cover the cut edges.

See DROPS video: How to knit steeks and cut open

Should you prefer to work back and forth instead of in the round, you may of course adjust the pattern so you work the pieces separately and then assemble them at the end. Divide the stitches for the body in 2, add 1 edge stitch in each side (for sewing) and work the front and back pieces separately.

See DROPS lesson: Can I adapt a pattern for circular needles into straight needles?

Pattern repeats can vary slightly in the different sizes, in order to get the correct proportions. If you’re not working the exact same size as the garment in the photo, yours might deviate slightly. This has been carefully developed and adjusted so that the complete impression of the garment is the same in all sizes.

Make sure to follow instructions and diagrams for your size!

If you have found a pattern you like which is available in women’s size it’s not very difficult to convert it to men’s size. The biggest difference will be the length of sleeves and body. Start working on the women size that you think would fit across the chest. The additional length will be worked right before you cast off for the armhole/sleeve cap. If the pattern is worked top-down you can add the length right after the armhole or before the first decrease on sleeve.

Regarding additional yarn amount, this will depend on how much length you add, but it is better with a skein too many than too few.

All yarns will have excess fibres (from production) that might come off as lint or shedding. Brushed yarns (ie hairier yarns) have more of these loose, excess fibres, causing more shedding.

Shedding also depends on what is worn under or over the garment, and whether this pulls at the yarn fibres. It’s therefore not possible to guarantee that there will be no shedding

Below are some tips on how to get the best result when working with hairier yarns:

1. When the garment is finished (before you wash it) shake it vigorously so the looser hairs come off. NOTE: do NOT use a lint roller, brush or any method that pulls at the yarn.

2. Place the garment in a plastic bag and put it in your freezer - the temperature will cause the fibres to become less attached to each other, and excess fibres will come off easier.

3. Leave in the freezer for a few hours before taking it out and shaking it again.

4. Wash the garment according to the instructions on the yarn label.

Pilling is a natural process that happens to even the most exclusive of fibers. It's a natural sign of wear and tear that is hard to avoid, and that is most visible in high friction areas of your garment like a sweater's arms and cuffs.

You can make your garment look as new by removing the pilling, using a fabric comb or a pill/lint remover.

Still can't find the answer you need? Then scroll down and leave your question so one of our experts can try to help you. This will be done normally within 5 to 10 working days.
In the meantime, you can read the questions and answers that others have left to this pattern or join the DROPS Workshop on Facebook to get help from fellow knitters/crocheters!
Have you finished this pattern?
Tag your pictures with #dropspattern #silvernightcardigan or submit them to the #dropsfan gallery.

Post a comment to pattern DROPS 271-42

We would love to hear what you have to say about this pattern!

If you want to leave a question, please make sure you select the correct category in the form below, to speed up the answering process. Required fields are marked *.