Ingrid Hudson wrote:
Thank you so much for the extremely speedy and kind , courteous and clear reply / explanation. May I say, without wanting to be rude, that this pattern does not seem as clearly explained as your other ones - it does not even state clearly where to place the markers. Love your website, patterns and yarns! Thank you for your support.
29.04.2022 - 20:46
Ingrid Hudson wrote:
I am knitting this in size S. I cast on 133 stitches for the neck edge. Then, for the yoke, the instruction only totals 105 stitches. What happened to the other 28 stitches? I am stuck.
29.04.2022 - 15:38DROPS Design answered:
Dear Mrs Hudson, work the 133 sts as follows: 7 band stitches in garter stitch, A.1 over the next 18 stitches, A.2 (= 7 stitches for the raglan), A.3 over the next 9 stitches, A.2 (= 7 stitches for the raglan), A.3 over the next 37 stitches, A.2 (= 7 stitches for the raglan), A.3 over the next 9 stitches, A.2 (= 7 stitches for the raglan), A.3 over the next 18 stitches, and finish with 7 band stitches in garter stitch = 7+18+7+9+7+37+7+9+7+18+7=133 stitches. Happy knitting!
29.04.2022 - 16:37
Diane Calvert wrote:
Thank you for the translation. This is very helpful. I am looking forward to knitting this cardigan!
28.04.2022 - 01:04
Diane wrote:
Your answer to Anne Brit Berkeland on 14/02/22 is what I am after. Would you please translate to English please, apologies as I do not understand Norwegian. Many thanks.
26.04.2022 - 23:05DROPS Design answered:
Dear Diane, in size S and M you have 133 sts and work them as follows: 7 band stitches in garter stitch, A.1 over the next 18 stitches, A.2 (= 7 stitches), A.3 over the next 9 stitches, A.2 (= 7 stitches), A.3 over the next 37 stitches, A.2 (= 7 stitches), A.3 over the next 9 stitches, A.2 (= 7 stitches), A.3 over the next 18 stitches, and finish with 7 band stitches in garter stitch = 7+18+7+9+7+37+7+9+7+18+7=133 stitches. Hope it will help. Happy knitting!
27.04.2022 - 08:27
Engelien Vinken wrote:
Na de halsrand ga je beginnen met meerderen voor de raglan , ik brei geen patroon. Hoe tel ik waar ik meerder voor de raglan. Ook al tel ik de steken van A1, A2, A3 dan nog kom ik er niet aan uit. bvd Engelien
31.03.2022 - 14:42DROPS Design answered:
Dag Engelien,
Je meerdert steeds op iedere naald aan de goede kant (je meerdert dus om de naald) voor de raglan. Je kunt een markeerder of markeerdraad plaatsen waar anders de telpatronen gebreid zouden worden.
04.04.2022 - 13:54
Helle, Danmark wrote:
Er igang med str. M og er færdig med udtagninger på bærestykket og har 389 masker. Set fra vrangen er der en vrangmaske på hver side af raglan - som jo også starter og slutter med vrang - er det korrekt (eller giver det problemer med mønsteret længere nede, når jeg skal dele til ryg og forstykker)
31.03.2022 - 13:16
PIA wrote:
Hej. Jeg er åbentbart ikke den eneste som ikke kan få maskeantal til at passe med det der står. Jeg slår 141 masker op og strikker de masker der står, altså 7-20-9-41-9-20-7 og så slår jeg en ny maske op på begge sider af A2 =8 masker, så sammenlagt får jeg 7+20+9+41+9+20+7+8= 121 masker, jeg har så 20 masker i overskud🤔der må da være et eller andet forkert. Mvh Pia
21.03.2022 - 17:21DROPS Design answered:
Hej Pia. Du missar att sticka A.2 (=7 maskor) på 4 ställen. Du ska sticka såhär: 7+20+7+9+7+41+7+9+7+20+7= 141 m. När vi skriver " A.3 over de neste 9 maskene" så är det 9 m av kun A.3, A.2 (=7 m) stickas separat. Mvh DROPS Design
22.03.2022 - 11:05
Monica Hammarström wrote:
Jag har inte beskrivningar på det som heter A----. var hittar jag dessa ?
12.03.2022 - 01:51DROPS Design answered:
Hei Monica. Oj-da, her var det litt vanskelig å skjønne hva du mener med A-----. Tenker du på diagrammene A.1, A.2 og A.3 (digrammene finner du under målskissen og forklaringen over målskissen), eller er det noe annet? mvh DROPS Design
14.03.2022 - 13:58
Jane Ellegaard wrote:
Jeg er også igang med denne model kunne heller ikke få maske antallet til at passe a2 =7m står ikke i opskrifte. Er det en fejl.mvh Jane Ellegaard
07.03.2022 - 17:46
عبير wrote:
\r\n7 + A.1[18.18..20.20.22.22] + A.2[7] + A.3[9] + A.2[7] + A.3[37.37.41.41.45.45] + A.2[7] + A.3[9] + A.2[7] + A.3[18.18.20.20.22.22] + 7
01.03.2022 - 10:24
Desert Mirage Cardigan#desertmiragecardigan |
|||||||
![]() |
![]() |
||||||
Knitted jacket in DROPS Nord. Piece is knitted top down with raglan, broken rib and stripes. Size: S - XXXL
DROPS 232-15 |
|||||||
---------------------------------------------------------- EXPLANATION FOR THE PATTERN: ---------------------------------------------------------- PATTERN: See diagrams A.1, A.2 and A.3. Diagrams show all rows in pattern seen from the right side. GARTER STITCH (back and forth): Knit all rows. 1 ridge vertically = knit 2 rows. STRIPES: * Work 7-7-7-8-8-8 cm with colour light beige, work 3 cm with colour powder pink *, work from *-*. BUTTONHOLES: Decrease for buttonholes on right band (when garment is worn). Decrease from right side when 4 stitches remain on row as follows: Make 1 yarn over, knit the next 2 stitches together, knit the last 2 stitches. On next row knit yarn over to make holes. Decrease first buttonhole when rib in the neck measures 3 cm. Then decrease the next 4-4-4-5-5-5 approx. 10-10-10-9½-9½-10 cm between each buttonhole. RAGLAN: Increase 1 stitch in each side of 7 stitches (= A.2) in every transition between body and sleeves (= 8 stitches increased on round). Increase 1 stitch by making 1 yarn over. On next row work yarn overs twisted to avoid holes. Then work the new stitches in pattern A.3/A.1. DECREASE TIP (applies to sleeves): Decrease 1 stitch on each side of marker thread as follows: Work until 3 stitches remain before marker thread and knit 2 together, knit 2 (marker thread is between these 2 stitches), slip 1 stitch knitwise, knit 1, pass slipped stitch over stitch worked. ---------------------------------------------------------- START THE PIECE HERE: ---------------------------------------------------------- JACKET - SHORT OVERVIEW OF THE PIECE: Work neck edge and yoke back and forth on circular needle from mid front, work top down. Now divide yoke for body and sleeves. Work body back and forth on circular needle. Work sleeves in the round on double pointed needles/a short circular needle. NECK EDGE: Cast on 133-133-141-141-149-149 stitches on circular needle size 2.5 mm with colour light beige in DROPS Nord. Purl 1 row from wrong side. Work next row as follows - from right side and mid front as follows: Work 7 band stitches in garter stitch, * knit 1, purl 1 *, work from *-* until 8 stitches remain, knit 1 and finish with 7 band stitches in garter stitch. Work like this until rib measures 4 cm. Insert 1 marker after band, at the beginning of row mid front. Measure yoke from this marker. Work STRIPES - see explanation above. The 4 cm in the neck edge are not counted with the stripes (i.e. work 11-11-11-12-12-12 cm in total with colour light beige before first stripe with colour powder pink). YOKE: Switch to circular needle size 3 mm and work as follows - from right side: 7 band stitches in garter stitch, A.1 over the next 18-18-20-20-22-22 stitches, A.2, A.3 over the next 9 stitches, A.2, A.3 over the next 37-37-41-41-45-45 stitches, A.2, A.3 over the next 9 stitches, A.2, A.3 over the next 18-18-20-20-22-22 stitches, and finish with 7 band stitches in garter stitch. Continue this pattern, on next row from right side begin increase for RAGLAN – read explanation above (= 8 stitches increased). Increase like this on every other row (= every row from right side) 26-32-34-40-44-50 times in total = 341-389-413-461-501-549 stitches. REMEMBER THE KNITTING TENSION! Work without increase until piece measures 21-23-25-27-29-31 cm from marker thread. Now divide yoke for body and sleeves: Work the first 55-61-65-71-77-83 stitches as before (left front piece), slip the next 67-79-83-95-103-115 stitches on a thread for sleeve, cast on 9-9-11-11-13-13 new stitches on row (in the side under sleeve), work the next 97-109-117-129-141-153 stitches as before (back piece), slip the next 67-79-83-95-103-115 stitches on a thread for sleeve, cast on 9-9-11-11-13-13 new stitches on row (in the side under sleeve) and work the remaining 55-61-65-71-77-83 stitches as before (right front piece). BODY: = 225-249-269-293-321-345 stitches. Work in A.1 and back and forth with 7 band stitches in garter stitch in each side towards mid front. Continue with stripes but when 4 stripes have been worked in total with colour powder pink, finish the piece with colour light beige. Work until piece measures 24 cm from division - finish with a row from wrong side. 4 cm remain until finished measurements. Try the jacket and work to desired length. Knit 1 row from right side while increasing 46-50-54-58-64-70 stitches evenly, do not increase over band stitches = 271-299-323-351-385-415 stitches. Switch to circular needle size 2.5 mm. Work next row as follows from wrong side: 7 band stitches in garter stitch, * purl 1, knit 1 *, repeat from *-* until 8 stitches remain on needle, purl 1, and finish with 7 band stitches in garter stitch. Continue rib like this for 4 cm. Cast off. Jacket measures approx. 52-54-56-58-60-62 cm from shoulder and down. SLEEVE: Slip the 67-79-83-95-103-115 stitches from thread in one side of piece back on a short circular needle/double pointed needles size 3 mm, and pick in addition up 1 stitch in each of the 9-9-11-11-13-13 stitches cast on under sleeve = 76-88-94-106-116-128 stitches. Insert a marker thread in the middle of the new stitches. Work pattern as before and continue with stripes. When 5 stripes have been worked in total with colour powder pink, finish the piece with colour light beige. AT THE SAME TIME when piece measures 3-3-3-2-2-3 cm, decrease 2 stitches under sleeve - READ DECREASE TIP. Decrease like this approx. every 6-3-2½-2-1½-1 cm 6-10-10-14-18-22 times in total = 64-68-74-78-80-84 stitches. Continue until piece measures 35-34-31-31-29-28 cm from division. Switch to double pointed needles size 2.5 mm. Work rib (knit 1/purl 1) for 4 cm. Cast off. Sleeve measures approx. 39-38-35-35-33-32 cm from division. Work the other sleeve the same way. ASSEMBLY: Sew the buttons on to left band. |
|||||||
Diagram explanations |
|||||||
|
|||||||
![]() |
|||||||
Have you finished this pattern?Tag your pictures with #dropspattern #desertmiragecardigan or submit them to the #dropsfan gallery. Do you need help with this pattern?You'll find 27 tutorial videos, a Comments/Questions area and more by visiting the pattern on garnstudio.com. © 1982-2025 DROPS Design A/S. We reserve all rights. This document, including all its sub-sections, has copyrights. Read more about what you can do with our patterns at the bottom of each pattern on our site. |
Post a comment to pattern DROPS 232-15
We would love to hear what you have to say about this pattern!
If you want to leave a question, please make sure you select the correct category in the form below, to speed up the answering process. Required fields are marked *.