Brigitte Allard wrote:
J\'ai le même problème qu\'Anne et je ne comprends pas votre réponse. \r\n9+41+9+41=100. L\'ennui c\'est que j\'ai 128 mailles. Que dois comprendre
25.04.2023 - 20:29DROPS Design answered:
Bonjour Mme Allard, tricotez vos 128 mailles ainsi: 7 m de A.1, 9 m de A.2, 7 m de A.1, 41 m de A.2, 7 m de A.1, 9 m de A.2, 7 m de A.1, 41 m de A.2 = 7+9+7+41+7+9+7+41=128. Les mailles de A.1 sont les mailles des raglans, vous allez augmenter de part et d'autre de ces 7 mailles - les sections tricotées en A.2 (9 m pour les manches et 41 m pour le devant et le dos) vont s'élargir, tricotez toujours ces mailles en suivant le diagramme A.2. Bon tricot!
26.04.2023 - 08:46
Allard Brigitte wrote:
I thank you very much for your explanations...
25.04.2023 - 16:26
Allard Brigitte wrote:
Pourriez vous me dire a quel moment il faut commencer le motif a1 et a2 je ne comprends pas bien vos explications. merci d'avance
22.04.2023 - 21:09DROPS Design answered:
Bonjour Mme Allard, les diagrammes A.1 et A.2 se tricotent dès le 1er rang de l'empiècement; A.1 correspond aux mailles du raglan (vous augmenterez de chaque côté de ces mailles) et A.2 aux mailles que vous tricotez entre les mailles du raglan (dos, devant et manches) - pour que A.2 soit symétrique, on répète A.2 sur un nombre pair de mailles et on termine par la 1ère maille du diagramme. Bon tricot!
24.04.2023 - 10:01
Gabriela Canova wrote:
Con 136 maglie nel bordo, come vengono distribuiti i raglan? Lo schema prevede 9 + 45 + 9+ 45 = 108 così però io ho 28 maglie in più. Dove sbaglio?
23.03.2023 - 09:09DROPS Design answered:
Buonasera Gabriela, ha considerato anche le 4 ripetizioni di A.1? Sono 28 maglie in totale. Buon lavoro!
23.03.2023 - 20:47
Benedicte wrote:
Finner ingen målskisse
11.02.2023 - 20:08
Adriana Isabel Kesselman wrote:
Hello!!! I would like to knit this pattern in Alpaca 2 threads. Can you tell me how many grams of yarn are needed for a size M??? Thank you, so much!!!!
07.02.2023 - 15:06DROPS Design answered:
Dear Mrs Kesselman, you would have a completely different tension and would have to recalculate the pattern entirely - you can find our jumpers worked with Alpaca and 17-16 sts (this means you can work with double strand) here - edit/ add more filters if required. Happy knitting!
07.02.2023 - 17:00
Van Loocke wrote:
Bonjour j'aimerais savoir à quoi correspond les 3cm après les 4 cm de l'encolure sur le croquis du modèle pull femme rayé 232-16 je ne sais pas quand il faut commencer le raglan Merci pour votre aide
09.01.2023 - 14:42DROPS Design answered:
Bonjour Mme Van Loocke, ces 3 cm correspondent à la hauteur des épaules quand l'ouvrage est posé à à plat. Les augmentations du raglan commencent dès le début de l'empiècement - cf EMPIÈCEMENT et RAGLAN. Bon tricot!
09.01.2023 - 16:47
Annette Toft wrote:
Jeg slår 120 masker op i str. small. Bærestykket, a.1,a2 9 masker, a1.a2 37 masker, a1.a2 9 masker og a1.a2 37 masker, d.v.s. 92 masker ialt, men jeg har slået 120 masker op, så jeg kan ikke lige se, hvor jeg gør af de sidste 28 masker ? Jeg vil så gerne strikke denne trøje, men kan ikke finde ud af det.
29.11.2022 - 19:37DROPS Design answered:
Hej Annette, A1= 7 masker, så du strikker 7+9+7+37+7+9+7+3= 120 masker :)
01.12.2022 - 14:09
Selina wrote:
Guten Abend, Wenn ich alle Zunahmen gemacht habe, soll das Muster weiter geführt werden. Mir ist nicht ganz klar wie das richtig funktionieren soll. Ich habe nach A1 und vor A1 eine Zunahme gemacht, welche ich in A2 eingearbeitet habe. Dadurch entstand das Perlmuster. Jetzt wo ich bei A2 immer mit einer links beginne entsteht ein Rippenmuster. Was mach ich falsch oder anders wie wird es ab hier richtig gestrickt? Danke für die Antwort!
22.11.2022 - 20:42DROPS Design answered:
Liebe Selina, wenn alle Zunahmen fertig sind, stricken Sie genau so wie zuvor, dh A.1 über A.1 und A.2 über A.2, das Rippenmuster stimmt jetzt in der Runde. Viel Spaß beim stricken!
23.11.2022 - 09:04
Eugenia wrote:
Hello! Please, can you tell me where to put thé markers for sleeves, front pièce and back pièce? Thanks you.
15.09.2022 - 23:59DROPS Design answered:
Dear Eugenia, we don't work with markers here, but you can add one on each side of each of the 7 sts worked in A.1 = they are the raglan stitches, that way you will have a better overview of each part and where to increase for the raglan. Happy knitting!
16.09.2022 - 09:44
Desert Mirage#desertmiragesweater |
|||||||
![]() |
![]() |
||||||
Knitted jumper in DROPS Nord with raglan. Piece is knitted top down with broken rib and stripes. Size: S - XXXL
DROPS 232-16 |
|||||||
---------------------------------------------------------- EXPLANATION FOR THE PATTERN: ---------------------------------------------------------- PATTERN: See diagrams A.1 and A.2. STRIPES: * Work 7-7-7-8-8-8 cm with colour light beige, work 3 cm with colour powder pink *, work from *-*. RAGLAN: Increase 1 stitch in each side of 7 stitches (= A.1) in every transition between body and sleeves (= 8 stitches increased on round). Increase 1 stitch by making 1 yarn over. On next round work yarn overs twisted to avoid holes. Then work the new stitches in pattern A.2. DECREASE TIP (applies to sleeves): Decrease 1 stitch on each side of marker thread as follows: Work until 3 stitches remain before marker thread and knit 2 together, knit 2 (marker thread is between these 2 stitches), slip 1 stitch knitwise, knit 1, pass slipped stitch over stitch worked. ---------------------------------------------------------- START THE PIECE HERE: ---------------------------------------------------------- JUMPER - SHORT OVERVIEW OF THE PIECE: Neck edge and yoke are worked in the round on circular needle, top down. Now divide yoke for body and sleeves. Work the body in the round on circular needle. Work sleeves in the round on double pointed needles/a short circular needle. NECK EDGE: Cast on 120-120-128-128-136-136 stitches on circular needle size 2.5 mm with colour light beige in DROPS Nord. Knit 1 round. Then work rib (knit 1/purl 1). Work until rib measures 4 cm. Insert 1 marker after approx. 41-41-44-44-46-46 stitches (approx. mid front). Measure yoke from this marker. Work STRIPES - see explanation above. The 4 cm in the neck edge are not counted with the stripes (i.e. work 11-11-11-12-12-12 cm in total with colour light beige before first stripe with colour powder pink). YOKE: The beginning of round is in transition between back piece and right sleeve. Switch to circular needle size 3 mm, and work as follows: A.1, A.2 over the next 9 stitches, A.1, A.2 over the next 37-37-41-41-45-45 stitches, A.1, A.2 over the next 9 stitches, A.1, A.2 over the next 37-37-41-41-45-45 stitches. Continue this pattern, on next round begin increase for RAGLAN – read explanation above (8 stitches increased). Increase like this every other round 26-32-34-40-44-50 times in total = 328-376-400-448-488-536 stitches. REMEMBER THE KNITTING TENSION! Work without increase until piece measures 21-23-25-27-29-31 cm from marker thread. Now divide yoke for body and sleeves: Work the first 4 stitches (back piece), slip the next 67-79-83-95-103-115 stitches on a thread for sleeve and cast on 9-9-11-11-13-13 new stitches on needle (in the side under sleeve), work the next 97-109-117-129-141-153 stitches (front piece), slip the next 67-79-83-95-103-115 stitches on a thread for sleeve and cast on 9-9-11-11-13-13 new stitches on needle (in the side under sleeve), work the next 93-105-113-125-137-149 stitches (back piece). BODY: = 212-236-256-280-308-332 stitches. Work A.2 in the round. Continue with stripes when 4 stripes have been worked in total with colour powder pink, finish the piece with colour light beige. Work until piece measures 24 cm from division. 4 cm remain until finished measurements. Knit 1 round while increasing 46-50-54-58-64-70 stitches evenly = 258-286-310-338-372-402 stitches. Switch to circular needle size 2.5 mm. Work rib (= knit 1/purl 1). Continue rib like this for 4 cm. Cast off. Jumper measures approx. 52-54-56-58-60-62 cm from shoulder and down. SLEEVE: Slip the 67-79-83-95-103-115 stitches from thread in one side of piece back on a short circular needle/double pointed needles size 3 mm, and pick in addition up 1 stitch in each of the 9-9-11-11-13-13 stitches cast on under sleeve = 76-88-94-106-116-128 stitches. Insert a marker thread in the middle of the new stitches. Work pattern as before and continue with stripes. When 5 stripes have been worked in total with colour powder pink, finish the piece with colour light beige. AT THE SAME TIME when piece measures 3-3-3-2-2-3 cm, decrease 2 stitches under sleeve - READ DECREASE TIP. Decrease like this approx. every 6-3-2½-2-1½-1 cm 6-10-10-14-18-22 times in total = 64-68-74-78-80-84 stitches. Continue until piece measures 35-34-31-31-29-28 cm from division. Switch to double pointed needles size 2.5 mm. Work rib (knit 1/purl 1) for 4 cm. Cast off. Sleeve measures approx. 39-38-35-35-33-32 cm from division. Work the other sleeve the same way. |
|||||||
Diagram explanations |
|||||||
|
|||||||
![]() |
|||||||
Have you finished this pattern?Tag your pictures with #dropspattern #desertmiragesweater or submit them to the #dropsfan gallery. Do you need help with this pattern?You'll find 28 tutorial videos, a Comments/Questions area and more by visiting the pattern on garnstudio.com. © 1982-2025 DROPS Design A/S. We reserve all rights. This document, including all its sub-sections, has copyrights. Read more about what you can do with our patterns at the bottom of each pattern on our site. |
Post a comment to pattern DROPS 232-16
We would love to hear what you have to say about this pattern!
If you want to leave a question, please make sure you select the correct category in the form below, to speed up the answering process. Required fields are marked *.