DROPS Super Sale · SAVE 30% on 5 cosy, wool yarns
DROPS Flora
65% Wool, 35% Alpaca
from 2.60 € /50g
Order
Get the yarn to make this pattern from 15.60€.

The yarn cost is calculated from the pattern’s smallest size and the yarn’s cheapest product type. Looking for an even better price? You might find it on the DROPS Deals!

DROPS Autumn & Winter 26/27

Willow Breeze Sweater

Knitted jumper in DROPS Flora or DROPS Nord. The piece is worked top down with European/diagonal shoulders, moss stitch and cables. Sizes XS - XXXL.

Highlight Size:


DROPS 272-16

#willowbreezesweater

DROPS Design: Pattern fl-111
Yarn group A
-------------------------------------------------------

SIZES:
XS - S - M - L - XL - XXL - XXXL

YARN:
DROPS FLORA from Garnstudio (belongs to yarn group A)
300-350-400-400-450-500-550 g colour 31, Sand

Or use:
DROPS NORD from Garnstudio (belongs to yarn group A)
400-450-450-500-550-600-700 g colour 29, Marzipan

NEEDLES:
DROPS CIRCULAR NEEDLE SIZE 3.5 MM: Length 40 cm and 80 cm.
DROPS CIRCULAR NEEDLE SIZE 2 MM: Length 40 cm and 80 cm.
DROPS DOUBLE POINTED NEEDLES SIZE 3.5 MM.
DROPS DOUBLE POINTED NEEDLES SIZE 2 MM.
DROPS CABLE NEEDLE.
The technique MAGIC LOOP can be used – you then only need 80 cm circular needle in each size.

KNITTING TENSION:
24 stitches in width and 32 rows in height with double moss stitch (=A.1) on needle size 3.5 mm = 10 x 10 cm.
NOTE: Remember, the needle size is only a guide. If you get too many stitches on 10 cm, change to a larger needle size. If you get to few stitches on 10 cm, change to a smaller needle size.

-------------------------------------------------------

Alternative Yarn – See how to change yarns here
Yarn Groups A to F – Use the same pattern and change the yarn here
Yarn usage using an alternative yarn – Use our yarn converter here

-------------------------------------------------------

You might also like...

DROPS Flora
65% Wool, 35% Alpaca
from 2.60 € /50g
Order
Get the yarn to make this pattern from 15.60€.

The yarn cost is calculated from the pattern’s smallest size and the yarn’s cheapest product type. Looking for an even better price? You might find it on the DROPS Deals!

Pattern instructions

0
0

-------------------------------------------------------

EXPLANATIONS FOR THE PATTERN:
-------------------------------------------------------

PATTERN:
See diagrams A.1 to A.4.
The diagrams show the pattern from the right side.

INCREASE TIP-1:
INCREASE 1 STITCH TOWARDS LEFT – from RIGHT SIDE:
Use the left needle to pick up the strand between 2 stitches from the row below, pick up the strand from the front and knit through the stitch-loop that lies on the back of the needle.
INCREASE 1 STITCH TOWARDS THE RIGHT- from RIGHT SIDE:
Use the left needle to pick up the strand between 2 stitches from the row below, pick up the strand from the back and knit through the stitch-loop that lies on the front of the needle.

INCREASE TIP-2:
INCREASE 1 STITCH TOWARDS THE RIGHT- from WRONG SIDE:
Use the left needle to pick up the strand between 2 stitches from the row below, pick up the strand from the back and purl through the stitch-loop that lies on the front of the needle.
INCREASE 1 STITCH TOWARDS LEFT – from WRONG SIDE:
Use the left needle to pick up the strand between 2 stitches from the row below, pick up the strand from the front and purl through the stitch-loop that lies on the back of the needle.

KNITTING TIP:
When working short rows, there will be a small hole after each turn. This hole can be closed by tightening the strand or using the technique German Short Rows as follows:
Slip the first stitch purl-wise, take the strand over the right needle and tighten well from the back (2 loops on the needle). These loops are worked together on the next row.

DECREASE TIP:
Decrease 2 stitches mid-under the sleeve by knitting 3 together, adjusting so the decrease fits the pattern and follows the marker-thread approx. mid-under the sleeve. Note: When working the moss stitch in the round, it is natural for the pattern to twist slightly as you work.

-------------------------------------------------------

START THE PIECE HERE:

-------------------------------------------------------

JUMPER – SHORT OVERVIEW OF THE PIECE:
The pattern uses both long and short needles; start with the length which fits the number of stitches and change when necessary.
The piece is started back and forth, with cables only worked on the front piece. Begin by casting on stitches at the back of the neck and working the back piece top down, while increasing stitches on each side for the shoulders, which become slightly diagonal. The back piece is worked as far as the armholes.
The front piece is then worked in 2 sections, knitting up stitches along 1 back shoulder, working pattern and increasing for the neckline. This is repeated on the other shoulder. The 2 front sections are joined when the neckline is finished and worked as far as the armholes.
The front and back pieces are joined on the same circular needle and the body worked in the round.
Stitches are knitted up around the armholes for the sleeves, which are started back and forth for the sleeve cap, then finished in the round. Stitches are knitted up around the neckline and the neck is worked in the round to finish.

BACK PIECE:
The piece is worked back and forth.
Cast on 41-43-43-45-45-45-47 stitches with circular needle size 3.5 mm and DROPS Flora or DROPS Nord.
ROW 1 (wrong side): Purl.
ROW 2 (right side): Read INCREASE TIP-1. Knit 1, increase 1 stitch towards the left, work A.1 (double moss stitch) until there is 1 stitch left on the row, increase 1 stitch towards the right, knit 1. The increased stitches are worked into the pattern on the next row.
ROW 3 (wrong side): Read INCREASE TIP-2. Purl 1, increase 1 stitch towards the right, continue the double moss stitch until there is 1 stitch left on the row, increase 1 stitch towards the left, purl 1.
Work ROWS 2 and 3 a total of 15-15-16-17-18-19-20 times (30-30-32-34-36-38-40 rows worked). After the last increase there are 101-103-107-113-117-121-127 stitches.
Insert 1 marker outermost on one side; the piece is now measured from here.
Continue double moss stitch with 1 edge-stitch in stocking stitch on each side until the piece measures 10-9-9-8-8-7-6 cm from the marker, measured down the armhole - remember to maintain the knitting tension. Now increase in each side for the armholes.

INCREASE FOR ARMHOLES:
ROW 1 (right side): Remember INCREASE TIP-1. Knit 1, increase 1 stitch towards the left, continue double moss stitch until there is 1 stitch left, increase 1 stitch towards the right, knit 1.
ROW 2 (wrong side): Continue double moss stitch as before; the increased stitches are worked into the pattern.
Work ROWS 1 and 2 a total of 5-8-10-11-13-16-19 times (10-16-20-22-26-32-38 rows worked) = 111-119-127-135-143-153-165 stitches.
Continue working until the piece measures 13-14-15-15-16-17-18 cm, from the marker, measures down the armhole, and finishing after a row from the wrong side. Cut the strand and place the stitches on a stitch holder. Now work the left front piece along the left back shoulder as follows.

LEFT FRONT PIECE:
Find the left back shoulder as follows: Lay the back piece flat, right side up, with the stitch holder/thread towards you; left side of piece = left shoulder.
Start from the right side by the neck on the left back shoulder and knit up 1 stitch in each row worked, inside the outermost stocking stitch, as far as the armhole = 30-30-32-34-36-38-40 shoulder-stitches.
All measurements on the front piece are taken from this knitted-up row.
Purl 1 row from the wrong side and AT THE SAME TIME increase 4-5-5-6-6-6-7 stitches evenly on the row by working yarn overs = 34-35-37-40-42-44-47 stitches. On the next row knit/purl the yarn overs twisted to avoid holes. AT THE SAME TIME, work as follows:
ROW 1 (right side): Work A.2 (12 stitches), A.3 (16 stitches), work 5-6-8-11-13-15-18 stitches of A.1 (double moss stitch), knit 1.
ROW 2 (wrong side): Knit above knit and purl above purl.
Work ROWS 1. and 2 until the piece measures 7-8-8-9-10-11-12 cm from the knitted-up row, with the last row from the wrong side. Make a note of this row in A.3 so it is matched when working the right shoulder.

Continue as follows, increasing for the neckline:
ROW 1 (right side):
Work A.2, A.3, then 5-6-8-11-13-15-18 stitches of double moss stitch as before, knit 1.
ROW 2 (wrong side):
Knit above knit and purl above purl, cast on 1 stitch at the end of the row.
ROW 3 (right side):
Purl 1, work A.2, A.3, 5-6-8-11-13-15-18 stitches double moss stitch as before, knit 1.
ROW 4 (wrong side):
Knit above knit and purl above purl, cast on 2 stitches at the end of the row.
ROW 5 (right side):
Knit 1, purl 2, work A.2, A.3, 5-6-8-11-13-15-18 stitches double moss stitch as before, knit 1.
ROW 6 (wrong side):
Knit above knit and purl above purl, cast on 3 stitches at the end of the row.
ROW 7 (right side):
Purl 2, knit 2, purl 2, work A.2, A.3, 5-6-8-11-13-15-18 stitches double moss stitch as before, knit 1.
ROW 8 (wrong side):
Knit above knit and purl above purl, cast on 4 stitches at the end of the row.
ROW 9 (right side):
Knit 4, purl 2, knit 2, purl 2, work A.2, A.3, 5-6-8-11-13-15-18 stitches double moss stitch as before, knit 1.
ROW 10 (wrong side):
Knit above knit and purl above purl, cast on 6 stitches at the end of the row = 50-51-53-56-58-60-63 stitches.
Cut the strand and place the stitches on a stitch holder. Now work the right front piece along the right back shoulder as follows.

RIGHT FRONT PIECE:
Start from the right side by the armhole on the right back shoulder and knit up 1 stitch in each row worked, inside the outermost stitch (i.e. inside the stocking stitch) as far as the neck = 30-30-32-34-36-38-40 shoulder-stitches.
All measurements on the front piece are taken from this knitted-up row.
Purl 1 row from the wrong side and increase at the same time 4-5-5-6-6-6-7 stitches evenly on the row by working yarn overs = 34-35-37-40-42-44-47 stitches. On the next row knit/purl the yarn overs twisted to avoid holes. AT THE SAME TIME, work as follows:
ROW 1 (right side): Knit 1, work 5-6-8-11-13-15-18 stitches of A.1 (double moss stitch), work A.3 (16 stitches), A.2 (12 stitches).
ROW 2 (wrong side): Knit above knit and purl above purl.
Work ROWS 1 and 2 until the piece measures 7-8-8-9-10-11-12 cm from the knitted-up row, with the last row from the wrong side (this is the same row in A.3 as on the left front piece, before increasing for the neckline).

Now increase for the neckline:
ROW 1 (right side):
Knit 1, work 5-6-8-11-13-15-18 stitches double moss stitch as before, A.3, A.2, and cast on 1 stitch at the end of the row.
ROW 2 (wrong side):
Knit 1 then knit above knit and purl above purl.
ROW 3 (right side):
Knit 1, work 5-6-8-11-13-15-18 stitches double moss stitch as before, A.3, A.2, purl 1, cast on 2 stitches at the end of the row.
ROW 4 (wrong side):
Purl 1, knit 2, then knit above knit and purl above purl.
ROW 5 (right side):
Knit 1, work 5-6-8-11-13-15-18 stitches double moss stitch as before, A.3, A.2, purl 2, knit 1, cast on 3 stitches at the end of the row.
ROW 6 (wrong side):
Knit 2, purl 2, knit 2, then knit above knit and purl above purl.
ROW 7 (right side):
Knit 1, work, 5-6-8-11-13-15-18 stitches double moss stitch as before, A.3, A.2, purl 2, knit 2, purl 2, cast on 4 stitches at the end of the row.
ROW 8 (wrong side):
Purl 4, knit 2, purl 2, knit 2, then knit above knit and purl above purl.
ROW 9 (right side):
Knit 1, work 5-6-8-11-13-15-18 stitches double moss stitch as before, A.3, A.2, purl 2, knit 2, purl 2, knit 4, cast on 6 stitches at the end of the row.
ROW 10 (wrong side):
Knit 2, purl 2, knit 2, purl 4, knit 2, purl 2, knit 2, then knit above knit and purl above purl = 50-51-53-56-58-60-63 stitches.
Now join the 2 front pieces.

FRONT PIECE (right and left front pieces joined):
From the right side: NOTE! Continue A.2. and A.3 working the same rows in the diagrams on both front pieces:
Work the 50-51-53-56-58-60-63 stitches on the right front piece as follows:
Knit 1, work 5-6-8-11-13-15-18 stitches double moss stitch as before, then A.3, A.2, A.3, cast on 24 new stitches for the neckline, work the 50-51-53-56-58-60-63 stitches on the left front piece as follows:
A.3, A.2, A.3, work 5-6-8-11-13-15-18 stitches double moss stitch as before, knit 1 = 124-126-130-136-140-144-150 stitches.

The 24 cast-on stitches for the neckline are worked according to A.4; A.3 and A.4 are the same height. Begin A.4 on the same row as A.3 so the cables are worked on the same row. Work as follows:
Knit 1, work 5-6-8-11-13-15-18 stitches double moss stitch as before, A.3, A.2, A.3, A.4, A.3, A.2, A.3, work 5-6-8-11-13-15-18 stitches double moss stitch as before, knit 1.
From the wrong side continue the pattern with knit above knit and purl above purl.
Continue the pattern and double moss stitch until the piece measures 26-25-25-26-26-25-24 cm. Now increase for the armholes.

INCREASE FOR ARMHOLES:
ROW 1 (right side): Remember INCREASE TIP-1. Knit 1, increase 1 stitch towards the left, continue the pattern until there is 1 stitch left, increase 1 stitch towards the right, knit 1.
ROW 2 (wrong side): Knit above knit and purl above purl; the increased stitches are worked in double moss stitch.
Work ROWS 1 and 2 a total of 5-8-10-11-13-16-19 times (10-16-20-22-26-32-38 rows worked) = 134-142-150-158-166-176-188 stitches.
Continue working until the piece measures 29-30-31-33-34-35-36 cm, finishing after a row from the wrong side. Cut the strand.
The front and back pieces are now joined for the body. The front piece is longer than the back piece as approx. 3 cm of the neck-depth lies on the back piece.

BODY:
So the pattern continues correctly and symmetrically, work as follows:
Start from the right side on the front piece and move the first 11-15-19-23-27-32-38 stitches on the front piece from the left needle onto the right needle without working them (i.e., the stitches before the cable pattern), insert 1 marker here (beginning of the round). Then work as follows:
Work across the rest of the front piece as before, cast on 4-6-8-10-14-18-20 stitches (mid-under the sleeve), work the 111-119-127-135-143-153-165 stitches on the back piece as before, cast on 4-6-8-10-14-18-20 stitches (mid-under the sleeve), work to the end of the round = 253-273-293-313-337-365-393 stitches.
Continue pattern and double moss stitch in the round. The new stitches under each sleeve and the edge-stitches are worked in double moss stitch (A.1). Make sure the pattern fits under the sleeves. If it does not fit, you can decrease 1 stitch by knitting 2 together so the pattern continues neatly around the body.
Work until the piece measures 45-47-49-51-52-54-56 cm from the cast-on edge mid-back, adjust so that the last round is worked without cables.
Change to circular needle size 2.5 mm. Work rib (knit 1 and purl 1), AT THE SAME TIME increase 79-85-93-101-111-125-137 stitches evenly on the first round = 332-358-386-414-448-490-530 stitches. When the rib measures 4-4-4-4-5-5-5 cm, cast off with rib.
The jumper measures approx. 49-51-53-55-57-59-61 cm from mid-back and 52-54-56-58-60-62-64 cm from top of shoulder.

SLEEVES:
The sleeve is worked top down.
Lay the piece flat and insert 1 marker at the top of the armhole. NOTE: This is not where stitches were knitted up for the front piece but a few cms down the front piece.
Use circular needle size 3.5 mm and knit up tightly or use a smaller needle size.
KNIT UP STITCHES AS FOLLOWS:
Start in the middle of the cast-on stitches under the sleeve and knit up 100-106-112-120-128-136-142 stitches around the armhole, with equal numbers of stitches on both sides of the marker.
SLEEVE CAP:
Work A.1 (double moss stitch) back and forth with short rows for the sleeve cap (to give the sleeve a better fit), starting from mid-under the sleeve as follows:
ROW 1 (right side): Work to 5 stitches past the marker on top of the sleeve, turn – read KNITTING TIP.
ROW 2 (wrong side): Work to 5 stitches past the marker (i.e., work 10 stitches), turn.
ROW 3 (right side): Work to 3-3-3-2-2-2-2 stitches past the previous turn, turn.
ROW 4 (wrong side): Work to 3-3-3-2-2-2-2 stitches past the previous turn, turn.
Repeat ROWS 3 and 4 until you have turned a total of 22-26-28-32-38-44-52 times (11-13-14-16-19-22-26 times each side, with the last row from the wrong side).

AFTER THE LAST TURN:
After the last time you work row 4, turn and knit back to the beginning of the round (mid-under the sleeve).
Insert 1 marker-thread here; it is used when decreasing under the sleeve.
SLEEVE CONTINUED:
Continue A.1 (double moss stitch) in the round. AT THE SAME TIME after the first round, decrease mid-under the sleeve – read DECREASE TIP as follows: Decrease 2 stitches every 2nd round 4-5-6-7-8-9-10 times, then decrease 2 stitches 12-13-14-16-18-20-21 times every 3-2½-2-2-1½-1-1 cm = 68-70-72-74-76-78-80 stitches.
Continue working until the sleeve measures 49-49-49-49-48-48-48 cm from the shoulder and 42-41-40-39-36-34-32 cm from the join.

Change to double pointed needles size 2 mm. Work rib (knit 1 and purl 1), AT THE SAME TIME increase 28-30-32-32-34-36-36 stitches evenly on the first round = 96-100-104-106-110-114-116 stitches.
When the rib measures 4-4-4-4-5-5-5 cm, cast off with rib. The sleeve measures approx. 53 cm from the shoulder in all sizes.

NECK:
Use circular needle size 2 mm. Start from the right side on one shoulder-line and knit up 138-148-148-158-162-166-176 stitches inside 1 stitch around the neckline; the stitch count should be divisible by 2. Purl 1 round, then knit 1 round. Work rib in the round (knit 1 and purl 1) for 3½-3½-4-4-4-4½-4½ cm.
Cast off with picot as follows:
* Slip the next stitch (knitted stitch) from the left to the right needle without twisting it. Lay the strand between the needles and in front of the piece, slip the 2 last stitches on the right needle back onto the left needle without twisting them. Take the strand in front and round these 2 stitches so the strand is now at the back.
Knit the 2 stitches together, then knit/purl 1 (= same as stitch below). On the right needle, pass stitch-2 over stitch-1 (1 stitch decreased) *
Work from *-* until all stitches are cast off.

This pattern has been corrected.

Updated online: 11.09.2026
Diagrams have been updated.

Diagram

knit from right side, purl from wrong side = knit from right side, purl from wrong side
purl from right side, knit from wrong side = purl from right side, knit from wrong side
place 1 stitch on cable needle behind the piece, knit 1, knit 1 from cable needle = place 1 stitch on cable needle behind the piece, knit 1, knit 1 from cable needle
place 2 stitches on cable needle behind the piece, knit 2, knit 2 from cable needle = place 2 stitches on cable needle behind the piece, knit 2, knit 2 from cable needle
place 2 stitches on cable needle in front of piece, knit 2, knit 2 from cable needle = place 2 stitches on cable needle in front of piece, knit 2, knit 2 from cable needle
place 1 stitch on cable needle behind the piece, knit 2, purl 1 from cable needle = place 1 stitch on cable needle behind the piece, knit 2, purl 1 from cable needle
place 2 stitches on cable needle in front of piece, purl 1, knit 2 from cable needle = place 2 stitches on cable needle in front of piece, purl 1, knit 2 from cable needle
Diagram for DROPS 272-16
Diagram for DROPS 272-16

Each of our patterns has specific tutorial videos to help you.

Do you have a question? See a list of frequently asked questions (FAQ)

Knitting tension is what determines the final measurements of your work, and is usually measured per 10 x 10 cm. It is provided like so: number of stitches in width x number of rows in height - eg: 19 stitches x 26 rows = 10 x 10 cm.

The knitting tension is very individual; some people knit/crochet loosely while others work tightly. You adjust the knitting tension with the needle size, which is why the suggested needle size is only meant as a guide! You need to adjust this (up or down) to ensure that YOUR knitting tension matches the knitting tension provided in the pattern. If you work with a different knitting tension than provided you will have a different yarn consumption, and your work will have different measurements than what the pattern suggests.

The knitting tension also determines which yarns can replace each other. As long as you achieve the same knitting tension you can replace one yarn with another.

See DROPS lesson: How to measure your tension/gauge

See DROPS video: How to make a gauge tension swatch

The required amount of yarn is provided in grams, eg: 450 g. To calculate how many balls you’ll need you first need to know how many grams are in 1 ball (25g, 50g or 100g). This information is available if you click on the individual yarn quality on our pages. Divide the amount required with the amount of each ball. For example, if each ball is 50g (the most common amount), the calculation will be as follows: 450 / 50 = 9 balls.

The important thing when changing from one yarn to another is that the knitting/crochet tension remains the same. This is so that the measurements of the finished piece will be the same as on the sketch provided. It is easier to achieve the same knitting tension using yarns from the same yarn group. It is also possible to work with multiple strands of a thinner yarn to achieve the knitting tension of a thicker one. Please try our yarn converter. We recommend you to always work a test swatch.

Please NOTE: when changing yarn the garment might have a different look and feel to the garment in the photo, due to individual properties and qualities of each yarn.

See DROPS lesson: Can I use a different yarn than the one mentioned in the pattern?

All our yarns are categorised into yarn groups (from A to F) according to thickness and knitting tension – group A contains the thinnest yarns and group F the thickest. This makes it easier for you to find alternative yarns to our patterns, should you wish to switch yarn. All yarns within the same group have a similar knitting tension and can easily replace each other. However, different yarn qualities have different structures and properties which will give the finished work a unique look and feel.

Click here for an overview of the yarns in each yarn group

At the top of all our patterns you’ll find a link to our yarn calculator, which is a helpful tool should you wish to use a different yarn than suggested. By filling in the yarn quality you wish to replace, the amount (in your size) and number of strands, the calculator will present good alternative yarns with the same knitting tension. Additionally it will tell you how much you’ll require in the new qualities and whether you’ll need to work with multiple strands. Most skeins are 50g (some are 25g or 100g).

If the pattern is worked with multiple colours, every colour will have to be calculated separately. Similarly, if the pattern is worked with several strands of different yarns (for example 1 strand Alpaca and 1 strand Kid-Silk) you will have to find alternatives for each, individually.

Click here to see our yarn calculator

Since different yarns have different qualities and textures we have chosen to keep the original yarn in our patterns. However, you can easily find options among our available qualities by using our yarn calculator, or simply pick a yarn from the same yarn group.

It is possible that some retailers still have discontinued yarns in stock, or that someone has a few skeins at home that they would like to find patterns for.

The yarn calculator will provide both alternative yarn as well as required amount in the new quality.

If you think it's hard to decide what size to make, it can be a good idea to measure a garment you own already and like the size of. Then you can pick the size by comparing those measures with the ones available in the pattern's size chart.

You'll find the size chart at the bottom of the pattern.

See DROPS lesson: How to read size chart

The needle size provided in the pattern serves only as a guide, the important thing is to follow the knitting tension. And since knitting tension is very individual, you will have to adjust the needle size to ensure that YOUR tension is the same as in the pattern – maybe you’ll have to adjust 1, or even 2 needle sizes, up or down to achieve the correct tension. For this, we recommend that you work test swatches.

Should you work with a different knitting tension than the one provided, the measurements of the finished garment might deviate from the measurement sketch.

See DROPS lesson: How to measure your tension/gauge

See DROPS video: How to make a tension/gauge swatch

Working a garment top-down provides more flexibility and room for personal adjustment. For example it is easier to try the garment on while working, as well as making adjustments to length of yoke and shoulder caps.

The instructions are carefully explaining every step, in the correct order. Diagrams are adjusted to the knitting direction and are worked as usual.

The diagram depicts all rows/rounds, and every stitch seen from the right side. It is read from bottom to top, from right to left. 1 square = 1 stitch.

When working back and forth, every other row is worked from the right side and every other row is worked from the wrong side. When working from the wrong side, the diagram will have to be worked reversed: from left to right, knit stitches are purled, purl stitches are knit etc.

When working in the round every round is worked from the right side and the diagram are worked from right to left on all rounds.

See DROPS lesson: How to read knitting diagrams

The diagram depicts all rows/rounds, and every stitch seen from the right side. It is worked from bottom to top, from right to left.

When working back and forth every other row is worked from the right side: from right to left and every other row is worked from the wrong side: from left to right.

When working in the round, every row in the diagram are worked from the right side, from right to left.

When working a circular diagram you start in the middle and work your way outwards, counter clockwise, row by row.

The rows usually start with a given number of chain stitches (equivalent to the height of the following stitch), this will either be depicted in the diagram or explained in the pattern.

See DROPS lesson: How to read crochet diagrams

Instructions for working several diagrams after each other on the same row/round, will often be written like so: “work A.1, A.2, A.3 a total of 0-0-2-3-4 times". This means you work A.1 once, then A.2 is worked once, and A.3 is repeated (in width) the number of times provided for your size – in this case like so: S = 0 times, M = 0 times, L=2 times, XL= 3 times and XXL = 4 times.

The diagrams are worked as usual: begin with the first row in A.1, then work the first row in A.2 etc.

See DROPS lesson: How to read knitting diagrams

See DROPS lesson: How to read crochet diagrams

The total width of the garment (from wrist-to-wrist) will be larger in the larger sizes, despite the actual sleeves being shorter. The larger sizes have longer sleeve caps and wider shoulders, so there will be a good fit in all sizes.

The measurement sketch/schematic drawing provides information regarding the full length of the garment. If it’s a jumper or a jacket the length is measured from the highest point on the shoulder closest to the neckline, and straight down to the bottom of the garment. It is NOT measured from the tip of shoulder. Similarly, the length of yoke is measured from the highest point on the shoulder and down to where yoke is split into body and sleeves.

On a jacket measures are never taken along bands, unless specifically stated. Always measure inside band stitches when measuring the length.

See DROPS lesson: How to read a schematic drawing

Diagrams are often repeated on the round or in height. 1 repeat is the diagram the way it appears in the pattern. If it says to work 5 repeats of A.1 in the round, then you work A.1 a total of 5 times after/next to each other in the round. If it says to work 2 repeats of A.1 vertically/in height you work the entire diagram once, then begin again at the start and work the entire diagram one more time.

Chain stitches are slightly narrower than other stitches and to avoid working the cast-on edge too tight, we simply chain more stitches to begin with. The stitch count will be adjusted on the following row to fit the pattern and measurement sketch.

The rib edge is more elastic and will contract slightly compared to, for example, stocking stitch. By increasing before the rib edge, you avoid a visible difference in width between the rib edge and the rest of the body.

It’s very easy to cast off too tightly, and by making yarn overs while casting off (and simultaneously casting these off) you avoid a too tight cast off edge.

See DROPS video: How to bind off with yarn overs (yo)

To achieve an even increase (or decrease) you can increase on, for example: every 3rd and 4th row alternately, like so: work 2 rows and increase on the 3rd row, work 3 rows and increase on the 4th. Repeat this until the increase is complete.

See DROPS lesson: Increase or decrease 1 st on every 3rd and 4th row alternately

Should you prefer to work in the round instead of back and forth, you may of course adjust the pattern. You’ll need to add steeks mid-front (usually 5 stitches), and follow the instructions. When you would normally turn and work from the wrong side, simply work across the steek and continue in the round. At the end you’ll cut the piece open, pick up stitches to work bands, and cover the cut edges.

See DROPS video: How to knit steeks and cut open

Should you prefer to work back and forth instead of in the round, you may of course adjust the pattern so you work the pieces separately and then assemble them at the end. Divide the stitches for the body in 2, add 1 edge stitch in each side (for sewing) and work the front and back pieces separately.

See DROPS lesson: Can I adapt a pattern for circular needles into straight needles?

Pattern repeats can vary slightly in the different sizes, in order to get the correct proportions. If you’re not working the exact same size as the garment in the photo, yours might deviate slightly. This has been carefully developed and adjusted so that the complete impression of the garment is the same in all sizes.

Make sure to follow instructions and diagrams for your size!

If you have found a pattern you like which is available in women’s size it’s not very difficult to convert it to men’s size. The biggest difference will be the length of sleeves and body. Start working on the women size that you think would fit across the chest. The additional length will be worked right before you cast off for the armhole/sleeve cap. If the pattern is worked top-down you can add the length right after the armhole or before the first decrease on sleeve.

Regarding additional yarn amount, this will depend on how much length you add, but it is better with a skein too many than too few.

All yarns will have excess fibres (from production) that might come off as lint or shedding. Brushed yarns (ie hairier yarns) have more of these loose, excess fibres, causing more shedding.

Shedding also depends on what is worn under or over the garment, and whether this pulls at the yarn fibres. It’s therefore not possible to guarantee that there will be no shedding

Below are some tips on how to get the best result when working with hairier yarns:

1. When the garment is finished (before you wash it) shake it vigorously so the looser hairs come off. NOTE: do NOT use a lint roller, brush or any method that pulls at the yarn.

2. Place the garment in a plastic bag and put it in your freezer - the temperature will cause the fibres to become less attached to each other, and excess fibres will come off easier.

3. Leave in the freezer for a few hours before taking it out and shaking it again.

4. Wash the garment according to the instructions on the yarn label.

Pilling is a natural process that happens to even the most exclusive of fibers. It's a natural sign of wear and tear that is hard to avoid, and that is most visible in high friction areas of your garment like a sweater's arms and cuffs.

You can make your garment look as new by removing the pilling, using a fabric comb or a pill/lint remover.

Still can't find the answer you need? Then scroll down and leave your question so one of our experts can try to help you. This will be done normally within 5 to 10 working days.
In the meantime, you can read the questions and answers that others have left to this pattern or join the DROPS Workshop on Facebook to get help from fellow knitters/crocheters!
Have you finished this pattern?
Tag your pictures with #dropspattern #willowbreezesweater or submit them to the #dropsfan gallery.

Post a comment to pattern DROPS 272-16

We would love to hear what you have to say about this pattern!

If you want to leave a question, please make sure you select the correct category in the form below, to speed up the answering process. Required fields are marked *.

Comments / Questions (3)

country flag Inge-Lise Hvid wrote:

Der er fejl i diagrammet. Der står at der er 12 masker i diagram A2, men der er kun 10, og i diagram A4 står der at der er 24 masker, men der er kun 22, så maskeantallet i opskriften passer ikke med antal masker i disse diagrammer.

21.09.2026 - 23:04

DROPS Design answered:

Hei Inger-Lise, Jeg har sjekket diagrammene og A.2 er over 12 masker og A.4 24 masker i både den norske og danske versjonen. Hilsen Drops Team

22.09.2026 - 07:15

country flag Inger Svensson wrote:

Undrar om det inte är fel i diagrammet? A2 är 10 maskor (rutor) men 12 maskor enl beskrivningen och A4 är 22 maskor men beskrivningen säger 24??? Och visar diagrammet bara räta varv eller visar det även aviga varv? T ex A2 är det 16 eller 32 varv?

07.09.2026 - 09:10

DROPS Design answered:

Hei Inger. Oppskriften er oversendt til Design avd. for en dobbeltsjekk. mvh DROPS Design

10.09.2026 - 14:19

country flag Muskan wrote:

Love the pattern❤

02.09.2026 - 08:38