DROPS Super Sale · SAVE 30% on 5 cosy, wool yarns
DROPS Melody
71% Alpaca, 25% Wool, 4% Polyamide
from 26.00 RON /50g
DROPS Fabel
75% Wool, 25% Polyamide
from 13.00 RON /50g
Get the yarn to make this pattern from 208.00RON.

The yarn cost is calculated from the pattern’s smallest size and the yarn’s cheapest product type. Looking for an even better price? You might find it on the DROPS Deals!

DROPS Autumn & Winter 26/27

Misty Sunrise Jacket

Knitted jacket in 1 strand DROPS Melody and 1 strand DROPS Fabel. The piece is worked top down in stocking stitch with European shoulders, trumpet sleeves, I-cord and belt. Sizes XS – XXXL.

Highlight Size:


DROPS 271-30

#mistysunrisejacket

DROPS Design: Pattern fa-585
Yarn group D + A
-------------------------------------------------------

SIZES:
XS - S - M - L - XL - XXL - XXXL

YARN:
DROPS MELODY from Garnstudio (belongs to yarn group D)
300-350-350-400-450-450-500 g colour 03, Pearl Grey
And use:
DROPS FABEL from Garnstudio (belongs to yarn group A)
200-250-250-250-300-350-350 g colour 929, Twilight Dreams

NEEDLES:
DROPS CIRCULAR NEEDLE SIZE 7 MM: Length 40 cm and 80 cm.
DROPS CIRCULAR NEEDLE SIZE 5.5 MM: Length 80 cm.
DROPS DOUBLE POINTED NEEDLES SIZE 7 MM.
DROPS DOUBLE POINTED NEEDLES SIZE 5.5 MM.
The technique MAGIC LOOP can be used – you then only need 80 cm circular needle in each size.

KNITTING TENSION:
12 stitches in width and 15 rows in height with stocking stitch, 1 strand DROPS Melody and 1 strand DROPS Fabel on needle size 7 mm = 10 x 10 cm.
REMEMBER: The needle size is only a guide. If you get too many stitches on 10 cm, change to a larger needle size. If you get too few stitches on 10 cm, change to a smaller needle size.

-------------------------------------------------------

Alternative Yarn – See how to change yarns here
Yarn Groups A to F – Use the same pattern and change the yarn here
Yarn usage using an alternative yarn – Use our yarn converter here

-------------------------------------------------------

You might also like...

DROPS Melody
71% Alpaca, 25% Wool, 4% Polyamide
from 26.00 RON /50g
DROPS Fabel
75% Wool, 25% Polyamide
from 13.00 RON /50g
Get the yarn to make this pattern from 208.00RON.

The yarn cost is calculated from the pattern’s smallest size and the yarn’s cheapest product type. Looking for an even better price? You might find it on the DROPS Deals!

Pattern instructions

0
0

-------------------------------------------------------

EXPLANATIONS FOR THE PATTERN:

-------------------------------------------------------

INCREASE TIP-1:
INCREASE 1 STITCH TOWARDS LEFT – from RIGHT SIDE:
Use the left needle to pick up the strand between 2 stitches from the row below, pick up the strand from the front and knit through the stitch-loop that lies on the back of the needle.
INCREASE 1 STITCH TOWARDS THE RIGHT- from RIGHT SIDE:
Use the left needle to pick up the strand between 2 stitches from the row below, pick up the strand from the back and knit through the stitch-loop that lies on the front of the needle.

INCREASE TIP-2:
INCREASE 1 STITCH TOWARDS THE RIGHT- from WRONG SIDE:
Use the left needle to pick up the strand between 2 stitches from the row below, pick up the strand from the back and purl through the stitch-loop that lies on the front of the needle.
INCREASE 1 STITCH TOWARDS LEFT – from WRONG SIDE:
Use the left needle to pick up the strand between 2 stitches from the row below, pick up the strand from the front and purl through the stitch-loop that lies on the back of the needle.

INCREASE TIP-3:
Increase 1 stitch by making 1 yarn over which is knitted twisted on the next round to avoid a hole.

KNITTING TIP:
When working short rows, there will be a small hole after each turn. This hole can be closed by tightening the strand or using the technique German Short Rows as follows:
Slip the first stitch purl-wise with the strand in front, take the strand over the right needle and tighten well from the back (2 loops on the needle). These loops are worked together on the next row.

DECREASE TIP:
Decrease 1 stitch on each side of the marker-thread as follows:
Work until there are 3 stitches left before the marker-thread, knit 2 together, knit 2 (marker-thread sits between these 2 stitches), slip 1 stitch knit-wise, knit 1 and pass the slipped stitch over the knitted stitch (2 stitches decreased).

-------------------------------------------------------

START THE PIECE HERE:

-------------------------------------------------------

JACKET – SHORT OVERVIEW OF THE PIECE:
The pattern uses both long and short needles; start with the length which fits the number of stitches and change when necessary.
The 2 bands are worked first (back of neck), then stitches are knitted up along the band and the back piece is worked top down while increasing stitches on each side for the shoulders, until the correct stitch count is achieved. The back piece has slightly diagonal shoulders It is continued as far as the armholes.
The front pieces are worked by knitting up stitches along one back shoulder, with the band-stitches placed on the same needle, and working top down to the armholes while increasing for the neckline. This is repeated on the other shoulder.
After the armholes, the front and back pieces are joined and the body is continued back and forth.
Stitches are knitted up around the armholes for the sleeves, which are started back and forth for the sleeve cap, then finished in the round. The belt is worked to finish.

RIGHT BAND:
Cast on 13-13-13-15-15-17-17 stitches with circular needle size 7 mm, 1 strand DROPS Melody and 1 strand DROPS Fabel (2 strands).
Work as follows:
ROW 1 (wrong side): Slip 1 stitch purl-wise with the strand in front, knit 1, slip 1 stitch purl-wise with the strand in front, knit 10-10-10-12-12-14-14, turn – read KNITTING TIP.
ROW 2 (right side): Knit 5-5-5-6-6-7-7, turn.
ROW 3 (wrong side): Knit 5-5-5-6-6-7-7, turn.
ROW 4 (right side): Knit 9-9-9-11-11-13-13, purl 1, knit 1, slip 1 stitch purl-wise with the strand in front, knit 1, turn.
Work ROWS 1 to 4 until the band measures 6½-6½-6½-7½-7½-7½-7½ cm, on the shorter side; finish after a row from the wrong side. AT THE SAME TIME on the last row, decrease 1 stitch by knitting together the 2 last stitches on the row = 12-12-12-14-14-16-16 band-stitches. Place the stitches on a stitch holder.

LEFT BAND:
Use circular needle size 7 mm and knit up 1 stitch in each of the 13-13-13-15-15-17-17 cast-on stitches on the right band, making sure to knit up carefully so the stitches are aligned.
ROW 1 (wrong side): Knit 9-9-9-11-11-13-13, purl 1, knit 1, slip 1 stitch purl-wise with the strand in front, knit 1, turn – remember KNITTING TIP.
ROW 2 (right side): Slip 1 stitch purl-wise with the strand in front, knit 1, slip 1 stitch purl-wise with the strand in front, knit 10-10-10-12-12-14-14, turn.
ROW 3 (wrong side): Knit 5-5-5-6-6-7-7, turn.
ROW 4 (right side): Knit 5-5-5-6-6-7-7, turn.
Work ROWS 1 to 4 until the band measures 6½-6½-6½-7½-7½-7½-7½ cm, on the shorter side, finishing after a row from the wrong side. AT THE SAME TIME on the last row, decrease 1 stitch by knitting together the 2 first stitches on the row = 12-12-12-14-14-16-16 band-stitches. Place the stitches on a stitch holder. The band measures a total of 13-13-13-15-15-15-15 cm.
Stitches are now knitted up for the back piece along the edge of the band.

BACK PIECE:
The piece is worked back and forth. Use circular needle size 7 mm, 1 strand DROPS Melody and 1 strand DROPS Fabel (2 strands). Knit up 18-18-18-20-20-20-20 stitches along the garter-stitch edge on the band, working from the right side and inside 1 stitch. Make sure you have equal numbers of stitches on each side of the seam mid-back (do not work across the 12-12-12-14-14-16-16 stitches on the holders).
ROW 1 (wrong side): Purl.
ROW 2 (right side): Read INCREASE TIP-1. Knit 2, increase 1 stitch towards the left, knit until there are 2 stitches left on the row, increase 1 stitch towards the right, knit 2.
ROW 3 (wrong side): Read INCREASE TIP-2. Purl 2, increase 1 stitch towards the right, purl until there are 2 stitches left on the row, increase 1 stitch towards the left, purl 2.
AFTER ROW 3:
Work ROWS 2 and 3 a total of 9-10-10-11-11-12-13 times (18-20-20-22-22-24-26 rows worked) = 54-58-58-64-64-68-72 stitches.
Insert 1 marker outermost on one side; the piece is now measured from here!
Continue with stocking stitch – remember to maintain the knitting tension - until the piece measures 10-11-8-10-9-7-7 cm from the marker and down the armhole. Now increase for the armholes.

INCREASE FOR ARMHOLES:
ROW 1 (right side): Remember INCREASE TIP-1. Knit 4, increase 1 stitch towards the left, knit until there are 4 stitches left on the row, increase 1 stitch towards the right, knit 4.
ROW 2 (wrong side): Purl.
Work ROWS 1 and 2 a total of 1-1-3-2-4-5-6 times (2-2-6-4-8-10-12 rows worked) = 56-60-64-68-72-78-84 stitches.
Continue working until the piece measures 11-12-12-13-14-14-15 cm, from the marker and down the armhole, finishing after a row from the right side. Cut the strand and place the stitches on a stitch holder. Work the left front piece along the left back shoulder as follows.

LEFT SHOULDER:
Find the left back shoulder as follows: Lay the back piece flat, right side up, with the stitch holder/thread towards you; left side of piece = left shoulder.
Start with the left band and work as follows from the right side across the 12-12-12-14-14-16-16 stitches: Slip 1 stitch purl-wise with the strand in front, knit 1, slip 1 stitch purl-wise with the strand in front, purl 1, knit 8-8-8-10-10-12-12. Then, from the neck on the left back shoulder, knit up 1 stitch in each row worked inside the outermost stitch as far as the armhole (18-20-20-22-22-24-26 stitches) = 30-32-32-36-36-40-42 stitches.
All measurements on the front piece are taken from this knitted-up row. Work as follows:
ROW 1 (wrong side): Purl until there are 12-12-12-14-14-16-16 stitches left, work 8-8-8-10-10-12-12 garter stitches, knit 2, slip 1 stitch purl-wise with the strand in front, knit 1.
ROW 2 (right side): Slip 1 stitch purl-wise with the strand in front, knit 1, slip 1 stitch purl-wise with the strand in front, purl 1, knit to end of row.
Work ROWS 1 and 2 until the piece measures 12-13-14-14-15-16-16 cm from the knitted-up row.

OVERVIEW OF THE NEXT SECTION:
You now increase for the V-neck and subsequently increase for the armhole. The increases for the armhole begin before the increases for the V-neck are finished. Read the next 2 sections before continuing so you know when to begin the increases for the armhole.

INCREASE FOR V-NECK:
ROW 1 (right side): Work the 12-12-12-14-14-16-16 band-stitches as before, increase 1 stitch towards the left – remember INCREASE TIP-1, knit to end of row.
ROW 2 (wrong side): Work as before without increasing. The increased stitches are worked in stocking stitch.
Increase like this every 4-4-4-3½-3½-3½-3½ cm a total of 9-9-9-10-10-10-10 times.

INCREASE FOR ARMHOLE:
When the piece measures 26-27-26-28-27-27-27 cm from the knitted-up row, increase as follows:
ROW 1 (right side): Work as before until there are 4 stitches left, increase 1 stitch towards the right – remember INCREASE TIP -1, knit 4.
ROW 2 (wrong side): Work as before without increasing.
Work ROWS 1 and 2 a total of 1-1-3-2-4-5-6 times (2-2-6-4-8-10-12 rows worked).

Continue working until the piece measures 27-28-30-31-32-34-35 cm from the knitted-up row, finishing after a row from the right side (the increases for the V-neck continue on the body).
Cut the strand and place the stitches on a stitch holder. Work the right shoulder along the right back shoulder as follows.

RIGHT FRONT PIECE:
Start from the right side by the armhole on the right back shoulder and knit up 1 stitch in each row worked, inside the outermost stitch as far as the neck (18-20-20-22-22-24-26 stitches), then work the 12-12-12-14-14-16-16 right band-stitches as follows from the right side: Knit 8-8-8-10-10-12-12, purl 1, knit 1, slip 1 stitch purl-wise with the strand in front, knit 1 = 30-32-32-36-36-40-42 stitches.
All measurements on the front piece are taken from this knitted up row.
ROW 1 (wrong side): Slip 1 stitch purl-wise with the strand in front, knit 1, slip 1 stitch purl-wise with the strand in front, knit 1, purl to end of row.
ROW 2 (right side): Knit until there are 4 stitches left, purl 1, knit 1, slip 1 stitch purl-wise with the strand in front, knit 1.
Work ROWS 1 and 2 until the piece measures 12-13-14-14-15-16-16 cm from the knitted-up row.

OVERVIEW OF THE NEXT SECTION:
You now increase for the V-neck and subsequently increase for the armhole. The increases for the armhole begin before the increases for the V-neck are finished. Read the next 2 sections before continuing so you know when to begin the increases for the armhole.

INCREASE FOR V-NECK:
ROW 1 (right side): Knit until there are 12-12-12-14-14-16-16 stitches left on the row, increase 1 stitch towards the right, work the band as before.
ROW 2 (wrong side): Work as before without increasing.
Increase like this every 4-4-4-3½-3½-3½-3½ cm a total of 9-9-9-10-10-10-10 times.

INCREASE FOR ARMHOLE:
When the piece measures 26-27-26-28-27-27-27 cm from the knitted-up row, increase as follows:
ROW 1 (right side): Knit 4, increase 1 stitch towards the left, work to end of row as before.
ROW 2 (wrong side): Work as before without increasing.
Work ROWS 1 and 2 a total of 1-1-3-2-4-5-6 times (2-2-6-4-8-10-12 rows worked).

Continue working until the piece measures 27-28-30-31-32-34-35 cm from the knitted-up row, finishing after a row from the right side (the increases for the V-neck continue on the body).
The front and back pieces are now joined for the body. The piece is now measured from here!

BODY:
Work the first row as follows from the wrong side.
Work as before across the right front piece, cast on 2-2-2-2-4-4-4 stitches (under the sleeve), work stocking stitch across the 56-60-64-68-72-78-84 stitches on the back piece, cast on 2-2-2-2-4-4-4 stitches (under the sleeve), work as before across the stitches on the left front piece.
Insert a marker-thread in the middle of the 2-2-2-2-4-4-4 cast-on stitches under each sleeve; these are used when increasing in sides.
Work back and forth with stocking stitch and the bands as before, continuing to increase for the V-neck. AT THE SAME TIME when the body measures 10 cm from the join, increase 1 stitch on each side of both marker-threads – read INCREASE TIP-3, every 5-5-5-4-4-3-3 cm a total of 2-2-2-3-3-3-3 times. When the increases for the V-neck and sides are finished, there are 148-156-164-180-192-208-220 stitches.
Continue working until the piece measures 52-54-56-58-59-61-63 cm from the knitted-up row mid-back, with the last row from the right side and increasing 3 stitches evenly on this last row = 151-159-167-183-195-211-223 stitches.
On the next row begin the rib. Change to circular needle size 5.5 mm:
ROW 1 (wrong side): Work the 12-12-12-14-14-16-16 band-stitches as before, * purl 3, knit 1 *, work from *-* until there are 15-15-15-17-17-19-19 stitches left, purl 3 and work the 12-12-12-14-14-16-16 band-stitches as before.
ROW 2 (right side): Work the 12-12-12-14-14-16-16 band-stitches as before, * knit 3, purl 1 *, work from *-* until there are 15-15-15-17-17-19-19 stitches left, knit 3 and work the 12-12-12-14-14-16-16 band-stitches as before.
Work ROWS 1 and 2 until the rib measures 4-4-4-4-5-5-5 cm, finishing after a row from the right side. Purl 1 row across all stitches, then cast off slightly loosely with knit from the right side.
The jacket measures approx. 56-58-60-62-64-66-68 cm from the knitted-up row mid-back and 58-60-62-64-66-68-70 cm from the shoulder.

SLEEVES:
The sleeve is worked top down.
Lay the piece flat and insert 1 marker at the top of the armhole. NOTE: This is not the same as the knitted-up row on the front piece but a few cms down the front piece.
Use circular needle size 7 mm and knit up tightly or use a smaller needle size.
KNIT UP STITCHES AS FOLLOWS:
Start in the middle of the cast-on stitches under the sleeve and knit up 46-48-50-54-58-60-62 stitches around the armhole, with equal numbers of stitches on both sides of the marker.
SLEEVE CAP:
Work stocking stitch back and forth with short rows for the sleeve cap (to give the sleeve a better fit), starting from mid-under the sleeve as follows:
ROW 1 (right side): Knit to 5-5-5-5-4-3-3 stitches past the marker on top of the sleeve, turn – read KNITTING TIP.
ROW 2 (wrong side): Purl to 5-5-5-5-4-3-3 stitches past the marker, turn.
ROW 3 (right side): Knit to 2 stitches past the previous turn, turn.
ROW 4 (wrong side): Purl to 2 stitches past the previous turn, turn
Repeat ROWS 3 and 4 until you have turned a total of 12-14-16-16-20-24-24 times (6-7-8-8-10-12-12 times each side, with the last row from the wrong side).

AFTER THE LAST TURN:
After the last row-4, turn and knit back from the right side to the beginning of the round (mid-under the sleeve).
Insert 1 marker-thread here; it is used when decreasing under the sleeve. Allow it to follow your work onwards.
SLEEVE CONTINUED:
Work stocking stitch in the round. AT THE SAME TIME after 1 round, decrease stitches mid-under the sleeve - read DECREASE TIP as follows:
Decrease 2 stitches every 2nd round 2-2-2-3-4-4-4 times, then decrease 2 stitches every 2 cm 4-4-3-3-3-3-3 times = 34-36-40-42-44-46-48 stitches.
When the sleeve measures 21-22-22-23-26-29-29 cm from the marker on the shoulder (with at least 2 cm worked after the last decrease), increase 4 stitches evenly on the round – read INCREASE TIP-3. Increase like this every 5-5-5-5-4-4-3½ cm a total of 3 times, work 5-5-5-5-4-4-3½ cm then increase 2 stitches evenly spaced = 48-50-54-54-58-60-62 stitches.
Continue working until the sleeve measures 49-48-49-48-48-47-47 cm from the shoulder.
On the next round, begin the rib. Change to double pointed needles size 5.5 mm.
ROUND 1: * Make 1 yarn over, slip 1 stitch purl-wise with the strand in front, purl 1 *, work from *-* to end of round.
ROUND 2: * Knit together the yarn over and slipped stitch, purl 1 *, work from *-* to end of round.
Repeat ROUNDS 1 and 2 until the rib measures 4-4-4-4-5-5-5 cm, finishing after round-2.
Knit 1 round, then cast off slightly loosely with knit.
The sleeve measures approx. 53-52-53-52-53-52-52 cm from the shoulder.

BELT:
Cast on 10 stitches with needle size 7 mm, 1 strand DROPS Melody and 1 strand DROPS Fabel.
ROW 1 (right side): Slip 1 stitch purl-wise with the strand in front, knit 1 *, work from *-* to end of row. Turn.
ROW 2 (wrong side): * Slip 1 stitch purl-wise with the strand in front, knit 1 *, work from *-* to end of row. Turn.
Repeat ROWS 1 and 2 until the belt measures 160-170-185-200-215-230-255 cm; stretch the belt slightly as you work so the stitches lie neatly. When you reach the correct length, knit all stitches twisted together 2 and 2 = 5 stitches. Cast off with purl.
The belt is tied around the waist.

Diagram

Diagram for DROPS 271-30

Each of our patterns has specific tutorial videos to help you.

Do you have a question? See a list of frequently asked questions (FAQ)

Knitting tension is what determines the final measurements of your work, and is usually measured per 10 x 10 cm. It is provided like so: number of stitches in width x number of rows in height - eg: 19 stitches x 26 rows = 10 x 10 cm.

The knitting tension is very individual; some people knit/crochet loosely while others work tightly. You adjust the knitting tension with the needle size, which is why the suggested needle size is only meant as a guide! You need to adjust this (up or down) to ensure that YOUR knitting tension matches the knitting tension provided in the pattern. If you work with a different knitting tension than provided you will have a different yarn consumption, and your work will have different measurements than what the pattern suggests.

The knitting tension also determines which yarns can replace each other. As long as you achieve the same knitting tension you can replace one yarn with another.

See DROPS lesson: How to measure your tension/gauge

See DROPS video: How to make a gauge tension swatch

The required amount of yarn is provided in grams, eg: 450 g. To calculate how many balls you’ll need you first need to know how many grams are in 1 ball (25g, 50g or 100g). This information is available if you click on the individual yarn quality on our pages. Divide the amount required with the amount of each ball. For example, if each ball is 50g (the most common amount), the calculation will be as follows: 450 / 50 = 9 balls.

The important thing when changing from one yarn to another is that the knitting/crochet tension remains the same. This is so that the measurements of the finished piece will be the same as on the sketch provided. It is easier to achieve the same knitting tension using yarns from the same yarn group. It is also possible to work with multiple strands of a thinner yarn to achieve the knitting tension of a thicker one. Please try our yarn converter. We recommend you to always work a test swatch.

Please NOTE: when changing yarn the garment might have a different look and feel to the garment in the photo, due to individual properties and qualities of each yarn.

See DROPS lesson: Can I use a different yarn than the one mentioned in the pattern?

All our yarns are categorised into yarn groups (from A to F) according to thickness and knitting tension – group A contains the thinnest yarns and group F the thickest. This makes it easier for you to find alternative yarns to our patterns, should you wish to switch yarn. All yarns within the same group have a similar knitting tension and can easily replace each other. However, different yarn qualities have different structures and properties which will give the finished work a unique look and feel.

Click here for an overview of the yarns in each yarn group

At the top of all our patterns you’ll find a link to our yarn calculator, which is a helpful tool should you wish to use a different yarn than suggested. By filling in the yarn quality you wish to replace, the amount (in your size) and number of strands, the calculator will present good alternative yarns with the same knitting tension. Additionally it will tell you how much you’ll require in the new qualities and whether you’ll need to work with multiple strands. Most skeins are 50g (some are 25g or 100g).

If the pattern is worked with multiple colours, every colour will have to be calculated separately. Similarly, if the pattern is worked with several strands of different yarns (for example 1 strand Alpaca and 1 strand Kid-Silk) you will have to find alternatives for each, individually.

Click here to see our yarn calculator

Since different yarns have different qualities and textures we have chosen to keep the original yarn in our patterns. However, you can easily find options among our available qualities by using our yarn calculator, or simply pick a yarn from the same yarn group.

It is possible that some retailers still have discontinued yarns in stock, or that someone has a few skeins at home that they would like to find patterns for.

The yarn calculator will provide both alternative yarn as well as required amount in the new quality.

If you think it's hard to decide what size to make, it can be a good idea to measure a garment you own already and like the size of. Then you can pick the size by comparing those measures with the ones available in the pattern's size chart.

You'll find the size chart at the bottom of the pattern.

See DROPS lesson: How to read size chart

The needle size provided in the pattern serves only as a guide, the important thing is to follow the knitting tension. And since knitting tension is very individual, you will have to adjust the needle size to ensure that YOUR tension is the same as in the pattern – maybe you’ll have to adjust 1, or even 2 needle sizes, up or down to achieve the correct tension. For this, we recommend that you work test swatches.

Should you work with a different knitting tension than the one provided, the measurements of the finished garment might deviate from the measurement sketch.

See DROPS lesson: How to measure your tension/gauge

See DROPS video: How to make a tension/gauge swatch

Working a garment top-down provides more flexibility and room for personal adjustment. For example it is easier to try the garment on while working, as well as making adjustments to length of yoke and shoulder caps.

The instructions are carefully explaining every step, in the correct order. Diagrams are adjusted to the knitting direction and are worked as usual.

The diagram depicts all rows/rounds, and every stitch seen from the right side. It is read from bottom to top, from right to left. 1 square = 1 stitch.

When working back and forth, every other row is worked from the right side and every other row is worked from the wrong side. When working from the wrong side, the diagram will have to be worked reversed: from left to right, knit stitches are purled, purl stitches are knit etc.

When working in the round every round is worked from the right side and the diagram are worked from right to left on all rounds.

See DROPS lesson: How to read knitting diagrams

The diagram depicts all rows/rounds, and every stitch seen from the right side. It is worked from bottom to top, from right to left.

When working back and forth every other row is worked from the right side: from right to left and every other row is worked from the wrong side: from left to right.

When working in the round, every row in the diagram are worked from the right side, from right to left.

When working a circular diagram you start in the middle and work your way outwards, counter clockwise, row by row.

The rows usually start with a given number of chain stitches (equivalent to the height of the following stitch), this will either be depicted in the diagram or explained in the pattern.

See DROPS lesson: How to read crochet diagrams

Instructions for working several diagrams after each other on the same row/round, will often be written like so: “work A.1, A.2, A.3 a total of 0-0-2-3-4 times". This means you work A.1 once, then A.2 is worked once, and A.3 is repeated (in width) the number of times provided for your size – in this case like so: S = 0 times, M = 0 times, L=2 times, XL= 3 times and XXL = 4 times.

The diagrams are worked as usual: begin with the first row in A.1, then work the first row in A.2 etc.

See DROPS lesson: How to read knitting diagrams

See DROPS lesson: How to read crochet diagrams

The total width of the garment (from wrist-to-wrist) will be larger in the larger sizes, despite the actual sleeves being shorter. The larger sizes have longer sleeve caps and wider shoulders, so there will be a good fit in all sizes.

The measurement sketch/schematic drawing provides information regarding the full length of the garment. If it’s a jumper or a jacket the length is measured from the highest point on the shoulder closest to the neckline, and straight down to the bottom of the garment. It is NOT measured from the tip of shoulder. Similarly, the length of yoke is measured from the highest point on the shoulder and down to where yoke is split into body and sleeves.

On a jacket measures are never taken along bands, unless specifically stated. Always measure inside band stitches when measuring the length.

See DROPS lesson: How to read a schematic drawing

Diagrams are often repeated on the round or in height. 1 repeat is the diagram the way it appears in the pattern. If it says to work 5 repeats of A.1 in the round, then you work A.1 a total of 5 times after/next to each other in the round. If it says to work 2 repeats of A.1 vertically/in height you work the entire diagram once, then begin again at the start and work the entire diagram one more time.

Chain stitches are slightly narrower than other stitches and to avoid working the cast-on edge too tight, we simply chain more stitches to begin with. The stitch count will be adjusted on the following row to fit the pattern and measurement sketch.

The rib edge is more elastic and will contract slightly compared to, for example, stocking stitch. By increasing before the rib edge, you avoid a visible difference in width between the rib edge and the rest of the body.

It’s very easy to cast off too tightly, and by making yarn overs while casting off (and simultaneously casting these off) you avoid a too tight cast off edge.

See DROPS video: How to bind off with yarn overs (yo)

To achieve an even increase (or decrease) you can increase on, for example: every 3rd and 4th row alternately, like so: work 2 rows and increase on the 3rd row, work 3 rows and increase on the 4th. Repeat this until the increase is complete.

See DROPS lesson: Increase or decrease 1 st on every 3rd and 4th row alternately

Should you prefer to work in the round instead of back and forth, you may of course adjust the pattern. You’ll need to add steeks mid-front (usually 5 stitches), and follow the instructions. When you would normally turn and work from the wrong side, simply work across the steek and continue in the round. At the end you’ll cut the piece open, pick up stitches to work bands, and cover the cut edges.

See DROPS video: How to knit steeks and cut open

Should you prefer to work back and forth instead of in the round, you may of course adjust the pattern so you work the pieces separately and then assemble them at the end. Divide the stitches for the body in 2, add 1 edge stitch in each side (for sewing) and work the front and back pieces separately.

See DROPS lesson: Can I adapt a pattern for circular needles into straight needles?

Pattern repeats can vary slightly in the different sizes, in order to get the correct proportions. If you’re not working the exact same size as the garment in the photo, yours might deviate slightly. This has been carefully developed and adjusted so that the complete impression of the garment is the same in all sizes.

Make sure to follow instructions and diagrams for your size!

If you have found a pattern you like which is available in women’s size it’s not very difficult to convert it to men’s size. The biggest difference will be the length of sleeves and body. Start working on the women size that you think would fit across the chest. The additional length will be worked right before you cast off for the armhole/sleeve cap. If the pattern is worked top-down you can add the length right after the armhole or before the first decrease on sleeve.

Regarding additional yarn amount, this will depend on how much length you add, but it is better with a skein too many than too few.

All yarns will have excess fibres (from production) that might come off as lint or shedding. Brushed yarns (ie hairier yarns) have more of these loose, excess fibres, causing more shedding.

Shedding also depends on what is worn under or over the garment, and whether this pulls at the yarn fibres. It’s therefore not possible to guarantee that there will be no shedding

Below are some tips on how to get the best result when working with hairier yarns:

1. When the garment is finished (before you wash it) shake it vigorously so the looser hairs come off. NOTE: do NOT use a lint roller, brush or any method that pulls at the yarn.

2. Place the garment in a plastic bag and put it in your freezer - the temperature will cause the fibres to become less attached to each other, and excess fibres will come off easier.

3. Leave in the freezer for a few hours before taking it out and shaking it again.

4. Wash the garment according to the instructions on the yarn label.

Pilling is a natural process that happens to even the most exclusive of fibers. It's a natural sign of wear and tear that is hard to avoid, and that is most visible in high friction areas of your garment like a sweater's arms and cuffs.

You can make your garment look as new by removing the pilling, using a fabric comb or a pill/lint remover.

Still can't find the answer you need? Then scroll down and leave your question so one of our experts can try to help you. This will be done normally within 5 to 10 working days.
In the meantime, you can read the questions and answers that others have left to this pattern or join the DROPS Workshop on Facebook to get help from fellow knitters/crocheters!
Have you finished this pattern?
Tag your pictures with #dropspattern #mistysunrisejacket or submit them to the #dropsfan gallery.

Post a comment to pattern DROPS 271-30

We would love to hear what you have to say about this pattern!

If you want to leave a question, please make sure you select the correct category in the form below, to speed up the answering process. Required fields are marked *.