Lorraine wrote:
What ply is Drops Ice as recommended for this crochet jacket? sorry, we can't find it anywhere :D
14.08.2016 - 04:41DROPS Design answered:
Dear Lorraine, DROPS Ice is discontinued, but you can use yarns from yarn group E as alternatives, in particular DROPS Peak. All the yarns from this yarn group are 14 ply. Happy crocheting!
14.08.2016 - 11:00
Sonia Auvray-jacques wrote:
Les augmentations de 2 dB sur les devant, elles sont à faire sur les bords des devant ou au milieu de chaque devant ? Merci
09.08.2016 - 10:30DROPS Design answered:
Bonjour Mme Auvray-Jacques, les augmentations des devants se font en crochetant 2 DB (= double-brides) dans la 2ème m à partir du bord + dans l'avant-dernière m du devant (= à 1 m des bords des devants) - cf "AUGMENTATIONS 2". Bon crochet!
09.08.2016 - 12:03
Miranda wrote:
Waar zie ik de meerderingen van de voorpanden ercstaat let op de meerderingen maar ik snap niet hoe en waar
18.04.2016 - 19:07DROPS Design answered:
Hoi Miranda. Er staat in het patroon (Achter- en voorpand): "Meerder bij een hoogte van 18-16-18-16-18 cm 3 keer 2 dstk aan weerskanten van het middenvoor in elke 4e toer (= elke 2e toer dstk) – zie Tip voor het meerderen 2. Bovenaan het patroon staat Tip voor het meerderen 2: Meerder 2 dstk door 1 extra dstk te haken in de 2e laatste v van het middenvoor.
21.04.2016 - 16:03
Ana Isabel Antunes wrote:
Can't understand how de don't work, in the left/ right front till the neckline, and work only the sede stitches. I think de should work right to the zone of the neckline were de should do the curve to the shoulders. Don't know if you understand my comment because my english is bad. Thanks and best regards.
13.10.2014 - 21:24DROPS Design answered:
Dear Mrs Antunes, you shape the shoulder leaving the 14-20 sts towards shoulder unworked, then continue working with inc towards mid front and at the same time dec towards shoulder to create the "curve" on neckline (see chart). You may also ask your question in your language if it is easier for you. Happy crocheting!
14.10.2014 - 10:10
Ina wrote:
Dank u wel! ;-)
01.05.2014 - 20:42
Rita wrote:
Op de drops ice zat 45 meter
01.05.2014 - 16:46
Ina wrote:
Goedemiddag, Het lijkt mij een heerlijk vest om te maken. Helaas is ICE uitverkocht/niet meer leverbaar. Kunt u mij nog wel vertellen hoeveel meter op deze bollen zat, zodat ik uit kan rekenen hoeveel ik nodig heb voor een ander wolsoort? Hartelijke groet
01.05.2014 - 14:38DROPS Design answered:
Onder assortiment, niet meer leverbare kwaliteiten vindt u een overzicht van alle garens die ooit door DROPS geproduceerd werden: https://www.garnstudio.com/lang/nl/visgarn_oversikt_gamle.php.
01.05.2014 - 22:59Monique wrote:
Hi there Drops Design! I've just noticed a spelling error in the pattern in (US) English. Maybe you could fix it (since Peggy got stuck on it;)). In the paragraph beginning with 'Back and front pieces:' behind the * it says 1 sc in ACH of next 3 ch. I suppose it should be 1 sc in EACH of next 3 ch. Regards, Monique
19.12.2013 - 10:45Fabiana wrote:
As fressia Espinosa said, I'm stuck on the explanation on the increases where it says to inc 2 dtr on each side mid front on every 4 rows...Where exactly do you increase those 2 dtr? on which side of the whole jacket worked untill there?
01.10.2013 - 22:32
Peggy wrote:
I mean ach,Ach of the chain ?
20.09.2013 - 03:52
Britt |
||||||||||||||||
|
||||||||||||||||
Drops crochet jacket in ”Ice” with tr group pattern and stay in waist size S - XXL
DROPS 99-19 |
||||||||||||||||
Crochet tension: 8 dtr/dc in width on 10 cm and 2 pattern repeats M.1 in height on 8 cm. 1 pattern repeat M.2 measures approx 7 cm in width and 3 cm in height. Pattern: See diagram M.1 and M.2. Diagrams are seen from RS. Crochet info: Substitute first dtr on each row with 4 ch. Increasing tip 1: Increase 1 dc by crocheting 2 dc in 1 dtr. Increasing tip 2: Inc 2 dtr by crocheting 1 extra dtr in 2nd last dc mid front. Decreasing tip: Only dec on rows of dc. Dec 1 dc as follows: Insert hook in first sts, pick up thread, insert hook in next sts, pick up thread, yo and pull thread through all 3 sts on hook. Back and front pieces: Crochet piece back and forth from mid front. Crochet 107-114-121-135-142 ch (incl 1 ch to turn with) on crochet hook size 8 mm with DROPS Ice. Crochet next round as follows: 1 dc in 2nd ch from hook, 1 dc in each of next 2 ch, skip 1 ch, * 1 dc in each of next 3 ch, skip 1 ch * repeat from *-* and finish off with 1 dc in each of last 2-1-0-2-1 ch = 80-85-90-101-106 dc. Crochet 1 row of 1 dtr in each dc – read Crochet info. Continuing crochet M.1 until piece is completed. NOTE: First row of M.1 adjust sts number to 77-84-91-99-107 dc (size S, M and XL: Read Decreasing tip, Size L and XXL: Read Increasing tip 1). Insert 1 marking thread (MT) after 19-21-23-25-27 sts from each side (marking mid sides) = 39-42-45-49-53 dc on back piece. At the same time when piece measures 7 cm dec 1 dc on each side of both MT – read Decreasing tip. Repeat dec when piece measures 15 cm = 69-76-83-91-99 dc/dtr. When piece measures 18-16-18-16-18 cm inc 2 dtr on each side mid front on every 4 rows (= every 2nd row of dtr) 3 times in total –read Increasing tip 2. At the same time when piece measures approx 31-32-33-34-35 cm split piece at marking threads on sides. Complete front and back pieces separately. Back piece: = 35-38-41-45-49 dc/dtr. Begin by crocheting left side 1-1-2-2-2 sts after marking thread. Crochet M.1 until 1-1-2-2-2 sts are left before marking threads on other side = 33-36-37-41-45 dc/dtr. Turn piece. Crochet back and forth until piece measures approx 46-48-50-52-54 cm. Now crochet 2 rows (1 row dtr and 1 row dc) but only over 12-13-14-15-17 sts on each side, middle 9-10-9-11-11 sts = neck. Cut yarn, piece now measures approx 50-52-54-56-58 cm. Left front piece: Continue crocheting in M.1 from mid front to marking thread on side. Turn piece and crochet back. Remember inc at mid front. Continue as follows until piece measures 38-40-42-40-42 cm, now there are 23-25-27-29-31 dc/dtr on row. Continue crocheting but only over 14-15-16-18-20 sts at side (i.e. do not crochet 9-10-11-11-11 sts at mid front). Continuing dec 1 dc mid front – read Decreasing tip – on every other row (= each row with dc) 2-2-2-3-3 times in total = 12-13-14-15-17 dc/dtr left on shoulder. Crochet until piece measures 50-52-54-56-58 cm. Cut yarn. Right front piece: Crochet like left reversed. Edge on back and front pieces: Crochet an edge with tr group pattern on bottom edge of back and front pieces. Crochet in ch row that was crochet at beginning of piece. Start mid front at bottom of left front piece. Crochet M.2 around entire back and front piece. When M.2 has been crochet 2 times in height (i.e. 4 rows) cut yarn. Assembly: Sew shoulder seams in outermost edge. Sleeve: Crochet sleeve from top down back and forth from mid under arm. Crochet 11-12-12-13-14 ch loops round armhole as follows: 1 dc in first dtr mid under arm (where piece is split), * 2 ch, skip approx 2 cm, 1 dc in next st *, repeat from *-*. Crochet next round as follows: 1 dc in first dc, * 2 dc around ch loop, 1 dc in next dc *, repeat from *-* = 34-37-37-40-43 dc. Continuing crochet 1 row dtr crochet 1 dtr in each dc. Continue with M.1. At the same time when piece measures 7 cm dec 1 st on each side – read Decreasing tip – on every other row (= each row in dc) 7 times in total = 20-23-23-26-29 dc/dtr. Continue with M.1 until piece measures 42-41-41-40-38 cm. NB: On last dc row before finished measurement adjust st number to 20-25-25-25-30 dc. Cut yarn. Assembly: Sew arm seams in outermost edge. Edge around sleeves: Crochet an edge in tr group pattern around sleeves in same way as back and front pieces, but skip 4 sts between each tr group in stead of 6 sts. Start mid under sleeve. Crochet tr groups around sleeve (= 4-5-5-5-6 pattern repeats). When 4 rounds of tr group pattern are completed cut yarn. Neck edge: Crochet an edge of tr group pattern round neck in same ways as sleeves. Start mid front on top of right front piece. Crochet tr groups around neckline to top of left front piece (adjust to 1 tr group is placed mid front on each side). When 2 rows of tr group pattern are completed cut yarn. Stays: Crochet a row of ch approx 1.5 to 2 meters long. Tie a knot on each end. Pull stay up and down in dtr row on middle of jacket waist. |
||||||||||||||||
Diagram explanations |
||||||||||||||||
|
||||||||||||||||
![]() |
||||||||||||||||
Have you finished this pattern?Tag your pictures with #dropspattern or submit them to the #dropsfan gallery. Do you need help with this pattern?You'll find 8 tutorial videos, a Comments/Questions area and more by visiting the pattern on garnstudio.com. © 1982-2025 DROPS Design A/S. We reserve all rights. This document, including all its sub-sections, has copyrights. Read more about what you can do with our patterns at the bottom of each pattern on our site. |
Post a comment to pattern DROPS 99-19
We would love to hear what you have to say about this pattern!
If you want to leave a question, please make sure you select the correct category in the form below, to speed up the answering process. Required fields are marked *.