Beth escribió:
For my size, before starting M1 on sleeve, I should have 52 stitches. After an increase on each side of marker a total of 8 times I should have 68 but pattern says 62 after all increases and decreases. The pattern doesn't call for any decreases on sleeve. Also, when I put sleeves on needle with body, will it just be the 24 stitches with the cables with the test on a holder?
12.12.2018 - 04:23DROPS Design respondió:
Dear Beth, after all increases are done you will have 68 sts, but after you have worked M.2 over M.1 you will decrease 6 sts in M.2 (see last symbol under diagram text worked in A.2 over the cables = 2 sts dec over each cable) = 62 sts remain. Happy knitting!
12.12.2018 - 10:00
Thecraftywiccan escribió:
I'm really enjoying knitting this project, I am however having a few issues with the pattern, its quite confusing to read scattered around as it it. I already have a few more patterns bookmarked and Im looking forward to knitting them.
16.03.2018 - 13:23
Tammy Lebel escribió:
Also, it says to insert a M1, 11 stitches after M1, I just don’t understand
10.10.2017 - 07:44DROPS Design respondió:
Dear Mrs Lebel, you are inserting a marking thread = MT for marking thread. Happy knitting!
10.10.2017 - 09:45
Tammy Lebel escribió:
Thanks for the fast response, I’ve read the chart that way, still not working out, when it says to increase 6 stitches evenly, do I do that in the reverse stockingnette part of the sleeve?
10.10.2017 - 07:38DROPS Design respondió:
Dear Mrs Lebel, row 1 in M.1= P2, Slip 2 sts on cable needle behind piece, K2, K2 from cable needle, P4, Slip 2 sts on cable needle behind piece, K2, K2 from cable needle, P4, Slip 2 sts on cable needle behind piece, K2, K2 from cable needle, P2. The 6 sts increased evenly on sleeve after M.1 are increased all the sts worked in garter st except over M.1. Happy knitting!
10.10.2017 - 09:44
Tammy Lebel escribió:
I’m not understanding this M1, do I read leftvto right? This is the first cable pattern that is not written out, so I’m struggling with the chart
09.10.2017 - 09:51DROPS Design respondió:
Dear Mrs Lebel, read diagrams from the right towards the left from RS and from the left towards the right from RS, starting from bottom corner on the right side. Happy knitting!
09.10.2017 - 10:12
Sue escribió:
Hi I am afraid that I can't read a chart is it possible to have written instructions for the 2 charts please? Many thanks Sue
16.08.2016 - 16:53DROPS Design respondió:
Dear Sue, only diagram is available to this pattern, but please read more about diagrams here and remember your DROPS store will have more tips & advices for you, even per mail or telephone. Happy knitting!
17.08.2016 - 09:03
Becky Matthews escribió:
Not sure what to do after I put the 10 stitches on the stitch holder. When I am knitting the next row, do I tighten up my yarn behind the ten stitches or leave a loose line of yarn. I can't visualize what the ten stitches do.
06.07.2016 - 00:01DROPS Design respondió:
Dear Mrs Matthews, these 10 sts will be then worked tog with the hood afterwards. From RS work these 10 sts and slip them onto a stitch holder (to avoid cutting yarn), then work remaining sts on row, turn, work the first 10 sts from WS, slip them on to a st holder, work remaining sts. And continue casting off for neck as stated. Happy knitting!
06.07.2016 - 08:07
Brigid McHugh escribió:
I am having problems with the diagram. Am I supposed to read from the bottom up or the top down? I've tried it 5 different ways and not getting the cable to come out correctly. Mind you I have made many cable knit sweaters... Please help?
01.03.2016 - 07:31Brigid McHugh respondió:
I see what I have done. Nevermind :-)
01.03.2016 - 07:46
Janine escribió:
Just saw where I went wrong. I decrease 8 sts x 13 not 4 x 13.
18.02.2016 - 06:33
Janine escribió:
Help - Stuck on yoke. Making size M. Have 228 sts on needle. After decreasing every 4th row 13 times I have 176 sts. After decreasing every other row 2 times I have 168 sts. Put 10 sts each side mid front leaves me with 148 stitches. I understand that at neck have to bind off 2 sts 3 times every row (-12sts) which leaves me with 136 stitches then 1 stitch 5 times (-10) which leaves me with 126 sts. I’m supposed to be left with 66 sts. Can anyone tell me where I have gone wrong?
18.02.2016 - 06:27
Celtic Charm |
||||||||||||||||||||||||||||
![]() |
![]() |
|||||||||||||||||||||||||||
Suéter de punto DROPS en “Alaska” con torsadas (trenzas), mangas raglán y capucha (caperuza). Talla S – XXXL
DROPS 109-3 |
||||||||||||||||||||||||||||
CUERPO: Se teje de ida y vuelta en ag circular desde el delantero central. Mon 220-228-244-260-276-292 pts (incluye 8 pts del borde delantero (vista) a cada lado) en ag circular tamaño 5 mm con Alaska. Tejer 1 vta del revés por el LR y cont como sigue: 8 pts musgo (borde delantero), pt resorte 4d/4r en los sig 200-208-224-240-256-272 pts, terminar con 4d y 8 pts musgo (borde delantero). Cuando la pieza mida 4 cm cambiar a ag circular tamaño 5.5 mm y cont como sigue por el LD: 8 pts musgo, 6-6-6-6-14-14 pts en pt jersey revés, M.1 (= 24 pts), 40-40-48-56-56-64 pts en pt jersey revés, M.1, 16-24-24-24-24-24 en pt jersey revés, M.1, 40-40-48-56-56-64 pts en pt jersey revés, M.1, 6-6-6-6-14-14 pts en pt jersey revés, y terminar con 8 pts musgo. Nota: 4 pts derechos en M.1 deberán quedar sobre 4 pts derechos del resorte. Colocar 2 MP en la pieza, 59-61-65-69-73-77 pts hacia adentro de cada lado (pieza de la espalda = 102-106-114-122-130-138 pts). Cont dentro del patrón. Recuerde tejer la muestra! Cuando la pieza mida 8 cm dism 1 pt a cada lado de ambos MP (= 4 dism por vta) cada 2 cm un total de 11 veces = 176-184-200-216-232-248 pts. Recuerde rem para los ojales – ver arriba. Después de 4 repeticiones verticales de M.1 (la pieza mide aprox 36 cm), tejer 1 repetición vertical de M.2 sobre M.1, cont en pt jersey revés en los pts restantes = 152-160-176-192-208-224 pts. En la sig vta cambiar a ag tamaño 5 mm y ahora terminar la pieza en pt musgo – ver arriba. Cuando la pieza mida 42-43-44-45-46-47 cm rem 8 pts a cada lado para la sisa (es decir, 4 pts a cada lado de ambos MP) = 136-144-160-176-192-208 pts. Dejar la pieza a un lado. MANGA: Se teje en redondo en ag de doble punta. Mon 40-40-40-48-48-48 pts en ag de doble punta tamaño 5 mm con Alaska. Tejer 4 cm de pt resorte, 4r/4d. Cambiar a ag de doble punta tamaño 5.5 mm y tejer la sig vta como sigue: 10-10-10-18-18-18 pts en pt jersey revés, M.1 (= 24 pts) y terminar con 6-6-6-6-6-6 pts en pt jersey revés. Nota: 4 pts derechos en M.1 deberán quedar sobre 4 pts derechos del resorte. En la sig vta aum 2-4-6-0-2-4 pts distribuidos equitativamente = 42-44-46-48-50-52 pts, no aum en M.1. Colocar 1 MP en la pieza 9-10-11-12-13-14 pts después de M.1 = centro debajo del brazo. Cont en M.1 y pt jersey revés. Cuando la pieza mida 8 cm aum 1 pt a cada lado del MP cada 9.5-7.5-7.5-6-5-5 cm un total de 5-6-6-7-8-8 veces. Después de 5 repeticiones verticales de M.1 (la pieza mide aprox 44 cm), tejer 1 repetición vertical de M.2 sobre M.1, cont en pt jersey revés en los pts restantes. Cambiar a ag tamaño 5 mm y completar la pieza en pt musgo. Después que todas las dism y aum hayan sido completados hay 46-50-52-56-60-62 pts en la vta. Cuando la pieza mida 50-50-49-49-48-48 cm – menos en las tallas más grandes por copete de manga más largo y hombros más anchos – rem 4 pts a cada lado del MP para la sisa = 38-42-44-48-52-54 pts. Dejar la pieza a un lado para tejer la otra manga. CUELLO: Ver tip para la elaboración del tejido! Deslizar las mangas a la misma ag circular tamaño 5 mm que la pieza del cuerpo en los rem para las sisas = 212-228-248-272-296-316 pts. Colocar 1 MP en todas las uniones entre la pieza del cuerpo y las mangas = 4 MP. Tejer el cuello en pt musgo, de ida y vuelta en la ag. Tejer 2-1-0-1-0-1 vtas y a cont dism para el raglán – ver tip para disminución! Dism cada 4ª vta: 13-13-14-13-13-13 veces y luego en vtas alternas: 0-2-2-5-7-8 veces. Al mismo tiempo cuando la pieza mida 53-55-57-59-60-62 cm desl 10 pts de cada lado a ganchos aux individuales hacia el delantero central. Rem para dar forma a la línea del escote al inicio de cada vta: 2 pts 3-3-6-8-9-9 veces y 1 pt 5-5-2-0-0-0 veces. Después que todas las dism hayan sido completadas hay 66-66-72-76-80-86 pts en la vta. Tejer 1 vta del derecho dism 8-8-12-16-16-22 pts distribuidos equitativamente = 58-58-60-60-64-64 pts. CAPUCHA (CAPERUZA): Levantar 25-25-28-28-30-30 pts en cada pieza delantera (incluyendo pts de los ganchos aux) = 108-108-116-116-124-124 pts. Cambiar a ag tamaño 5.5 mm y tejer 4 vtas pt musgo, al mismo tiempo que dism 18 pts distribuidos equitativamente en la primera vta = 90-90-98-98-106-106 pts. Colocar 1 MP en el centro posterior (después de 45-45-49-49-53-53 pts). Cont en pt jersey revés con 8 pts musgo a cada lado. Al mismo tiempo aum 1 pt a cada lado del MP cada 8ª vta un total de 4 veces = 98-98-106-106-114-114 pts. Rem pt cuando la capucha mida 38-38-39-39-40-40 cm. TERMINACION: Coser aberturas debajo de los brazos. Coser botones. Doblar la capucha por la mitad y unir cosiendo en la parte superior por el LD. |
||||||||||||||||||||||||||||
Explicaciones del diagrama |
||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||
¿Terminaste este patrón?Entonces, etiqueta tus fotos con #dropspattern o envíalas a la galería #dropsfan. ¿Necesitas ayuda con este patrón?Encontrarás 23 videos tutoriales, un espacio para comentarios/preguntas y más visitando la página del patrón en garnstudio.com © 1982-2025 DROPS Design A/S. Todos los derechos reservados. Este documento, incluyendo todas sus sub-secciones, está protegido por los derechos de autor (copyright). Lee más acerca de lo que puedes hacer con nuestros patrones en la parte de abajo de cada patrón de nuestro sitio. |
Escribe un comentario sobre DROPS 109-3
¡Nos encantaría saber qué piensas acerca de este patrón!
Si quieres escribir una pregunta referente al patrón, por favor asegúrate de elegir la categoría correcta en el formulario debajo, para acelerar el proceso de respuesta. Los campos obligatorios están marcados con un *.