Françoise LARNAUDIE wrote:
Comment faire pour relever 12 mailles le long du côté du talon?
04.01.2025 - 23:07DROPS Design answered:
Bonjour Mme Larnaudie, dans cette vidéo, nous montrons (à partir du time code 06:07 environ) comment relever les mailles de chaque côté du talon. Bon tricot!
06.01.2025 - 09:27
Ron wrote:
Knitted the largest size
13.06.2023 - 19:41
Ron wrote:
Indicated yarn weight is more than enough for two pairs
13.06.2023 - 19:38
Christine Voegeli wrote:
Rainbow love
18.01.2023 - 07:37
Nina Wøggsborg wrote:
Autumn socks
17.01.2023 - 17:12
Fireworks Fizzle#fireworksfizzlesocks |
|
![]() |
![]() |
Knitted socks in 2 strands DROPS Fabel. The piece is worked top down with rib. Sizes 35 - 43.
DROPS 238-30 |
|
------------------------------------------------------- EXPLANATIONS FOR THE PATTERN: ------------------------------------------------------- HEEL DECREASES: ROW 1 (= right side): Knit until there are 5-6-6 stitches left, slip 1 stitch as if to knit, knit 1 and pass the slipped stitch over the knitted stitch, turn the piece. ROW 2 (= wrong side): Purl until there are 5-6-6 stitches left, slip 1 stitch as if to purl, purl 1 and pass the slipped stitch over the purled stitch, turn the piece. ROW 3 (= right side): Knit until there are 4-5-5 stitches left, slip 1 stitch as if to knit, knit 1 and pass the slipped stitch over the knitted stitch, turn the piece. ROW 4 (= wrong side): Purl until there are 4-5-5 stitches left, slip 1 stitch as if to purl, purl 1 and pass the slipped stitch over the purled stitch, turn the piece. Continue to decrease like this, working until there is 1 stitch less each time before slipping a stitch and until there are 12-12-14 stitches left on the needle. DECREASE TIP (for toe): Start 3 stitches before the marker, knit 2 together, knit 2 (marker sits between these 2 stitches), slip 1 stitch as if to knit, knit 1 and pass the slipped stitch over the knitted stitch (2 stitches decreased). Repeat at the other marker. ------------------------------------------------------- START THE PIECE HERE: ------------------------------------------------------- SOCKS – SHORT OVERVIEW OF THE PIECE: The piece is worked with 2 strands in the round with double pointed needles, top down. LEG: Cast on 56-64-64 stitches with double pointed needles size 4 mm and 2 strands colour texmex DROPS Fabel. Knit 1 round. Work rib (knit 2, purl 2) for 2 cm. On the next round work rib (knit 6, purl 2) with 1 strand colour pink dream and 1 strand colour off white for 12-13-14 cm (make sure the purl-2 are continued from the first rib). Change to 2 strands pink dream and continue (knit 6, purl 2) until the leg measures 14-15-16 cm. Change to 1 strand colour texmex and 1 strand colour off white and continue (knit 6, purl 2), AT THE SAME TIME, on round 2 decrease 7-8-8 stitches evenly spaced by knitting together the 2nd and 3rd stitch in each knitted section = 49-56-56 stitches. Continue the rib (knit 5, purl 2) until the leg measures 16-17-18 cm. On the last round purl together all purl-2 to purl-1 = 42-48-48 stitches. Now work stocking stitch until the leg measures 18-19-20 cm. On the last round decrease 0-4-0 stitches evenly spaced = 42-44-48 stitches. Cut the strand. HEEL AND FOOT: Keep the first 10-11-12 stitches on the needle for the heel, place the next 22-22-24 stitches on a thread (top of foot) and keep the last 10-11-12 stitches on the needle for the heel = 20-22-24 heel-stitches. Work stocking stitch back and forth with 1 strand colour pink dream and 1 strand colour texmex for 6-6-6½ cm. Insert 1 marker in the middle of the row – the foot is measured from this marker. Work HEEL DECREASES – read description above. After the heel decreases work the next round as follows with 1 strand colour off white and 1 strand colour texmex: Stocking stitch over the 12-12-14 heel stitches, knit up 12-13-13 stitches along one side of the heel, work the 22-22-24 stitches from the thread and knit up 12-13-13 stitches along the other side of the heel = 58-60-64 stitches. Work to the middle of the heel – the round starts here. Insert 1 marker on each side of the 22-22-24 stitches on top of the foot. Work stocking stitch and decrease on each side as follows: Knit together the last 2 stitches before the first marker and knit twisted together the first 2 stitches after the second marker. Decrease like this every round 4-3-3 times in total then every 2nd round 7-7-7 times = 36-40-44 stitches. Continue working until the foot measures 12-13-14 cm from the marker on the heel, measured under the foot. Change to 1 strand colour pink dream and 1 strand colour off white and continue with stocking stitch until the foot measures 16-17-18 cm. Change to 1 strand colour pink dream and 1 strand colour texmex and work until the foot measures 18-19-20 cm. There is 4-5-6 cm left; try the sock on and work to desired length before working the toe. TOE: Insert 1 marker on each side with 18-20-22 stitches both on top of and underneath the foot. Work stocking stitch and, on the first round, decrease on each side of both markers – read DECREASE TIP (= 4 stitches decreased). Decrease like this every 2nd round 4-5-7 times in total then every round 3-3-2 times = 8 stitches. Cut the strand, pull it through the remaining stitches, tighten and fasten well. The foot measures 22-24-26 cm from the marker, measured under the foot. Work the other sock in the same way. |
|
Have you finished this pattern?Tag your pictures with #dropspattern #fireworksfizzlesocks or submit them to the #dropsfan gallery. Do you need help with this pattern?You'll find 23 tutorial videos, a Comments/Questions area and more by visiting the pattern on garnstudio.com. © 1982-2025 DROPS Design A/S. We reserve all rights. This document, including all its sub-sections, has copyrights. Read more about what you can do with our patterns at the bottom of each pattern on our site. |
Post a comment to pattern DROPS 238-30
We would love to hear what you have to say about this pattern!
If you want to leave a question, please make sure you select the correct category in the form below, to speed up the answering process. Required fields are marked *.