Francesca Izzo wrote:
Buonasera vorrei realizzare questo maglione, sono un'esperta. Vorrei capire il collo e sperone quante maglie devo mettere sul ferro circolari?88-96-96-96-104-104 che cosa significano?
20.09.2022 - 19:12DROPS Design answered:
Buonasera Francesca, i numeri separati dai trattini indicano le maglie per le diverse taglie, deve guardare sempre il numero relativo alla sua taglia. Buon lavoro!
21.09.2022 - 21:23
Ewelina wrote:
Witam serdecznie. Chciałabym zrobić ten sweterek dla syna, wszystkie wymiary które są podane pasują oprócz tułowia, brakuje 10cm tu mam pytanie czy sweterek ma podane centymetry po praniu, czy przed i jest szansa, że po praniu się wyciągnie?
29.05.2022 - 17:23DROPS Design answered:
Witaj Ewelino, wymiary podajemy przed praniem. Zrób próbkę i zobacz czy jest zgodna ze wzorem. Następnie wypierz próbkę, czyli zmocz letnią wodą i wysusz - zmierz ponownie. O ile nie robisz ścisło, merynos będzie miał tendencję do wyciągania. Ale bez próbki się nie obędzie ;) Powodzenia!
29.05.2022 - 21:19
María Fernández wrote:
Como se montan puntos bajo la manga?
08.05.2022 - 23:38
María Fernández wrote:
Como se montan puntos bajo la manga
08.05.2022 - 23:36DROPS Design answered:
Hola María, puedes ver cómo montar en el siguiente vídeo, a partir del minuto 7: https://www.garnstudio.com/video.php?id=592&lang=es
09.05.2022 - 19:39
Linda Bjelkeflo wrote:
Jag skulle vilja ha en kabel/wire till mina utbytbara rundstickor drops pro romance-stickor så att de blir 40 cm, jag kan inte hitta det på er hemsida, finns det att köpa eller måste jag köpa fasta rundstickor?
03.04.2022 - 16:53DROPS Design answered:
Hej Linda, Ja her ser du: Kabel - 35 cm Klicka på hitta en butik - har stickor og så är det bara att beställa :)
04.04.2022 - 11:24
Donatella wrote:
Buongiorno Nello sponsor nella taglia 9/10 quando aumento da tre a quattro maglie a rovescio passo da 130 a 156 maglie e non 162 come indicato\r\nCosa sbaglio? Grazie
23.02.2022 - 15:37DROPS Design answered:
Buonasera Donatella, grazie per la segnalazione: abbiamo corretto il testo, le 156 maglie sono corrette. Buon lavoro!
23.02.2022 - 22:21
Sandra wrote:
Buongiorno, vorrei sapere cosa si intende per lavorare in piano il colore e lo sprone. Devo lavorare in tondo oppure avanti e indietro sui Ferri circolari e poi cucire l'apertura? Grazie
08.02.2022 - 12:15DROPS Design answered:
Buonasera Sandra, lo sprone e il collo si lavorano in ferri di andata e ritorno. Buon lavoro!
08.02.2022 - 23:30
Francine wrote:
Erreur dans les explications de la manche. Il reste 48 mailles et on dit d’augmenter de 4 mailles pour obtenir 44 mailles! Il faudra diminuer pour obtenir 44 mailles.
28.12.2021 - 21:24DROPS Design answered:
Bonjour Francine, vous avez raison. Merci de l'avoir notifie. Le modele sera corrige. Bon tricot!
29.12.2021 - 10:48
Gaby Kovács wrote:
Kedves szerkesztő, Itt ellentmondást látok. Most le kell kötni a szemeket vagy nem? Vagy csak azt a 24-et? Abban mi a logika? Tegyünk 4 jelölőt a darabba, a köv módon (a szemek lekötése nélkül): Tegyünk kötésjelölőt a darabba, a kör kezdetéhez. Számoljunk ki 46-48-52-52-54-58 szemet itt tegyük a 2. jelölőt a darabba (= a háta). Kössünk 24 szemet, tegyük a 3. jelölőt a darabba (= az ujja). Köszönöm válaszukat Kovács Gaby
25.12.2021 - 18:05
First Leaf#firstleafsweater |
|
![]() |
![]() |
Knitted jumper for children in DROPS BabyMerino. The piece is worked with rib and raglan, top down. Sizes 2 to 12 years.
DROPS Children 41-9 |
|
------------------------------------------------------- EXPLANATIONS FOR THE PATTERN: ------------------------------------------------------- INCREASE/DECREASE TIP (evenly spaced): To work out how to increase/decrease evenly, count the total number of stitches on needle (e.g. 40 stitches), and divide by the number of increases/decreases to be made (e.g. 4) = 10. In this example, increase by making 1 yarn over after each 10th stitch. On the next round work the yarn overs twisted to avoid holes. When decreasing, knit together each 9th and 10th stitch. INCREASE TIP: Increase by making a yarn over; on next round purl the yarn over twisted to avoid holes. RAGLAN: Increase 1 stitch on each side of 2 stocking stitches (marker sits between these 2 stitches) in each transition between body and sleeves (= 8 stitches increased on the round) by making 1 yarn over. On the next round, knit the yarn overs twisted to avoid holes. Then work the new stitches in stocking stitch. DECREASE TIP (for sleeves): Decrease 1 stitch on either side of the marker thread as follows: Work until there are 3 stitches left before the marker thread, knit 2 together, knit 2 (marker thread sits between these 2 stitches), slip 1 stitch as if to knit, knit 1 and pass the slipped stitch over the knitted stitch. CASTING-OFF TIP: To avoid the cast-off edge being tight you can cast off with a larger size needle. If the edge is still tight, make 1 yarn over after approx. each 4th stitch at the same time as casting off; the yarn overs are cast off as normal stitches. ------------------------------------------------------- START THE PIECE HERE: ------------------------------------------------------- JUMPER – SHORT OVERVIEW OF THE PIECE: The neck and yoke are worked in the round with circular needle, top down. The yoke is divided for body and sleeves and the body is continued in the round with circular needle. The sleeves are worked with double pointed needles, top down. NECK/YOKE: Cast on 88-96-96-96-104-104 stitches with double pointed needles/short circular needle size 2.5 mm and DROPS Baby Merino. Knit 1 round then work as follows: Knit 1, * purl 2, knit 2 *, work from *-* until there are 3 stitches left, purl 2 and knit 1. The beginning of the round is in the transition between the left sleeve and the back piece. Work rib for 3 cm (= neck). Insert 1 marker; the yoke is measured from here. On the next round increase 1 stitch at the beginning of each purled section – read INCREASE TIP (= 22-24-24-24-26-26 stitches increased) = 110-120-120-120-130-130 stitches. Continue the new rib (knit 2, purl 3) until the piece measures 2½-2½-3-3-3-3½ cm from the marker. Now increase 1 stitch at the end of each purled section (= 22-24-24-24-26-26 stitches increased) = 132-144-144-144-156-156 stitches. Continue the new rib (knit 2, purl 4) until the piece measures 5-5-6-6-6-7 cm from the marker. Knit 1 round where you increase as described below – read INCREASE/DECREASE TIP! This is done so the 2 knitted stitches in each raglan-line continue over 2 knitted stitches from the rib Adjust as follows: Knit 1, increase 4-0-4-4-0-4 stitches evenly over the next 40-46-46-46-52-52 stitches, knit 26, increase 4-0-4-4-0-4 stitches evenly over the next 40-46-46-46-52-52 stitches, knit 25. You have increased 8-0-8-8-0-8 stitches = 140-144-152-152-156-164 stitches. Change to circular needle size 3 mm. Insert 4 markers without working the stitches. Insert marker 1 at the beginning of the round. Count 46-48-52-52-54-58 stitches, insert marker 2 (= back piece). Count 24 stitches, insert marker 3 (= sleeve). Count 46-48-52-52-54-58 stitches, insert marker 4 (= front piece). There are 24 stitches after marker 4. Continue with stocking stitch, AT THE SAME TIME on the first round start to increase to RAGLAN – read description above. Increase every 2nd round a total of 15-16-17-18-19-20 times = 260-272-288-296-308-324 stitches. Continue with stocking stitch until the piece measures 15-15-16-17-18-19 cm from the marker. The next round is worked as follows: Knit 76-80-86-88-92-98 (= back piece), place the next 54-56-58-60-62-64 stitches on a thread (= sleeve), cast on 6-6-6-8-8-8 stitches under the sleeve, knit 76-80-86-88-92-98 (= front piece), place the next 54-56-58-60-62-64 stitches on a thread (= sleeve), cast on 6-6-6-8-8-8 stitches under the sleeve. BODY: There are now 164-172-184-192-200-212 stitches on needle. THE PIECE IS NOW MEASURED FROM HERE! Continue with stocking stitch for 16-20-23-25-26-27 cm (or to desired length; there is approx. 3-3-3-4-4-4 cm left to finished length). Knit 1 round and increase 16-16-16-20-20-20 stitches evenly spaced = 180-188-200-212-220-232 stitches. Change to circular needle size 2.5 mm and work rib (knit 2, purl 2) for 3-3-3-4-4-4 cm. Cast off with knit over knit and purl over purl – read CASTING OFF TIP. The jumper measures approx. 36-40-44-48-50-52 cm from the shoulder down. SLEEVES: Place the 54-56-58-60-62-64 stitches from the thread on the one side of the piece on double pointed needles/short circular needle size 3 mm and knit up 1 stitch in each of the 6-6-6-8-8-8 stitches cast on under the sleeve = 60-62-64-68-70-72 stitches. Insert a marker thread in the middle of the 6-6-6-8-8-8 stitches under the sleeve. Start at the marker thread and work stocking stitch in the round for 3 cm. Now decrease 2 stitches under the sleeve – read DECREASE TIP. Decrease like this every 2-2½-3½-3-4-4 cm a total of 6-7-6-8-7-8 times = 48-48-52-52-56-56 stitches. Continue working until the sleeve measures 15-21-24-27-31-35 cm from the division. There is approx. 3-3-3-4-4-4 cm left to finished length; try the jumper on and work to desired length. Knit 1 round where you decrease 4 stitches evenly spaced = 44-44-48-48-52-52 stitches. Change to double pointed needles size 2.5 mm. Work rib (knit 2, purl 2) for 3-3-3-4-4-4 cm. Cast off with knit over knit and purl over purl – remember CASTING-OFF TIP! The sleeve measures approx. 18-24-27-31-35-39 cm from the division. Work the other sleeve in the same way. |
|
![]() |
|
Have you finished this pattern?Tag your pictures with #dropspattern #firstleafsweater or submit them to the #dropsfan gallery. Do you need help with this pattern?You'll find 25 tutorial videos, a Comments/Questions area and more by visiting the pattern on garnstudio.com. © 1982-2025 DROPS Design A/S. We reserve all rights. This document, including all its sub-sections, has copyrights. Read more about what you can do with our patterns at the bottom of each pattern on our site. |
Post a comment to pattern DROPS Children 41-9
We would love to hear what you have to say about this pattern!
If you want to leave a question, please make sure you select the correct category in the form below, to speed up the answering process. Required fields are marked *.