Marimar wrote:
Bonjour, je souhaite faire le tour du cou et je ne comprends pas bien les explications du point : Doit on toujours commencer aux Tours de 1 à 6 par 5 m endroit et 5 m envers sans tenir compte de comment les mailles se présentent ?
16.01.2015 - 23:01DROPS Design answered:
Bonjour Marimar, effectivement, on doit avoir 6 rangs de (5 m end/5 m env) vu sur l'endroit, puis 6 rangs (5 m env/5 m end) et on tricote ces damiers ainsi alternativement. Sur l'envers, tricotez les mailles comme elles se présentent. Bon tricot!
19.01.2015 - 11:10Linda Albert wrote:
WOW ! Finished my hat and it is SUPER cute. Thank you for your help and your fast response. I am now starting a second one for another Christmas gift. Linda
23.11.2014 - 01:24Linda Albert wrote:
I did the work K over K and P over P, but what does "until finish mean"?
21.11.2014 - 03:57DROPS Design answered:
Dear Mrs Albert, when starting dec for hat, you don't work in pattern as before anymore, just continue K over K and P over P until 5-8 sts remain and the hat is finished. Happy knnitting!
21.11.2014 - 10:03
Karianne Peckel Gjelsvik wrote:
Hei, takk for svar. har ritkig strikkefasthet og luen måler 20 cm, men den er da mer som en kalott, sitter tett på hele hodet, er ikke baggy og ligner ikke på luen på bildet her i det hele tatt. ponchoen ble akkurat slik som på bildet, men luen på bildet tror jeg må være strikket enten med større pinner/eller flere masker. prøver rekke opp og finne på egen fasong :)
12.02.2014 - 20:13
Karianne wrote:
Hei, finnes det en rettelse på oppskrift på luen? strikket poncho, den ble fin, men luen i stl L/XL ble kjepeliten, og absolutt ikke baggy som på bildet. oppskriften på luen må være feil?
12.02.2014 - 09:41DROPS Design answered:
Hei Karianne. Den skulle ikke vaere feil. Med den rette strikkefasthed skulle luen blive ca 45 cm i omkreds (den skal sidde stramt paa hovedet og godt 20 cm höj.
12.02.2014 - 13:19
Klára wrote:
Hello, I have a one question. Which side it is precisely to seize? There is a number, but not much on which side to take. Thank you, Regards . Klára K.
26.11.2013 - 20:57DROPS Design answered:
Dear Klara, for neck warmer, you work until work measure 92-102-112 cm in total from beg and cast off. For assembly, you can sew on the side (right or left) you rather like or as on the picture. Happy knitting!
27.11.2013 - 09:05
Marie wrote:
Petit modèle romantique que je ferai surement
22.06.2013 - 14:52
Trijntje Dijkstra wrote:
Hier zal mijn dochter heel blij mee zijn .
17.06.2013 - 22:33Irene wrote:
Lindo!
11.06.2013 - 21:58
Anita wrote:
Supergaaf! Patroon wil ik graag hebben.
06.06.2013 - 14:29
Lilac Weave#lilacweaveset |
|
|
|
Knitted DROPS hat and neck warmer in ”Snow”.
DROPS 149-40 |
|
GARTER ST (back and forth on needle): K all rows. 1 ridge = 2 rows K. PATTERN - HAT: Round 1 to 6: * K 4-5, P 5-5 *, repeat from *-* the entire round. Round 7: * P 4-5 over K sts, K 5-5 over P sts *, repeat from *-* the entire round. Round 8 to 12: P over P and K over K. PATTERN - NECK WARMER: Row 1 to 6: * K 5, P 5 *, repeat from *-*. Row 7: * P 5 over K sts, K 5 over P sts *, repeat from *-*. Row 8 to 12: P over P and K over K. ---------------------------------------------------------- HAT: Worked in the round on double pointed needles. Cast on 45-50 sts on double pointed needles size 8 mm with Snow. K 1 round. On next round work PATTERN - HAT - see explanation above (= 5 times on round). Repeat rounds 1-12 1 more time (= 2 times in total). Work next round as first round (= * K 4-5 over P sts, P 5-5 over K sts *, repeat from *-*). Then work K over K and P over P until finished measurements while AT THE SAME TIME dec as follows: ROUND 1: Work * K 4-5, P 3, P 2 tog *, repeat from *-* 4 more times (= 5 times in total) = 5 sts dec, 40-45 sts on needle. ROUND 2 (and then on every even numbered round): K over K and P over P. ROUND 3: Work * K 2-3, K 2 tog, P 2, P 2 tog *, repeat from *-* 4 more times (= 5 times in total) = 10 sts dec, 30-35 sts on needle. ROUND 5: Work * K 1-2, K 2 tog, P 1, P 2 tog *, repeat from *-* 4 more times (= 5 times in total) = 10 sts dec, 20-25 sts on needle. ROUND 7: Work * K 0-1, K 2 tog, P 2 tog *, repeat from *-* 4 more times (= 5 times in total) = 10 sts dec, 10-15 sts on needle. ROUND 9: K 0-1, then work the rest of the sts K tog 2 by 2 = 5-8 sts. Cut the yarn and pull it through the remaining sts, tighten tog and fasten. Piece measures approx. 24-25 cm vertically. NECK WARMER: Worked back and forth on needle. Cast on 39-44-49 sts on circular needle size 8 mm with Snow. Work 2 RIDGES in garter st - see explanation above. Then work from RS as follows: 2 sts in garter st, PATTERN - NECK WARMER - see explanation above - over the next 35-40-45 sts, finish with 2 sts in garter st. Work like this until piece measures 92-102-112 cm - NOTE: Finish with one whole repetition of either 1st-6th row or 7th-12th row. Work 2 ridges in garter st. Loosely cast off. Piece measures approx. 95-105-115 cm. ASSEMBLY: Sew cast-off edge, edge to edge with the end on one long side to avoid a chunky seam (opposite long side now forms a tip towards mid front). |
|
Have you finished this pattern?Tag your pictures with #dropspattern #lilacweaveset or submit them to the #dropsfan gallery. Do you need help with this pattern?You'll find 13 tutorial videos, a Comments/Questions area and more by visiting the pattern on garnstudio.com. © 1982-2025 DROPS Design A/S. We reserve all rights. This document, including all its sub-sections, has copyrights. Read more about what you can do with our patterns at the bottom of each pattern on our site. |
Post a comment to pattern DROPS 149-40
We would love to hear what you have to say about this pattern!
If you want to leave a question, please make sure you select the correct category in the form below, to speed up the answering process. Required fields are marked *.