Carol Maitland skrev:
Hi I was just answered my question by the Drops Team but my question was not really answered.I understand the increase in the first row,it’s the 4 row increase I do not understand.Where do I do this increase on the 4th row and where do I do the decrease on the 4th row, Thks again Carol.
12.09.2025 - 14:16
Carol Maitland skrev:
Hi I sent a question yesterday,about where to add the extra stitch in the 4 th row.Has not been answered.
10.09.2025 - 18:01
Carol Maitland skrev:
Hi itsays on the shawl to increase every 4th row,where do I do this and when I decrease where do I do that. Thks Carol.c
09.09.2025 - 21:05DROPS Design svarede:
Hi Carol, After the first 14 rows, you work 4 new rows which are then repeated onwards increasing 1 stitch in the first stitch after the marker-thread on the first of these 4 rows. The decreases begin after the short rows, and again 1 stitch is decreased straight after the marker-thread on the first of the 4 rows which are repeated onwards. Regards, Drops Team.
12.09.2025 - 11:03
Carol Maitland skrev:
Then it says repeat 1st to 4th row,so every 4th row I add a stitch,where at the beginning. sorry my keyboard keys were stuck,thks Carol Maitland
15.08.2025 - 19:56DROPS Design svarede:
Dear Mrs Maitland, work as previously explained under rows 1-4: you will increase 1 stitch just after A.1 on first row = you will increase 1 stitch on every 4th row. Happy knitting!
18.08.2025 - 08:15
Carol Maitland skrev:
Hi I currently working on this pattern,have some questions. Row 2 on second part says knit until marker then A1 over the next 12 stitches,does this mean I purl them because the pattern says to purl from the wrong side. Row 3,is this the cable row.so I put 6 cable stitches at back and knit the next 6 then do the cable stitches,but have noticed that the beginning of my working yarn is at the cable end.Do I carry it at the back before knitting the 6 stitches on the cable needle.
15.08.2025 - 19:52DROPS Design svarede:
Dear Mrs Maitland, from wrong side you will purl the stitches of A.1, on 3rd row start diagram - see in this video how to work this diagram and how to work the cable at the beginning of the row. Happy knitting!
18.08.2025 - 08:13
Renate Huber skrev:
Sehr schön gefällt mir ausgezeichnet
03.09.2024 - 15:54
Monique skrev:
Une fois le produit fini, avec la même laine et j'ai obtenu un châle beaucoup trop long par rapport à sa largeur. Il faut peut être faire des augmentations plus rapides pour avoir un châle plus large.
09.03.2023 - 09:08
Alejandra Estela Sotelo Sotelo skrev:
A ver si entiendo bien, en el ancho maximo o pico del chal, para que la trenza no quede tirante, hay que hacer tres vueltas o hileras antes de empezar a disminuir? Desde ya muchas gracias y hermosos todos sus modelos. Una maravilla
21.07.2022 - 17:29DROPS Design svarede:
Hola Alejandra, * Trabajar 2 filas de ida y vta sobre los 12 pts de A.1, trabajar 2 filas de ida y vta sobre todos los pts de la fila como antes pero sin aumentos *, repetir de *a* un total de 3 vcs, ahora trabajar 2 filas de ida y vta sobre los 12 pts de A.1 otra vez. Ahora trabajar y dism ... Buen trabajo!
22.07.2022 - 21:52
Carol Maitland skrev:
Hi,another question if you don’t mind.besides the wool air and wish,what other yarn do you recommend with 1 strand.thks carol.
03.06.2022 - 15:10DROPS Design svarede:
Dear Mrs Maitland, you can use any other yarn group E or 2 strands yarn group C - use our yarn converter to see some alternatives as well as the new amount of yarn. Happy knitting!
03.06.2022 - 16:07
Carol Maitland skrev:
Hi,I have a question about this pattern,actually the chart.have never knitted from a chart before,any guidelines. Where the lines are in diagram a1 this is where you do the cables right.will hv more questions as I progress. Thks,hv a great day.carol
03.06.2022 - 15:02DROPS Design svarede:
Dear Mrs Maitland, you will read more about diagrams here - and maybe this video will help you to understand even better how to read diagrams and how to work the cable. Happy knitting!
03.06.2022 - 16:06
Winter Cozy#wintercozyset |
|||||||
![]() |
![]() |
||||||
Sættet består af: Strikket hue og sjal i ”DROPS Cloud” eller "Air" strikket fra side til side med retstrik og snoningskant
DROPS 172-10 |
|||||||
HUE: INDTAGNINGSTIPS: Ta 1 m løs af p som om den skulle strikkes ret, 1 ret, løft den løse m over. ---------------------------------------------------------- HUE: Slå 56-60 m op på rundp 7 med 1 tråd Cloud eller 2 tråde Air. Strik 4 omg glatstrik (= rullekant). Næste omg strikkes således: * 1 ret, 1 vrang *, gentag fra *-* omg rundt. Strik 1 omg til med ret over ret og vrang over vrang. Fortsæt i glatstrik til færdigt mål. HUSK PÅ STRIKKEFASTHEDEN! Når arb måler 21-22 cm sættes der 8-10 mærker i arb med 7-6 m mellem hver. På næste omg tages der 1 m ind efter hvert mærke – læs INDTAGNINGSTIPS (= 8-10 m taget ind). Tag ind således på hver 2.omg totalt 3 gange og derefter på hver omg totalt 2 gange. På næste omg strikkes alle m drejet ret sammen to og to = 8-5 m tilbage på p. Klip tråden, træk den gennem de resterende m, træk sammen og hæft godt. Huen måler ca 26-27 cm fra toppen og ned (inkl rullekanten). ---------------------------------------------------------- SJAL: STRIKKETIPS: Sjalet strikkes i retstrik med en snoning langs nederste kant. Denne snoning strikkes over de yderste 12 m. For at snoningen skal blive fyldig og "rulle" sig strikkes der ingen kantm yderst (dvs yderste m i A.1 strikkes som en almindelig m glatstrik både fra retsiden og fra vrangen). MØNSTER: Se diag A.1. Diag viser alle p i mønsteret set fra retsiden. MÅLETIPS: Sjalet måles langs den lige kant uden ud/indtagning. ---------------------------------------------------------- SJAL: Sjalet strikkes fra side til side. Slå 3 m op på rundp 8 med Cloud eller 2 tråde Air og strik således: 1.P (= retsiden): Strik ret. 2.P (= vrangen): 2 ret, strik 1 ret foran og bag i næste m = 4 m på p. 3.P (= retsiden): 1 ret, slå om, 3 ret = 5 m. 4.P (= vrangen): 3 ret, strik omslaget drejet vrang, 1 vrang. 5.P (= retsiden), 2 ret, slå om, 3 ret = 6 m. 6.P (= vrangen): 3 ret, strik omslaget drejet vrang, 2 vrang. 7.P (= retsiden), 3 ret, slå om, 3 ret = 7 m. 8.P (= vrangen), 3 ret, strik omslaget drejet vrang, 3 vrang. 9.P (= retsiden): 4 ret, slå om, 3 ret = 8 m. 10.P (= vrangen): 3 ret, strik omslaget drejet vrang, 4 vrang. 11.P (= retsiden): 5 ret, slå om, 3 ret = 9 m. 12.P (= vrangen): 3 ret, strik omslaget drejet vrang, 5 vrang. 13.P (= retsiden): Strik 1 ret foran og bag i hver af de 6 første m, sæt 1 mærketråd, strik 3 ret = 15 m. 14.P (= vrangen): 3 ret, mærketråd, 12 vrang. Videre strikkes der og tages ud således – læs STRIKKETIPS og HUSK PÅ STRIKKEFASTHEDEN: 1.P (= retsiden): Strik mønster efter diag A.1 over de første 12 m, strik 2 m i første m efter mærketråden og strik ret p ud (= 1 m taget ud). 2.P (= vrangen): Strik ret frem til mærketråden og A.1 over de sidste 12 m. 3.P (= retsiden): A.1 over de første 12 m, mærketråd, strik ret p ud. 4.P (= vrangen): Strik ret frem til mærketråden og A.1 over de sidste 12 m. Gentag 1.- 4.p (dvs der tages 1 m ud på hver 4.p) til der er 56 m på p. Arb måler nu ca 81 cm – læs MÅLETIPS. Nu strikkes der forkortede p for at undgå at snoningen bliver stram over spidsen således: * Strik 2 p frem og tilbage over de 12 m i A.1, strik 2 p frem og tilbage over alle m på p som før, men der tages ikke ud *, gentag fra *-* totalt 3 gange, derefter strikkes der 2 p frem og tilbage over de 12 m A.1 igen. Videre strikkes der og tages ind således: 1.P (= retsiden): Strik mønster efter diag A.1 over de første 12 m, strik de 2 første m efter mærketråden ret sammen og strik ret p ud (= 1 m taget ind). 2.P (= vrangen): Strik ret frem til mærketråden og A.1 over de sidste 12 m. 3.P (= retsiden): A.1 over de første 12 m, mærketråd, strik ret p ud. 4.P (= vrangen): Strik ret frem til mærketråden og A.1 over de sidste 12 m. Gentag 1.- 4.p (dvs der tages 1 m ind på hver 4.p) til der er 15 m tilbage på p (arb måler nu ca 159 cm). Fortsæt således: 1.P (= retsiden): Strik alle m i A.1 ret sammen 2 og 2, mærketråd, 3 ret = 9 m tilbage på p. 2.P (= vrangen): 3 ret, 6 vrang. 3.P (= retsiden): 4 ret, 2 ret sammen, 3 ret = 8 m. 4.P (= vrangen): 3 ret, 5 vrang. 5.P (= retsiden), 3 ret, 2 ret sammen, 3 ret = 7 m. 6.P (= vrangen): 3 ret, 4 vrang. 7.P (= retsiden), 2 ret, 2 ret sammen, 3 ret = 6 m. 8.P (= vrangen), 3 ret, 3 vrang. 9.P (= retsiden): 1 ret, 2 ret sammen, 3 ret = 5 m. 10.P (= vrangen): 3 ret, 2 vrang. 11.P (= retsiden): 2 ret sammen, 3 ret = 4 m. 12.P (= vrangen): 4 ret. 13.P (= retsiden): 2 ret sammen, 2 ret. 14.P (= vrangen): Luk af med ret. |
|||||||
Diagram forklaring |
|||||||
|
|||||||
![]() |
|||||||
Har du lavet denne opskrift?Så tagger du dine billeder med #dropspattern #wintercozyset eller send dem til #dropsfan galleriet. Behøver du hjælp med opskriften?Du finder 25 instruktionsvideoer, kommentarer/spørgsmål og mere i opskriften på www.garnstudio.com © 1982-2025 DROPS Design A/S. Alle rettigheder er reserveret. Dette dokument med tilhørende underdokumenter har copyright. Læs mere om hvad du kan gøre med vore opskrifter, nedert i alle vore opskrifter på hjemmesiden. |
Kommentere opskrift DROPS 172-10
Vi vil gerne høre din mening om denne model!
Hvis du ønsker at stille et spørgsmål, så husk at vælge rigtig kategori i menuen under - det vil give dig hurtigere svar. Obligatoriske felter er markeret med *.