Kim Conway kirjutas:
Ok need some clarification on armholes and increase. After the round that I made the armholes, the next round says to do 6 dc groups in each armhole. If I am to be increasing evenly around, is there a chance there will be more than 6 dc groups in the armhole? Or do I not increase in the armhole doubles and just increase before and after the armholes evenly? Thanks, Kim
25.08.2021 - 21:56DROPS Design vastas:
Dear Mrs Conway, after the round with chains for armholes, continue working pattern as before (= as if there were no chains over armhole) and increase evenly over whole round, ie including in the armholes. Happy crocheting!
26.08.2021 - 08:51
Debra Pearse kirjutas:
No matter how much I try, my brain just doesn't compute diagrams. Is there an actual plain written pattern available? Cheers Deb
03.08.2021 - 07:19DROPS Design vastas:
Hi Debra, Sadly there is no written pattern for this jacket at the moment. Hope you can find a pattern you can use. Regards, Drops Team.
03.08.2021 - 08:42
Donatella kirjutas:
Posso fare questo modello con filato più sottile ed uncinetto del 3.5?
06.07.2021 - 00:32DROPS Design vastas:
Buonasera Donatella, questo modello richiede una tensione di 13 m.a x 8 righe. Se la sua tensione risulta differente otterrà un risultato diverso da quello proposto nella foto. Buon lavoro!
07.07.2021 - 18:13
Lilian González Guajardo kirjutas:
Es muy difícil poco claro y enredado si van a subir los patrones que se entiendan minimo🤔
30.06.2021 - 05:41
Tina Blaschke kirjutas:
Hallo, ich habe leider nicht ganz die anleitung zum häkeln der armlöcher verstanden. stehe jetzt an dem punkt wo ich a2 fertig habe und mich über den nächsten teil wagen sollte, aber nicht ganz klar ist, wie das zu häkeln ist. bis zu 1. reihe a3 kann ich noch folgen, aber wie/wo/wann beginne ich mit den armlöchern? vielleicht könntest du mir das noch etwas genauer erläutern? danke tina
10.05.2021 - 18:10DROPS Design vastas:
Liebe Tina, um die Armlöchern zu häkeln werden Sie D-Stb-Gruppen überspringen und diese Maschen durch Lm-ketten (30-33-36 Lm) ersetzen, so haben Sie 2 Löcher für die Ärmel. Das 1. Armloch häkeln Sie am Anfang der Runde = 30-33-36 Lm häkeln und 5-6-7 D-Stb-Gruppe überspringen, und das 2.Armloch nach 8-14-22 wietere Lm-Bogen (von *bis* wiederholen), dh die Runde genauso wie beschrieben häkeln. Bei der 2. Runde häkeln Sie A.3 weiter gleichzeitig nehmen Sie wie zuvor zu, dh auch in die Lm-Bogen zunehmen, damit Sie am Ende dieser 2. Runde 36 oder 45 Stb Gruppen haben. Viel Spaß beim häkeln!
11.05.2021 - 07:31
Sheri kirjutas:
Your pattern mentions to check gauge, but I don't see a gauge listed anywhere in the English pattern! Could you please provide it, or tell me where to find it? Also, do you have approximate finished measurements for your sizes? Due to sizing differences between patterns, I am unsure if I should make the S/M or L/XL. Thank you!
09.05.2021 - 01:50DROPS Design vastas:
Dear Sheri, the gauge is given at the material list, right next to the hook sizes. " DROPS CROCHET HOOK SIZE 5.5 mm – or size needed to get 13 tr x 8 rows = 10 x 10 cm". Happy Crafting!
09.05.2021 - 13:42
Christiane Wiezorke kirjutas:
Hi, I have wool with a run length of 250m/100g that I really want to use for this wonderful pattern. How do I convert the numbers? Does anyone have an idea? Thanks.
29.03.2021 - 11:21DROPS Design vastas:
Dear Mrs Wiezorke, We are unfortunately not able to adjust each pattern to each individual request. Please contact the store where you bought the yarn for any further individual assistance. Thanks for your comprehension.
06.04.2021 - 08:48
Katya kirjutas:
Buongiorno. Ha provato a seguire lo schema ma non mi è chiaro come devo procedere con le maniche. Può gentilmente aiutarmi? Grazie
27.02.2021 - 14:03DROPS Design vastas:
Buonasera Katya, quale parte delle maniche le crea difficoltà? Buon lavoro!
27.02.2021 - 19:26
Gloria kirjutas:
No es muy exacto el patrón, yo decidí hacerle ajustes, porque las explicaciones son confusas y cuando vi la cantidad de preguntas, me quedo claro que hay problemas con la explicación. Yo hice el círculo hasta obtener el ancho de espalda y luego tejí cadenas que para hacer las sisas y una vez las cerré, recomencé la puntada, porque no cuadra fácilmente con las explicaciones. Creo que quien las escribe, no diseño el tejido
16.02.2021 - 05:25
Natalie kirjutas:
I have crocheted a few round rows, the last round I crocheted had the long chains that skipped groups in order to make sleeves. However moving in to the next several rounds has me confused. Should the rounds after the sleeves include working the chains that previously made the sleeve and skipping that same section that was skipped when making the sleeve chain, or should I skip the chain and work the Part that was skipped over for the chain sleeve as part of the round. Or should I work both.
08.02.2021 - 06:13DROPS Design vastas:
Dear Natalie, for the armholes you are skipping stitches replaced by chains on both places on the round. After this round has been worked, you will crochet in the round as before, ie crochet in both ch-spaces for armholes as they were stitches and no holes so that the pattern will continue as before. Hope this will help. Happy crocheting!
08.02.2021 - 11:04
Fall Festival#fallfestivaljacket |
||||||||||||||||||||||||||||||||||||||||||||||
![]() |
![]() |
|||||||||||||||||||||||||||||||||||||||||||||
DROPS Big Delight või DROPS Fabel ja DROPS Flora lõngadest ringselt heegeldatud ratasjakk suurustele S kuni XXXL
DROPS 171-21 |
||||||||||||||||||||||||||||||||||||||||||||||
|
MUSTER Vaata skeeme A.1 kuni A.5. HEEGELDAMISE INFO Asenda esimene kinnissilmus (ks) ringi alguses 1 ahelsilmusega, lõpus tee 1 aass esimesse ahels-sse ringi alguses. Asenda esimene ühekordne sammas (sm) ringi alguses 3 ahelsilmusega, lõpus tee 1 aass kolmandasse ahels-sse ringi alguses. Asenda esimene kahekordne sammas (2xsm) ringi alguses 4 ahelsilmusega, lõpus tee 1 aass neljandasse ahels-sse ringi alguses. ------------------------------- RATASJAKK Heegelda 4 ahels 5,5 mm heegelnõelaga ja Big Delight (või DROPS Fabel ja DROPS Flora) lõngaga, ühenda ringiks 1 aassilmusega esimesse ahels-sse. Siis heegelda skeemi A.1. LOE HEEGELDAMISE INFOT! JÄLGI HEEGELDAMISE TUGEVUST! Kui skeem A.1 on tehtud, on ringi läbimõõt u. 33 cm ja viimasel ringil on 27 2xsm-gruppi. SUURUSED L/XL - XXL/XXXL Heegelda vastavalt skeemile A.2, skeemi A.2 esimesel ringil kasvata 9 ahels-kaart ühtlaste vahedega (kasvata samamoodi nagu skeemi A.1 6. ringil, kasvata 1 ahels-kaar nii: tee 1 ks ümber ahels-kaare 2xsm-grupi keskel, 9 ahels, 1 ks ümber ahels 2xsm-gruppide vahel, 9 ahels, 1 ks ümber ahels-kaare järgmise 2xsm-grupi keskel) = 36-36 ahels-kaart. Heegelda skeemi A.2 1 kord vertikaalselt. KÕIK SUURUSED = 27-36-36 2xsm-gruppi. Heegelda järgmine ring nagu 1. ring skeemil A.3, SAMAL AJAL tee käeaugud nii: tee 1 ks ümber ahels-kaare 2xsm-grupi keskel, tee 30-33-36 lõtva ahels, jäta vahele 5-6-7 2xsm-gruppi, 1 ks ümber ahels-kaare järgmise 2xsm-grupi keskel (käeauk on tehtud), * 12 ahels, 1 ks ümber ahels-kaare 2xsm-grupi keskel *, korda * kuni * 8-14-12 korda kokku. Tee 30-33-36 lõtva ahels, jäta vahele 5-6-7 2xsm-gruppi, 1 ks ümber ahels-kaare järgmise 2xsm-grupi keskel (teine käeauk on tehtud), * 12 ahels, 1 ks ümber ahels-kaare 2xsm-grupi keskel *, korda * kuni * tervel ringil ja lõpus tee 1 aass esimesse ks-sse ringi alguses (mitte 1 ks ümber järgmise ahels-kaare). Heegelda järgmine ring nagu 2. ring skeemil A.3 nii: heegelda nagu enne, tehes 2 sm + 2 ahels + 2 sm ümber iga ahels-kaare, ümber iga ahels-kaare käeaugus tee 6-7-8 sm-gruppi, SAMAL AJAL kasvata 9 sm-gruppi ühtlaste vahedega ringil, kasvata 1 sm-grupp, tehes 2 sm + 2 ahels + 2 sm + 2 sm + 2 ahels + 2 sm ümber 1 ahels-kaare = 36-45-45 sm-gruppi. 3. RING: tee 2 2xsm + 2 ahels + 2 2xsm ümber ahels-kaare iga sm-grupi keskel ja 1 ahels iga 2xsm-grupi vahele = 36-45-45 2xsm-gruppi ja 1 ahels nende vahel. Jätka heegeldamist skeemi A.3 järgi, SAMAL AJAL kasvata 9 ahels-kaart ühtlaste vahedega iga kord kui teed 1. ringi, nii: 1. RING: tee aassilmuseid kuni esimese ahels-kaare keskele (2xsm-grupi keskel), 1 ks, * 12 ahels, 1 ks ümber järgmis ahels-kaare 2xsm-grupi keskel *, korda * kuni * tervel ringil, SAMAL AJAL kasvata 9 ahels-kaart ühtlaste vahedega ringil = 45-54-54 ahels-kaart (ringi lõpus tee 6 ahels ja 1 3xsm esimesse ks-sse ringi alguses). 2. RING: tee 2 sm + 2 ahels + 2 sm ümber iga ahels-kaare tervel ringil = 45-54-54 sm-gruppi. 3. RING: tee 2 2xsm + 2 ahels + 2 2xsm ümber iga ahels-kaare sm-grupis ja 1 ahels iga 2xsm-grupi vahele tervel ringil = 45-54-54 2xsm-gruppi ja 1 ahels nende vahel. Korda 1. - 3. ringi veel 3-3-4 korda, SAMAL AJAL kasvata 9 ahels-kaart iga kord tehes 1. ringi = 72-81-90 2xsm-gruppi. Et jakk oleks ovaalse kujuga, heegelda edasi-tagasi ainult alumise 47-54-61 2xsm-grupi kohale, ära heegelda keskmise 25-27-29 2xsm-grupi kohale kaela taga. Alusta töö PP pool ja korda 1.-3. rida skeemil A.3 nagu enne 2 korda kokku (st. seljaosa on 6 rida pikem). Et pöördekohad jääks kenad, heegelda nagu skeemil A.4 ja A.5, SAMAL AJAL kasvata 7 ahels-kaart iga kord, kui teed 1. rida (= 86-95-104 2xsm-gruppi kokku ringil, k.a. 2xsm-gruppi kaela pool). Lõpuks tee 1 ring ahels-kaari ümber terve jaki ääre (töö PP pool) nii: * 4 ahels, 1 ks ümber ahels-kaare 2xsm-grupi keskel, 4 ahels, 1 ks enne järgmist 2xsm-gruppi *, korda * kuni * tervel ringil, katkesta ja kinnita lõng. VARRUKAS Tee 60-66-72 sm ümber käeaugu (u. 5 sm igasse 2xsm-gruppi ja u. 30-33-36 sm ümber ahels-kaare – alusta kaenlaaugust). Heegelda järgmine ring nii: * 1 sm esimesse/järgmisesse sm-sse, 1 ahels, jäta vahele 1 sm *, korda * kuni * tervel ringil = 30-33-36 sm + 30-33-36 ahels. Jätka nii: 1. RING: * 6 ahels, jäta vahele 5 s, 1 ks järgmisesse silmusesse *, korda * kuni * tervel ringil = 10-11-12 ahels-kaart. 2. RING: tee 2 sm + 2 ahels + 2 sm ümber iga ahels-kaare tervel ringil = 10-11-12 sm-gruppi. 3. RING: tee 2 2xsm + 2 ahels + 2 2xsm ümber iga ahels-kaare sm-grupis ja 1 ahels iga 2xsm-grupi vahele tervel ringil = 10-11-12 2xsm-gruppi ja 1 ahels nende vahel. 4. RING: * 12 ahels, 1 ks ümber ahels-kaare 2xsm-grupi keskel *, korda * kuni * tervel ringil = 10-11-12 ahels-kaart, aga SAMAL AJAL kahanda 1 ahels-kaare ringil kaenlaaugus nii: 1 ks ümber ahels-kaare ringi eelviimase 2xsm-grupi keskel, 6 ahels, 1 sm ümber ahels-kaare 2xsm-grupi keskel ?, 6 ahels, 1 ks ümber ahels-kaare järgmise 2xsm-grupi keskel). Järgmisel ringil tee kaenlaaugu keskel sm-grupp sambasse kahe 6-ahels-kaare vahel = 9-10-11 sm-gruppi. Korda 2.-4. ringi ja kahanda SAMAL AJAL 1 ahels-kaar igal 3. ringil, nii et ringil on 1 2xsm-grupp/ahels-kaar vähem. Kui ringil on 5-6-7 2xsm-gruppi/ahels-kaart, heegelda kahandamiseta, kuni töö pikkus on 54-54-56 cm, või soovitud pikkusega, proovi jakki selga. Katkesta ja kinnita lõng. Korda teisel varrukal. |
||||||||||||||||||||||||||||||||||||||||||||||
Skeemi seletused |
||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||||||||||||||||||||
Kas oled teinud seda mustrit?Lisa oma piltidele viide #dropspattern #fallfestivaljacket või saada link projektile meie #dropsfan galeriisse. Vajad abi selle mustriga?Garnstudio.com kodulehel on 7 õppevideot, küsimuste/vastuste osa ja muudki. © 1982-2025 DROPS Design A/S. Kõik õigused kaitstud. See dokument, ning selle alajaotused on kaitsud autoriõigustega. Loe rohkem, mida meie mustritega võib teha, iga mustrilehe alt meie kodulehel. |
||||||||||||||||||||||||||||||||||||||||||||||
Jäta kommentaar mustrile DROPS 171-21
Ootame kommentaare selle mustri kohta!
Kui soovid midagi küsida, siis kiiremaks vastuse saamiseks veendu, et valid õige kategooria alloleval formil. Vajaliku väljad *.