Bea Janssens wrote:
Ik begrijp de beschrijving van de muts niet helemaal. Je moet na 24 cm beginnen met patroon A2, over elke A1? Wanneer begin je met minderen?
17.01.2022 - 18:09DROPS Design answered:
Dag Bea,
Klopt, je breit A.2 over elke A.1 in de breedte. De minderingen zijn verwerkt in A.2, dus als je A.2 gewoon volgt, minder je vanzelf. Als je A.2 helemaal klaar is brei je nog eens alle steken twee aan twee samen zoals aangegeven in de beschrijving.
21.01.2022 - 09:26
Maude Bouchard wrote:
Est-ce que le rang de montage mentionné dans la section sur le bonnet commence au début de l’ouvrage ou est-ce que ça commence au changement d’aiguille?
01.12.2021 - 18:16DROPS Design answered:
Bonjour Mme Bouchard, le rang de montage mentionné correspond au rang où vous montez les mailles au tout début du bonnet. Bon tricot!
02.12.2021 - 09:23
Patricia Thibert wrote:
Chaleur et élégance
03.08.2021 - 17:22
Lace Falls Set#lacefallsset |
||||||||||||||||
![]() |
![]() |
|||||||||||||||
Knitted hat and mittens in DROPS Puna or DROPS Daisy, with cables.
DROPS 225-40 |
||||||||||||||||
------------------------------------------------------- EXPLANATIONS FOR THE PATTERN: ------------------------------------------------------- PATTERN: Hat: See diagrams A.1 and A.2. Mittens: See diagram A.3. INCREASE/DECREASE TIP (evenly spaced): To work out how to increase/decrease evenly, count the total number of stitches on needle (e.g. 124 stitches), and divide by the number of increases/decreases to be made (e.g. 6) = 20.6. In this example, increase by making 1 yarn over after alternately each 20th and each 21st stitch (approx.). On the next round knit the yarn overs twisted to avoid holes. When decreasing, knit together alternately each 19th and 20th stitch and each 20th and 21st stitch (approx.). INCREASE TIP (mittens): Work to the marker-stitch, make 1 yarn over, knit 1 (= marker-stitch), 1 yarn over (= 2 stitches increased). On the next round knit the yarn overs twisted to avoid holes. The next increase is worked as follows: Work until there is 1 stitch left before the marker-stitch, make 1 yarn over, knit 3, 1 yarn over (= 2 stitches increased). Continue to increase like this every 2nd round; i.e. always on the outside of the increased stitches. DECREASE TIP (mittens): Decrease 1 stitch on each side of the marker thread as follows: Work until there are 3 stitches left before the marker thread, knit 2 together, knit 2 (marker thread sits between these 2 stitches), slip 1 stitch as if to knit, knit 1 and pass the slipped stitch over the knitted stitch. ------------------------------------------------------- START THE PIECE HERE: ------------------------------------------------------- HAT – SHORT OVERVIEW OF THE PIECE: The piece is worked in the round with circular needle, bottom up. Change to double pointed needles when necessary. HAT: Cast on 124-132 stitches with circular needle size 3 mm and DROPS Puna or DROPS Daisy. Work rib (knit 2, purl 2) in the round for 14 cm. Knit 1 round where you increase 6-8 stitches evenly spaced – read INCREASE/DECREASE TIP = 130-140 stitches. Change to circular needle size 4 mm. Work stocking stitch in the round for 1-2 cm. Now work pattern A.1 in the round (= 13-14 repeats of 10 stitches). REMEMBER THE KNITTING TENSION! Continue this pattern until the piece measures 24-25 cm from the cast-on edge (there is approx. 8 cm left to finished length; work to desired length) – adjust so you finish after a complete repeat in height. Now work A.2 over each A.1. When A.2 has been completed in height there are 39-42 stitches. Decrease as follows: Knit 1-0, then knit all stitches together 2 and 2 = 20-21 stitches. Knit 1 round. Knit 1-0, then knit all stitches together 2 and 2 = 10-11 stitches. Cut the strand, pull it through the remaining stitches, tighten and fasten well. The hat measures approx. 24-25 cm with 8 cm turn-up. ------------------------------------------------------- MITTENS – SHORT OVERVIEW OF THE PIECE: The piece is worked in the round with double pointed needles. RIGHT MITTEN: Cast on 52-56 stitches with double pointed needles size 3 mm and DROPS Puna or DROPS Daisy. Work rib (knit 2, purl 2) in the round for 6½ cm. Change to double pointed needles size 3.5 mm. Insert a marker at the beginning of the round and work as follows. Knit 8 and increase 0-1 stitch over these stitches, work A.3 over the next 6 stitches, knit 8 and increase 0-1 stitch over these stitches, knit the last 30-34 stitches and decrease 10-12 stitches evenly over these stitches – read INCREASE/DECREASE TIP = 42-46 stitches. Continue with knit and A.3 over the 6 middle stitches on top of the hand. REMEMBER THE KNITTING TENSION! When the piece measures 9 cm, insert a marker in the 23rd-25th stitch (= marker-stitch). Now increase for the thumb by increasing 1 stitch on each side of the marker-stitch – read INCREASE TIP. Increase like this every 2nd round a total of 5-6 times = 11-13 thumb stitches = 52-58 stitches. Continue working without further increases until the piece measures 13-14- cm from the cast-on edge. On the next round place the 11-13 thumb-stitches on a thread, cast on 1 stitch behind the thumb and continue in the round with stocking stitch and pattern = 42-46 stitches. Continue working until the piece measures approx. 20-21 cm (there is 5 cm left to finished length; try the mitten on and work to desired length). Insert 1 marker in each side of the piece, with 8-9 stitches between the markers and A.3 (= 20-22 stitches between the markers under the hand and 22-24 stitches between the markers on top of the hand). Continue the pattern and decrease on each side of both markers – read DECREASE TIP. Decrease like this every 4th round 1 time, every 2nd round 4 times and every round 1 time = 18-22 stitches. When there is not room for the whole cable, work stocking stitch over these stitches. Knit all stitches together 2 and 2 = 9-11 stitches. Cut the strand, pull it through the remaining stitches, tighten and fasten well. The mitten measures approx. 25-26 cm. THUMB: Place the 11-13 thumb-stitches back on double pointed needles size 3.5 mm and knit up 4 stitches behind the thumb = 15-17 stitches. Work stocking stitch in the round until the thumb measures 5-6 cm (there is approx. ½ cm to finished length, try the mitten on and work to desired length). Knit all stitches together 2 and 2 until there are 4 stitches left. Cut the strand, pull it through the remaining stitches, tighten and fasten well. LEFT MITTEN: Cast on 52-56 stitches with double pointed needles size 3 mm and DROPS Puna or DROPS Daisy. Work rib (knit 2, purl 2) in the round for 6½ cm. Change to double pointed needles size 3.5 mm. Insert a marker at the beginning of the round and work as follows. Knit 8 and increase 0-1 stitch over these stitches, work A.3 over the next 6 stitches, knit 8 and increase 0-1 stitch over these stitches, knit the last 30-34 stitches and decrease 10-12 stitches evenly over these stitches = 42-46 stitches. Continue with knit and A.3 over the 6 middle stitches on top of the hand. When the piece measures 9 cm, insert a marker in the last stitch on the round (= marker-stitch). Now increase for the thumb by increasing 1 stitch on each side of the marker-stitch – remember INCREASE TIP. Increase like this every 2nd round a total of 5-6 times = 11-13 thumb stitches = 52-58 stitches. Continue working without further increases until the piece measures 13-14- cm from the cast-on edge. On the next round place the 11-13 thumb-stitches on a thread, cast on 1 stitch behind the thumb and continue in the round with stocking stitch and pattern = 42-46 stitches. Continue working until the piece measures approx. 20-21 cm (there is 5 cm left to finished length; try the mitten on and work to desired length). Insert 1 marker in each side of the piece, with 8-9 stitches between both markers and A.3 (= 20-22 stitches between the markers under the hand and 22-24 stitches between the markers on top of the hand). Continue the pattern and decrease on each side of both markers – remember DECREASE TIP. Decrease like this every 4th round 1 time, every 2nd round 4 times and every round 1 time = 18-22 stitches. When there is not room for the whole cable, work stocking stitch over these stitches. Knit all stitches together 2 and 2 = 9-11 stitches. Cut the strand, pull it through the remaining stitches, tighten and fasten well. The mitten measures approx. 25-26 cm. Work the thumb in the same way as for the right mitten. |
||||||||||||||||
Diagram explanations |
||||||||||||||||
|
||||||||||||||||
![]() |
||||||||||||||||
Have you finished this pattern?Tag your pictures with #dropspattern #lacefallsset or submit them to the #dropsfan gallery. Do you need help with this pattern?You'll find 22 tutorial videos, a Comments/Questions area and more by visiting the pattern on garnstudio.com. © 1982-2025 DROPS Design A/S. We reserve all rights. This document, including all its sub-sections, has copyrights. Read more about what you can do with our patterns at the bottom of each pattern on our site. |
Post a comment to pattern DROPS 225-40
We would love to hear what you have to say about this pattern!
If you want to leave a question, please make sure you select the correct category in the form below, to speed up the answering process. Required fields are marked *.