DROPS / 192 / 15

Granite by DROPS Design

Knitted skating hat in DROPS Big Delight. The piece is worked in garter stitch with pom pom

Tags: hats, headwear, helm,

DROPS Design: Pattern no db-093
Yarn group C or A + A
-------------------------------------------------------

SIZES:
S/M – M/L – L/XL
Fits head size: approx. 54/56 – 56/58 – 58/60 cm.

MATERIALS:
DROPS BIG DELIGHT from Garnstudio (belongs to yarn group C)
100-100-100 g colour 13, grey

KNITTING TENSION:
17 stitches in width and 33 rows in height with garter stitch = 10 x 10 cm.

NEEDLES:
DROPS NEEDLES SIZE 5 MM.
Needle size is only a guide. If you get too many stitches on 10 cm, change to a larger needle size. If you get too few stitches on 10 cm, change to a smaller needle size

Have you knitted/crocheted this or any other of our designs? Tag your pictures in social media with #dropsdesign so we can see them!

Want to use a different yarn? Try our yarn converter!
Not sure which size you should choose? Then it might help you to know that the model in the picture is approx. 170 cm and uses size S or M. If you are making a jumper, cardigan, dress or similar garment, you will find a graphic with the measurements of the finished garment (in cm) at the bottom of the pattern.
Comments (0) FAQ

100% Wool
from 4.60 £ /100g
DROPS Big Delight print DROPS Big Delight print 4.60 £ /100g
Wool Warehouse Direct Ltd
Order
DROPS Needles & Hooks
You can get the yarn to make this pattern from 4.60£. Read more.

Pattern instructions

NOTE: This pattern is written in British English. All measurements in charts are in cm. For conversion from cm to inches - click here. There are different terms for crocheting in British and American English. If this pattern includes crochet, click for "crochet terms" here. For this pattern in American English, please click here.
-------------------------------------------------------

EXPANATIONS FOR THE PATTERN:

-------------------------------------------------------

RIDGE/GARTER STITCH (worked back and forth):
Knit all rows.
1 ridge in height = Knit 2 rows.

PATTERN:
See diagrams A.1 to A.5. Diagram A.5 shows assembly.

-------------------------------------------------------

START THE PIECE HERE:

-------------------------------------------------------

HAT - SHORT OVERVIEW OF THE PIECE:
The piece is worked back and forth and then sewn together mid back – see diagram A.5.

HAT:
The piece is worked in GARTER STITCH – read description above.
Cast on 31-33-35 stitches with needle size 5 mm and Big Delight. Work 3 ridges.
Then work as follows (first row in each diagram = right side):
* Work A.1 over the first 2 stitches (= 1 stitch increased), knit until there are 4 stitches left and finish with A.2 over the last 4 stitches (= 1 stitch decreased) *, work from *-* a total of 11 times. REMEMBER THE KNITTING TENSION!
* Knit until there are 4 stitches left and finish with A.2 over these 4 stitches (= 1 stitch decreased) *, work from *-* a total of 2-3-4 times = 29-30-31 stitches on needle.
* Work A.3 over the first 4 stitches (= 1 stitch decreased), knit until there are 2 stitches left and finish with A.4 over the last 2 stitches (= 1 stitch increased) *, work from *-* a total of 11 times.
* Knit until there are 2 stitches left and finish with A.4 over these 2 stitches (= 1 stitch increased) *, work from *-* a total of 4-5-6 times = 33-35-37 stitches on needle.
* Work A.1 over the first 2 stitches (= 1 stitch increased), knit until there are 4 stitches left and finish with A.2 over these 4 stitches (= 1 stitch decreased) *, work from *-* a total of 6 times.
* Knit until there are 4 stitches left and finish with A.2 over these 4 stitches (= 1 stitch decreased) *, work from *-* a total of 2-2-2 times = 31-33-35 stitches on needle.

The piece measures approx. 23½-25-26 cm = middle of hat.

Then work as follows:
* Knit until there are 2 stitches left and finish with A.4 over these 2 stitches (= 1 stitch increased) *, work from *-* a total of 2-2-2 times = 33-35-37 stitches on needle.
* Work A.3 over the first 4 stitches (= 1 stitch decreased), knit until there are 2 stitches left and finish with A.4 over these 2 stitches (= 1 stitch increased) *, work from *-* a total of 6 times.
* Knit until there are 4 stitches left and finish with A.2 over these 4 stitches (= 1 stitch decreased) *, work from *-* a total of 4-5-6 times = 29-30-31 stitches on needle.
* Work A.1 over the first 2 stitches (= 1 stitch increased), knit until there are 4 stitches left and finish with A.2 over these 4 stitches (= 1 stitch decreased) *, work from *-* a total of 11 times.
* Knit until there are 2 stitches left and finish with A.4 over these 2 stitches (= 1 stitch increased) *, work from *-* a total of 2-3-4 times = 31-33-35 stitches on needle.
* Work A.3 over the first 4 stitches (= 1 stitch decreased), knit until there are 2 stitches left and finish with A.4 over these 2 stitches (= 1 stitch increased) *, work from *-* a total of 11 times.
Work 3 ridges. Cast off, but make sure the cast-off edge is not tight. The piece measures approx. 47-50-52 cm.

ASSEMBLY:
See diagram A.5. Sew side A to a, side B to b and side C to c – sew edge to edge with small stitches. Lay cast-on and cast-off edges together, edge to edge (= mid back) and sew together - sew in the outermost loop of the outermost stitch so the seam is flat.

POM POM:
Make a pom pom of approx. 6 cm in diameter and fasten to top of hat.

Diagram

= knit from right side
= knit from wrong side
= between 2 stitches make 1 yarn over; on next row work yarn over twisted to avoid a hole
= knit 2 together
= slip 1 stitch as if to knit, knit 1 and pass slipped stitch over knitted stitch
= knitting direction
= mid top of hat
= mid back
= mid front


There are no comments to this pattern yet! Leave yours below.

Post a comment to pattern DROPS 192-15

We would love to hear what you have to say about this pattern!

If you want to leave a question, please make sure you select the correct category in the form below, to speed up the answering process. Required fields are marked *.