XONDRA BARTON kirjutas:
I am about to hand write the pattern for the Ceramic Tile Blanket. Before I do I thought it best to check if there is one available.
20.06.2023 - 21:22DROPS Design vastas:
Dear Mrs Barton, there is only diagram to the square, no written pattern - but there are 2 videos for this square: Rounds 1 - 6 and Round 7 - 11. Happy crocheting!
21.06.2023 - 08:06
Lena kirjutas:
Hej, Jag vill göra en större pläd, 4X5 rutor, hur mycket garn behöver jag?. Tänkte virka i Paris bomullsgarn, nr 17, 26 och 65.
19.06.2023 - 17:54DROPS Design vastas:
Hej Lena, skulle tro att du behöver ca 700 g till... :)
22.06.2023 - 14:05
XONDRA BARTON kirjutas:
If I want to make more tiles for the blanket to make it bigger, what would the sequence be of the tile layout - 16 /20 or 24 tiles. Have you done a sequence with more tiles. Your help would be greatly appreciated.
18.06.2023 - 18:49DROPS Design vastas:
Dear Xondra, you can mix the sequence and join them as you prefer. If you want to increase it, you should maintain it into a multiple of 4: 16, 20, 24. 24 would be for a blanket double the size. For example, to increase one more column vertically, you should add in each row the square that was missing from that row (1,2,3,4, in that order). For the next columns, you could maintain the previous sequence or just mix them up. Happy crocheting!
18.06.2023 - 19:29
XONDRA BARTON kirjutas:
I have tried to watch the tutorial videos - there is no sound. How do I get sound?
30.05.2023 - 15:33DROPS Design vastas:
Dear Mrs Barton, our videos do not have sound. We are a worldwide company and our videos are watched by people around the world, speaking different languages, many of whom do not understand English. You will have then to read the written pattern and look at the diagram to follow the video for the square. Happy crocheting!
30.05.2023 - 16:10
Linda kirjutas:
Ik ben een beginner met haken. Ik ken een stokje en vaste steek Maar "Stokje om losse" Wat wil dit zeggen?
22.06.2022 - 19:07DROPS Design vastas:
Dag LInda,
Als je een stokje om de losse haakt, dan steek je de haaknaald niet in de losse, maar er omheen.
26.06.2022 - 10:02
Christel Golay kirjutas:
BTW - I just love your site. I just retired and I have decided to take up crocheting again after 30 years! I have found your site very helpful and easy to find what I need. I look forward to hearing an answer to my question that I just posted before this comment. Thanks and all the best, Christel
02.08.2020 - 01:57
Christel Golay kirjutas:
Instead of a 3 x 4 = 12 tile blanket as per this pattern, I want to make a bigger 4 x 6 = 24 tile blanket. Can I just order twice the yarn specified in the pattern, or will I need more/less of the colors to account for more border? I'd appreciate all the help I can get to make sure I order enough yarn! Thanks, Christel
02.08.2020 - 01:53DROPS Design vastas:
Dear Mrs Golay, we are unfortunately not able to adjust every pattern to every single request, please contact your DROPS store - even per mail or telephone - for any individual assistance. Happy crocheting!
03.08.2020 - 08:03
Adela Konjarova kirjutas:
Ahojky hackuji tuto deku a mám pocit že spotřeba bude větší nez je psána ada
29.07.2020 - 22:31
Kasia kirjutas:
Dzień dobry, próbowałam zrobić ze schematu i opisu ale bardzo dzowne rzeczy mi wychodziły. Sięgnęłam do filmu (na szczęście jest)! I okazyje się że to co podajecie w opisie Schematu nie zgadza się z tym co pokazane na filmie. Oczka ścisłe w oczko to półsłupki na filmie, półsłupek w oczko przerabiany jest jak słupek w którym przerabia się od razu 3 oczka po narzuceniu i przeciądnięciu. Czy możecie zweryfikować opis oznaczeń użytych w schemacie? Pozdrawiam, Kasia
27.02.2020 - 07:44DROPS Design vastas:
Witaj Kasiu! W polskim nazewnictwie szydełkowym są 2 różne sposoby nazywania podstawowych ściegów, wiemy, że to mylące, ale dla przejrzystości musieliśmy wybrać i trzymamy się konsekwentnie jednego z nich: a mianowicie nasze oczko ścisłe jest również przez niektórych nazywane oczkiem zamykającym, nie mamy też rozróżnienia między półsłupkiem, a półsłupkiem nawijanym (jak piszesz słupek, w którym przerabia się od razu 3 oczka po narzuceniu i przeciągnięciu). W każdym naszym wzorze na dole znajdziesz filmiki video jak są przerabiane poszczególne ściegi (w kursach drops szczegółowo są opisane te techniki). Poza tym są nagrywane filmy do poszczególnych wzorów, tak aby maksymalnie ułatwić użytkowniczkom pracę. Cieszymy się, że korzystasz z naszych wzorów i serdecznie pozdrawiamy.
28.02.2020 - 08:36
Henriette kirjutas:
Bonjour, merci beaucoup pour votre aide, mon plaid est très beau! En revanche, 4 pelotes entières de Népal gris foncé en trop et plus d'une de naturel....
22.12.2019 - 21:10DROPS Design vastas:
Bonjour Henriette! Merci de nous avoir informe. Cordialement
30.12.2019 - 11:52
Ceramic Tiles#ceramictilesblanket |
||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
![]() |
|||||||||||||||||||||||||||||||||||||||||||||||||||
DROPS Nepal lõngast heegeldatud ruutudega tekk
DROPS 195-39 |
||||||||||||||||||||||||||||||||||||||||||||||||||||
---------------------------------------------------------- NÕUANDED ---------------------------------------------------------- MUSTER Vaata skeeme A.1, A.2, A.3, A.4 ja A.5. RUUTUDE VÄRVID Heegelda 3 ruutu iga värvikombinatsiooniga, värvi vahetades tee eelmise ringi viimane aassilmus uue ringi värviga. Lõngaotsa peitmiseks heegelda see kohe töö sisse. 1. RUUT 1. ring: hall 2. ring: helehall 3. ring: naturaalvalge 4. ring: naturaalvalge 5. ring: helehall 6. ring: hall 7. ring: naturaalvalge 8. ring: helehall 9. ring: helehall 10. ring: naturaalvalge 11. ring: naturaalvalge 2. RUUT 1. ring: naturaalvalge 2. ring: helehall 3. ring: helehall 4. ring: hall 5. ring: helehall 6. ring: hall 7. ring: helehall 8. ring: naturaalvalge 9. ring: naturaalvalge 10. ring: helehall 11. ring: naturaalvalge 3. RUUT 1. ring: helehall 2. ring: naturaalvalge 3. ring: naturaalvalge 4. ring: naturaalvalge 5. ring: helehall 6. ring: helehall 7. ring: hall 8. ring: naturaalvalge 9. ring: naturaalvalge 10. ring: helehall 11. ring: naturaalvalge 4. RUUT 1. ring: naturaalvalge 2. ring: naturaalvalge 3. ring: hall. 4. ring: hall 5. ring: helehall 6. ring: hall 7. ring: helehall 8. ring: naturaalvalge 9. ring: helehall 10. ring: hall 11. ring: naturaalvalge ÄÄRISE VÄRV Vaheta värvi igal ringil, värvi vahetades tee eelmise ringi viimane aassilmus uue ringi värviga. Lõngaotsa peitmiseks heegelda see kohe töö sisse. Heegelda ringe nende värvidega: 1. ring: helehall 2. ring: naturaalvalge 3. ring: helehall 4. ring: hall 5. ring: naturaalvalge HEEGELDAMISE INFO (skeem A.5) 1., 3. ja 4. ringil asenda esimene sümbol (3 ahelsilmust) 6 ahelsilmusega. Need asendavad 3 ahelsilmust ja viimast ühekordset sammast ringil. St. tee ringi lõpus 1 ühekordne sammas vähem, kui näidatud skeemil A.5, ning ringi lõpus tee 1 aassilmus kolmandasse ahelsilmusesse ringi alguses. 2. ja 5. ringil asenda esimene sümbol (3 ahelsilmust) 4 ahelsilmusega. Need asendavad 3 ahelsilmust ja viimast kinnissilmust ringil. St. tee ringi lõpus 1 kinnissilmus vähem, kui näidatud skeemil A.5, ning ringi lõpus tee 1 aassilmus esimesse ahelsilmusesse ringi alguses. ---------------------------------------------------------- ALUSTA SIIT ---------------------------------------------------------- TEKK – KOKKUVÕTE Tekk koosneb ruutudest, tee ruudud 4 erineva värvikombinatsiooniga. Pärast õmmeldakse ruudud kokku ja heegeldatakse ääris ümber terve teki. RUUT Heegelda Nepal lõngaga ja 5 mm heegelnõelaga ruute skeemil A.1 – loe RUUTUDE VÄRVID üleval. JÄLGI HEEGELDAMISE TUGEVUST! Kui kõik ruudud on tehtud, on kokku 12 ruutu. VIIMISTLUS Paiguta ruudud kõrvuti nagu näidatud joonisel. Jälgi, et kõigil oleks töö paremal pool ülespoole. Õmble ruudud kokku silmuse haaval naturaalvalge lõngaga. Katkesta ja kinnita lõng. ÄÄRIS Ja heegelda ääris ümber terve teki. Tee iga ring erinevat värvi – loe ÄÄRISE VÄRV ülevalt. Heegelda skeeme A.2, A.3, A.4 ja A.5 järgmiselt, alusta helehalli lõngaga esimeses nurgas teki lühemal küljel: ** tee skeemi A.2 esimesse nurka ja järgmise 10 kinnissilmuse kohale – loe HEEGELDAMISE INFOT, tee skeemi A.3 järgmised 30 kinnissilmust (= 5 korda), skeemi A.4 ruutude vahele ja järgmiste 5 kinnissilmuse kohale, * skeemi A.3 järgmised 36 kinnissilmust (= 6 korda), skeemi A.4 ruutude vahele ja järgmise 5 kinnissilmuse kohale *, skeemi A.3 järgmised 24 kinnissilmust (= 4 korda), skeemi A.5 järgmise 11 kinnissilmuse kohale ja nurka, tee skeemi A.2 nurka ja järgmise 10 kinnissilmuse kohale, skeemi A.3 järgmised 30 kinnissilmust (= 5 korda), skeemi A.4 ruutude vahele ja järgmise 5 kinnissilmuse kohale, korda * kuni * kokku 2 korda, tee skeemi A.3 järgmised 24 kinnissilmust (= 4 korda), skeemi A.5 järgmised 11 kinnissilmust ja nurka **. 1 pikem külg ja 1 lühem külg on nüüd tehtud. Korda ** kuni ** teisel kahel küljel. Kui skeemid on vertikaalselt, on ääris valmis. Katkesta ja kinnita lõng. |
||||||||||||||||||||||||||||||||||||||||||||||||||||
Skeemi seletused |
||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||
Kas oled teinud seda mustrit?Lisa oma piltidele viide #dropspattern #ceramictilesblanket või saada link projektile meie #dropsfan galeriisse. Vajad abi selle mustriga?Garnstudio.com kodulehel on 13 õppevideot, küsimuste/vastuste osa ja muudki. © 1982-2025 DROPS Design A/S. Kõik õigused kaitstud. See dokument, ning selle alajaotused on kaitsud autoriõigustega. Loe rohkem, mida meie mustritega võib teha, iga mustrilehe alt meie kodulehel. |
Jäta kommentaar mustrile DROPS 195-39
Ootame kommentaare selle mustri kohta!
Kui soovid midagi küsida, siis kiiremaks vastuse saamiseks veendu, et valid õige kategooria alloleval formil. Vajaliku väljad *.