DROPS / 162 / 23

Water Pearl by DROPS Design

DROPS Alpaca lõngast heegeldatud pitsmustriga õlasall

Võtmesõnad: õlasallid, pitsmuster,

DROPSi disain: mudel nr z-698
Lõngagrupp A
----------------------------------------------------------
Mõõdud:
Kõrgus keskel 57 cm
Laius ülaserval u. 174 cm
Lõng: Garnstudio DROPS ALPACA, 50 g/167 m
200 g värv nr 2917, türkiis

DROPSi heegelnõel: 3 mm – või sobiv, et 24 sammast x 13 rida = 10 x 10 cm
-----------------------------------------------------------

Oled teinud selle või mõne meie teise disaini? Lisa oma piltidele sotsiaalmeedias silt #dropsdesign , et me näeksime neid pilte.

Soovid kasutada teist lõnga? Proovi meie lõngamuundurit!
Ei tea millist suurust valida? Pildil olev modell on umbes 170 cm pikk ja kannab suurust S või M. Õige suuruse valimiseks vaata alati valmis eseme mõõtudega joonist (cm) juhendi lõpus.
Kommentaarid (35)

100% alpaka
alates 3.65 € /50g
DROPS Alpaca uni colour DROPS Alpaca uni colour 3.65 € /50g
Must ja roosa OÜ
Telli
DROPS Alpaca mix DROPS Alpaca mix 3.85 € /50g
Must ja roosa OÜ
Telli
Vardad & heegelnõelad
Lõngakulu sellele disainile alates 14.60€. Loe edasi.
MUSTER
Vaata skeeme A.1 kuni A.6.
---------------------------------

ÕLASALL
Heegeldatakse edasi-tagasi alt tipust üles.

Heegelda mustrit vastavalt skeemile A.1 Alpaca lõngaga ja 3 mm heegelnõelaga. JÄLGI HEEGELDAMISE TUGEVUST!
Kui terve skeem A.1 on tehtud vertikaalselt, jätka skeemiga A.3 iga ruudu kohale mustris, SAMAL AJAL jätka kasvatamist mõlemal küljel nagu skeemil A.2.
NB! Heegelda kasvatused skeemil A.2 peegelpildis teisel küljel (skeemil on näidatud ainult vasak pool).
Kui skeem A.3 on tehtud vertikaalselt, jätka skeemiga A.4. NB! Ruudu muster nihkub nagu näha skeemil A.2, st. pool kordust külje poole, nii et võrgumuster ruutude vahel moodustab sik-saki.
Jätka kasvatamist mõlemal küljel nagu skeemil A.1.

Kui skeem A.4 on tehtud vertikaalselt, jätka skeemiga A.5 2 korda vertikaalselt.
Siis koo skeemi A.3, SAMAL AJAL jätka kasvatamist mõlemal küljel nagu skeemil A.2. Nüüd on 3 mustriruutu vertikaalselt.
Kui skeem A.3 on tehtud vertikaalselt, jätka skeemiga A.4. NB! Ruudu muster nihkub nagu näha skeemil A.2 ja nagu varem.
Jätka kasvatamist mõlemal küljel nagu skeemil A.1.
Kui skeem A.4 on tehtud vertikaalselt, jätka skeemiga A.6 1 kord vertikaalselt (1,5 mustriruutu vertikaalselt).

Nüüd heegelda ääris ülaserval nii: heegelda 1 ks igasse sambasse, kuni võrgumustrini, tee * 3 ahels, 1 ks järgmisesse sambasse *, korda *kuni* mööda serva, kuni ainult sambad jäävad eelmisel real, tee 1 ks igasse sambasse.
Katkesta ja kinnita lõng.

Sede mustrit on parandatud. .

Parandatud online: 28.05.2015
Skeem A.1- 1. rida (sm silmusesse, mitte sm ümber ahels-kaare).

Skeem

= ahelsilmus (ahels)
= kinnissilmus (ks) silmusesse allpool
= ks ahels-kaarde allpool
= ühekordne sammas (sm) silmusesse
= sm ümber ahels-kaarde
= 8 ahels
= 4 ahels
= 3 sm kokku - tee 1 sm järgmisesse sambasse, aga ära tee viimast lõnga läbitõmmet (= 2 s heegelnõelal), tee 1 sm igasse järgmisesse 2 sm-sse samamoodi, tõmba lõng läbi kõigi 4 s heegelnõelal
= alusta siit
= kolmekordne sammas (3xsm)




Rohaya 15.05.2019 - 13:00:

The experience after doing the shawl: the charts A1 and A2 are only guidelines of how I must compute the increases at the sides and the guide to the Square motifs. At the row A4-R5 reentering A1 (first A4 phase) had to compute my own stitch increments at the sides. The same during the 2nd phase of A3-A4, had to compute my own stich increments at the sides for diagram A2 , My shawl is turning out nice despite the challenge of the increases.

Rohaya 01.05.2019 - 06:48:

However, is there an error at start A3 Row 2 (Refer chart A2 to do A3) the first five DC : 4th and 5th : would only fall on the 1st to 2nd DC of the earlier Row? This causes much misalignment to continue.

DROPS Design 02.05.2019 kl. 09:35:

Dear Rohaya, at the beg of row 2 in A.2 work (from WS = read from the left towards the right): 8 ch, 1 dc in the dtr, 2 dc around next ch-space, 1 dc in the next dc (= 4 dc), 1 ch, skip 1 dc, 1 dc in next dc, 1 ch, skip 1 dc, 1 dc in each of the next 3 dc, 2 dc in next ch-space, 5 ch, skip next dc, 1 sc in the next 3 dc, 2 ch, then work A.3 beg with 2 ch (= there is now a 5-ch-space at the transition between A.2 and A.3). Happy crocheting!

Rohaya 30.04.2019 - 11:01:

The tutorial video was required for me to start as the A1 chart was not clearly drawn with the start of chain 14 stitches etc. Thank you for the video, the Q&A with the earlier users( I read these and was very helpful) and a beautiful shawl pattern. My shawl is working beautifully.

Susanna 25.05.2018 - 11:58:

Ciao, bellissimo lavoro complimenti. solo una domanda,con quante catenelle devo iniziare? grazie Susanna

DROPS Design 25.05.2018 kl. 12:17:

Buongiorno Susanna. Deve iniziare con 13 catenelle. Buon lavoro!

Veronie Drenthen 17.11.2016 - 11:19:

Vraag; heb A2 klaar en kom daarna niet verder met de zijkanten. Eindig met 6 stokjes, 2 lossen en driedubbel stokje. Waar kan ik vinden wat ik daarna moet? Bij A1 zie je nergens 6 stokjes, 2 lossen enz

DROPS Design 17.11.2016 kl. 14:25:

Hoi Veronie. Je meerdert aan de zijkanten volgens A.2, dus je krijgt steeds nieuwe steken bij die gaandeweg meegaat in het patroon (A.3). Je gaat dus door met de meerderingen zoals beschreven in A.2 met de nieuwe st en de patronen.

Liliana Bisognin 28.05.2016 - 10:37:

Eseguito, molto bello! Grazie per il modello

Szende Ágnes 12.04.2016 - 15:36:

Kedves Drops! Kérnék egy kis segítséget, mert elakadtam a 4-es diagram szaporításánál. A leírás szerint a 2 -es diagram után az 1-es szerint kell szaporítani, de míg a 2-esben 6 erp, 2 lsz, 1 hrp szerepel a sor végén, addig az 1-esben 4 erp, 2 lsz, 1hrp van. Hogy lesz a 6 erp-ből 4? Köszönöm előre is választ. Agnes

DROPS Design 06.11.2016 kl. 16:15:

Kedves Ágnes! A szaporítással a minta fél mintaegységgel elmozdul.

Antonella 29.02.2016 - 13:07:

Buongiorno , ho lavorato senza problemi il diagramma A1 e il diagramma A3 (con diagramma A2 per aumenti ). Ora ho difficoltà con il motivo A4 non mi è chiaro se una parte degli aumenti di questo diagramma è A2 e poi A1 o se gli aumenti sono solo in A1 e da che riga. Inoltre non mi è chiaro cosa si intende che il motivo si sposta di 1/2 ripetizione. Grazie.

DROPS Design 01.03.2016 kl. 10:22:

Buongiorno Antonella. Quando lavora A.4 gli aumenti da seguire sono quelli del diagramma A.1, a partire dalla riga 7. Deve inoltre incolonnare correttamente il motivo, come indicato nel diagramma A.2: verifichi esattamente la posizione delle 3 m.a lavorate nella stessa m rispetto alla 3 m.a lavorate insieme. Con il lavoro sotto e guardando la fotografia, dovrebbe risultarle più chiaro. Buon lavoro!

Antonella 25.02.2016 - 09:44:

Buongiorno, potresti confermarmi che nel diagramma di aumenti A2 ci sono due inizi ( il primo e il quarto ) con 8 catenelle invece di 9 ? grazie

DROPS Design 25.02.2016 kl. 09:59:

Buongiorno Antonella, non ci sono errori nel diagramma A.2. Buon lavoro!

Leonie 10.02.2016 - 20:14:

Goedenavond. Bedankt voor het prachtige patroon. Helaas loop ik vast en zou graag wat hulp willen. Ik heb A3 in de hoogte gehaakt en hierbij A2 gebruikt voor de zijkanten. Nu moet ik bij A4 voor de zijkanten A1 weer gebruiken maar bij de laatste ronde van A2 eindig ik met 6 dst, 2 l, 1 driedb st. Zoek ik deze zelfde ronde op in A1 dan eindig ik met 4 dst, 2l, 1driedb st. Ik zou dus graag weten hoe ik de ronde begin na de laatste toer van A2. Alvast bedankt. Mvg Leonie

Jäta kommentaar mustrile DROPS 162-23

Ootame kommentaare selle mustri kohta!

Kui soovid midagi küsida, siis kiiremaks vastuse saamiseks veendu, et valid õige kategooria alloleval formil. Vajaliku väljad *.