Lianne kirjutas:
Bij de eerst toer loop ik al vast, begrijp echt niet wat hier nu bedoeld wordt…. 1 v=1 v, v in elke 1-3-3-3 l en dan komt er een sterretje. Geen idee. Ik geef het op 😅
16.02.2025 - 08:30
Cindy kirjutas:
I’m sorry I have so many questions about this pattern. When I meet the 11” length, the next Row is to ch 5 loose ch, then do I ch 5 more for the *tr, ch1* to get the 10 chains? At the beginning of Row 1 for the Sleeves, work into the 10th ch from the hook, so there will be 9 chains left over. At the end of Row 1, if I “finish with 1 tr in the first chain at the beg of previous row (the first of the 5 chains worked) I won’t have the extra 9 ch like I do in the beginning of Row 1.
04.09.2024 - 14:26DROPS Design vastas:
Dear Cindy, after you have cut the yarn start with 5 chains (in 2nd, 3rd and 4th size), then work from WS as before: A3, A.2 and A.1 over back piece and finish row with 5 chains (for both armholes). Then on next row = from RS, crochet 5 chains, then work in the 10th chain from hook = the first of the 5 chains you crochet at the end of previous row the 2 tr, 2 ch, 2 tr (these 5 chains are first treble and the last 5 chains are for ch-space), then continue pattern with A.2 anding with 1 tr in the first of the 5 chains you worked at the beg of previous row. Happy crocheting!
05.09.2024 - 09:00
Cindy kirjutas:
I’m working on size XXL with your lovely pattern. On the Back Piece, I get to the 11” length, I don’t have to Fasten Off, because when I turn the piece I am on the WS, is that right? I get stuck on Row 1 at: “and then A.3 the last 1 tr will be in 1st ch on previous Row. Finish with 1 tr in 1st ch on previous Row.” Where do I put the last *2tr, 2ch, 2tr* before I do the last tr in the 1st ch on previous Row? Should the last tr be in the 5th chain?
02.09.2024 - 16:05DROPS Design vastas:
Dear Cindy, you have to adjust the 11" so that the last row was worked from RS so either work one row extra or less, but the last row should have been worked from WS before starting sleeves. Then at the end of the row 1 work the last (2 tr, 2 ch, 2 tr) in A.3 in the first tr on previous row, finish with 1 tr in the first chain at the beg of previous row (the first of the 5 chains worked). Happy crocheting!
03.09.2024 - 09:34
Cindy kirjutas:
Hello, I love the pattern. Obviously I'm not good with graphic patterns. I'm working on the size XXL. I have 86 sc. On Row 1, the graphic pattern looks like it has "ch5, sk4, *2tr, ch2, 2tr*, then (skip 4, *2tr, ch2, 2tr) 14 times until 8 sc left. I can go 15 times and have 10sc left. Can you help me with what I'm going wrong?
25.08.2024 - 16:26DROPS Design vastas:
Dear Cindy, when 10 sc are left, continue as before: skip 4 sc and work the 2 tr, 2 ch, 2 tr in the next sc, then crochet 1 chain and skip 4 then crochet 1 tr in the last sc (so that you have worked the last 4+1+4+1=10 sc). Happy crocheting!
26.08.2024 - 08:29
Seraina Braun kirjutas:
Guten Tag, ich würde gerne dieses Oberteil häkeln verstehe aber folgenden Anleitungsschritt zu Beginn des Rückenteils nicht: "1 fM in jede der nächsten 1-3-1-3 Lm". Bedeutet dies, eine fM in die nächste Lm, dann 2 Lm auslassen und eine fM in die 3. Lm? Beste Grüsse
09.05.2023 - 04:26DROPS Design vastas:
Liebe Frau Braun, da die Luftmaschenkette am Anfang ist oft eng wird man hier mehr Luftmaschen häkeln als man fMaschen braucht, und bei der 1. Reihe werden dann regelmäßig verteilt Luftmaschen übersprungen. Viel Spaß beim häkeln!
09.05.2023 - 07:50
Ina kirjutas:
Geweldig vestje maar heb al aardig wat zitten studeren op het achterpand.. bij de meerderend voor de mouw kan ik het niet meer volgen. Een foto zou zo behulpzaam zijn. Is het mogelijk om ergens een foto te plaatsen van het gebreide achterpand? Want dan kan ik misschien zien of ik het nu wel of niet goed heb gedaan.. ik hoor het graag, bedankt alvast!
24.04.2023 - 19:36DROPS Design vastas:
Dag Ina,
Helaas is er geen foto van het achterpand. Als je begint met de armsgaten dan heb je eerst het werk afgehecht en begin je met een nieuwe draad om lossen mee te haken. Wanneer je deze 10-5-5-5 (10 voor maat S/M, 5 voor de andere maten) hebt gehaakt, dan haak je verder over het zojuist afgehechte achterpand terwijl je gehaakte lossen nog aan je haaknaald bungelen. Aan het eind van de toer haak je weer 10-5-5-5 lossen. Op deze manier heb je aan beide kanten gemeerderd voor de mouwen. In een van de video's onderaan het patroon wordt dit ook uitgelegd.
24.04.2023 - 20:50
Lena kirjutas:
Hej Jeg vil gerne have lange ærmer i jakken. Kan man lave det? Og i så fald hvordan?
08.01.2023 - 18:27DROPS Design vastas:
Hej Lena, du hækler bare flere lm når du kommer til ærmerne, du har 13 dbl-st eller 3 rapporter A.2 på 10 cm i bredden :)
10.01.2023 - 13:42
Gerda kirjutas:
Achterpand heb ik zonder problemen gehaakt. Nu ik met het voorpand ben begonnen kom ik niet uit. Ik haak maat XXL. 1. Volgens mij moet ik start met 65 lossen ipv 64 om tot 52 steken te komen. Ik sla de volgende steken over 1, 6, 11,16,21,36,41,46,51,56,61. Dit zijn totaal 13. 64-13 is 51 ipv 52. 2. Vervolgens haak ik 4xdstk. 8x A2. in de steken 9,14,19,24,29,34,39,44. En 1xA3 in steek 49. Er blijven dan 3 steken over ipv 5 voor de laatst dstk. Wat moet ik doen?
28.12.2021 - 17:56DROPS Design vastas:
Dag Gerda,
Voor het opzetten zou je een paar extra lossen op kunnen zetten. De overgebleven lossen kun je later uithalen. Het gaat erom dat je 47 vasten hebt voor maat xxl voordat je begint aan toer 1. Op toer 1 haak je vervolgens 4 driedubbele stokjes (het eerste driedubbele stokje wordt vervangen door 4 lossen), dan 7 keer A.2 = 35 steken en éen keer A.3 = 8 steken is in totaal 47 steken voor maat xxl.
29.12.2021 - 12:49
Magie kirjutas:
Good afternoon! I am a beginner en really enjoying the pattern. Where is the pattern for the sleeves?
22.05.2021 - 17:22DROPS Design vastas:
Dear Magie, there are no separate sleeves, but stitches are added on, and then cast off to/from the body. Happy Crafting!
23.05.2021 - 02:21
Adri kirjutas:
Het is een moeilijk patroon, d.w.z. de beschrijving is gebrekkig. Ik heb het onderste gedeelte van het achterpand gehaakt en moet nu meerderen maar met deze omschrijving kom ik er niet uit. Je moet 5 lossen haken en dan? Moet je die dan aan het andere haakwerk vastmaken en wat betekent de uitdrukking na de haak? Is dat na de haaknaald? Graag een duidelijke tekening erbij van het meerderen. En wat moet ik doen als ik de mouwen langer wil hebben, moet ik dan meer dan 13 lossen haken?
27.09.2020 - 19:40DROPS Design vastas:
Dag Adri,
Als het goed is ben je aan het einde van een toer aan de goede kant, voordat je begint met het opzetten van steken voor de mouwen. Je haakt dan eerst 5 lossen en haakt dan terug over de verkeerde kant, het betekent dus dat er een herhaling van A.2 bij is gekomen met de 5 extra lossen. Aan het eind van de toer haak je weer 5 lossen extra. Op deze manier maak je een mouw. Voor de grotere maten moet je wat tussen de sterretjes staat nog een keer herhalen. Als je de mouw langer wilt maken, zul je meer steken aan het eind op moeten zetten in een meervoud van 5 steken.
20.11.2020 - 11:52
Verano#veranocadigan |
|||||||||||||||||||
|
|||||||||||||||||||
DROPS ”Cotton Merino” lõngast heegeldatud pitsmustiga jakk. Suurused S - XXXL.
DROPS 153-14 |
|||||||||||||||||||
HEEGELDAMISE INFO Asenda iga rea esimene kahekordne sammas (2xsm) 4 ahelsilmusega. MUSTER Vaata skeeme A.1 - A.5. HEEGELDAMISE NIPP Skeemide A.4 ja A.5 esimene rida tehakse ainult hõlmadel, mitte seljaosal. NÖÖPAUGUD Ära tee nööpauke, vaid õmble nööbid vasakule hõlmale ja nööpaukudena kasuta parema hõlma kahe samba vahet. Õmble nööbid alates ülesloomise servast järgmistele kaugustele: SUURUS S/M: 12, 20, 28, 36 ja 44 cm. SUURUS L/XL: 14, 22, 30, 38 ja 46 cm. SUURUS XXL: 10, 20, 30, 40 ja 50 cm. SUURUS XXXL: 12, 22, 32, 42 ja 52 cm. --------------------------- SELJAOSA Heegeldatakse edasi-tagasi. Tee 83-95-108-120 ahels. Heegelda esimene rida järgmiselt, töö PP: 1 kinnissilmus (ks) teise ahels-sse heegelnõelast = 1 ks, 1 ks igasse järgmisesse 1-3-1-3 ahels-sse, *jäta vahele 1 ahels, 1 ks igasse järgmisesse 4 ahels-sse*, korda *kuni* 16-18-21-23 korda = 66-76-86-96 ks. Jätka heegeldamist järgmiselt: 1. RIDA (= töö PP): heegelda 1 kord skeemi A.1, siis tee skeemi A.2 kuni jääb 8 ks (= 10-12-14-16 korda laiusesse) ja lõpus tee 1 kord skeemi A.3. JÄLGI KOETIHEDUST! 2. RIDA (= töö PH): pööra tööd ja heegelda 1 kord skeemi A.3, skeemi A.2 (= 10-12-14-16 korda laiusesse), 1 kord skeemi A.1. 3. RIDA (= töö PP): pööra tööd ja heegelda 1 kord skeemi A.1, skeemi A.2 (= 10-12-14-16 korda laiusesse), 1 kord skeemi A.3. Korda 2. ja 3. rida, kuni töö pikkus on umbes 29-28-28-29 cm – lõpeta pärast 3. rida, töö PP. Katkesta lõng ja kinnita lõngaots. Edasi heegelda järgmiselt: *tee 10-5-5-5 lõtva ahels, alusta töö PH ja jätka skeemiga A.3, A.2 ja A.1 seljaosal nagu enne ja lõpus tee 10-5-5-5 lõtva ahels, pööra tööd. Jätka heegeldamist järgmiselt: 1. RIDA (= töö PP): tee 5 ahels, 10-ndasse ahels-sse heegelnõelast tee 2 kahekordset sammast (2xsm) + 2 ahels + 2 2xsm (= 1 kordus skeemi A.1), tee 2-1-1-1 korda skeemi A.2 (tee viimane skeemi A.2 mustrikordus ümber 2 ahels skeemil A.1). Siis jätka skeemiga A.2 kokku 10-12-14-16 korda tervel seljaosal nagu enne ja rea lõpus tee järgmiselt: tee skeem A.2 ümber 2 ahels skeemil A.3, siis tee 1-0-0-0 korda skeemi A.2, siis tee skeemi A.3, viimane 2xsm tee eelmise rea esimesse ahelsilmusesse. Katkesta lõng ja pööra tööd*, SUURUSTEL L/XL – XXL – XXXL korda *kuni* veel 1 kord, SAMAL AJAL tee 2 lisakordus skeemi A.2 seljaosal, st. tee 1 lisakordus skeemi A.2 kasvatatud kordustel mõlemal töö serval = 16-18-20 kordust kokku skeem A.2 suurustel L/XL – XXL – XXXL. NB! Ära korda *kuni* suurusel S/M, aga jätka nagu on kirjeldatud allpool: heegelda 13-13-13-13 lõtva ahels, alusta töö PH ja jätka skeemiga A.2 ahels-kaarde skeemil A.3, skeemi A.2 varrukatel ja seljaosal nagu enne ja skeemi A.2 ahels-kaarde skeemil A.1 ja lõpus tee 13-13-13-13 lõtva ahels. Jätka heegeldamist järgmiselt: 1. RIDA (= töö PP): tee skeemi A.1 ja A.2 uute silmuste kohale 1 kord. Jätka skeemiga A.2 varruka kohal ja seljaosal nagu enne ja lõpus tee 1 skeemide A.2 ja A.3 mustrikordus. Jätka sedasi mustriga, kuni töö pikkus on umbes 49-51-55-57 cm – lõpeta pärast töö PH rida. Siis lõpeta õlad eraldi. PAREM ÕLG Heegelda 1 kord skeemi A.1 ja skeemi A.2 kokku 5-6-6-7 korda, siis tee skeemi A.4 teist rida – loe HEEGELDAMISE NIPPI! Pööra ja tee skeemi A.4 kolmandat rida ja heegelda rea lõpuni skeemi A.2 ja A.1 nagu enne. Jätka sedasi, kuni terve töö pikkus on 52-54-58-60 cm. Katkesta lõng ja kinnita lõngaots. VASAK ÕLG Heegelda nagu paremat hõlma, aga peegelpildis, tee skeemi A.3 skeemi A.1 kohale ja heegelda skeemi A.5 teist rida mitte skeemi A.4. Alusta skeemi A.5 teisest reast rea keskelt, nii et kaelaaugu laiuseks on skeemi A.2 4-4-6-6 kordust laiuses. PAREM HÕLM Heegeldatakse edasi-tagasi. Tee 45-52-58-64 ahels. Heegelda esimest rida töö PH: 1 ks teise ahels-sse heegelnõelast, 1 ks igasse järgmisesse 4-1-2-3 ahels-sse, *jäta vahele 1 ahels, 1 ks igasse järgmisesse 4 ahels-sse*, korda *kuni* kokku 7-9-10-11 korda ja lõpus tee 1 ks igasse järgmisesse 4 ahels-sse = 37-42-47-52 ks. 1. RIDA (= töö PP): 4 ahels (= 1 2xsm), 1 2xsm igasse järgmisesse 3 ks-sse (= 4 2xsm esiliistul) NB! Tee esiliistul igal teisel real 2xsm ja 3xsm. Siis tee skeemi A.2 kokku 5-6-7-8 korda ja lõpus tee 1 kord skeemi A.3. Korda seda mustrit ja heegelda 4 2xsm/3xsm esiliistul, kuni töö pikkus on umbes 29-28-28-29 cm – säti seljaosaga ja lõpeta töö PP. Katkesta lõng ja kinnita lõngaots. Siis tee 10-5-5-5 lõtva ahels varruka jaoks ja jätka nagu seljaosal. Kui töö pikkus on 42-44-46-48 cm, heegelda esimest rida järgmiselt, töö PH: mustrit nagu enne, kuni jääb 3 kordust skeemil A.2 ja 4 2xsm. Heegelda mustrit skeemi A.5 järgi nendel silmustel. Pööra ja tee skeemi A.5, jätka rida mustriga nagu enne. Heegelda sedasi edasi-tagasi, kuni töö pikkus on 52-54-58-60 cm. Katkesta lõng ja kinnita lõngaots. VASAK HÕLM Heegelda nagu paremat hõlma, aga peegelpildis. Tee skeemi A.1 skeemi A.3 kohale ja kaelaaugu kahandamise alguses tee skeemi A.4 skeemi A.5 kohale. VIIMISTLEMINE Aseta hõlm seljaosa peale ja heegelda õlad kokku järgmiselt: * 1 ks läbi mõlema kihi, 3 ahels, jäta vahele 2 2xsm*, korda *kuni*. Heegelda küljed kokku järgmiselt: 1 ks, *3 ahels, 1 ks järgmise rea ahels-kaarde*, korda *kuni*. Heegelda varruka siseküljed kokku järgmiselt:*1 ks järgmise 2xsm grupi ahels-sse, 3 ahels*, korda *kuni* ja lõpus tee 1 ks. Õmble nööbid vasakule hõlmale ja kinnita nööbid läbi topeltsamba paremal hõlmal. KAELUS Heegelda ääris kaelaaugul järgmiselt, alusta töö PH: 1. RIDA: kinnita lõng serva 1 kinnissilmusega, *3 ahels, jäta vahele umbes 2 cm, 1 ks*, korda *kuni* kaelaaugu ümber. Pööra tööd. 2. RIDA: 4 ahels, 3 2xsm esimesse ahels-kaarde, * 3 2xsm järgmisesse ahels-kaarde*, korda *kuni* tervel real, lõpus tee 1 2xsm esimesse ahel-sse. Pööra tööd. 3. RIDA: *3 ahels, jäta vahele 3 2xsm, 1 ks kahe järgmise sammaste grupi vahele*, korda *kuni* tervel real. Pööra tööd. 4. RIDA: 2 ahels, 1 ks esimesse ahels-kaarde, *2 ahels, 1 ks järgmisesse ahels-kaarde*, korda *kuni* tervel real. Katkesta lõng ja kinnita lõngaots. |
|||||||||||||||||||
Skeemi seletused |
|||||||||||||||||||
|
|||||||||||||||||||
![]() |
|||||||||||||||||||
![]() |
|||||||||||||||||||
Kas oled teinud seda mustrit?Lisa oma piltidele viide #dropspattern #veranocadigan või saada link projektile meie #dropsfan galeriisse. Vajad abi selle mustriga?Garnstudio.com kodulehel on 8 õppevideot, küsimuste/vastuste osa ja muudki. © 1982-2025 DROPS Design A/S. Kõik õigused kaitstud. See dokument, ning selle alajaotused on kaitsud autoriõigustega. Loe rohkem, mida meie mustritega võib teha, iga mustrilehe alt meie kodulehel. |
Jäta kommentaar mustrile DROPS 153-14
Ootame kommentaare selle mustri kohta!
Kui soovid midagi küsida, siis kiiremaks vastuse saamiseks veendu, et valid õige kategooria alloleval formil. Vajaliku väljad *.