Warm Apricot |
||||||||||||||||||||||
|
||||||||||||||||||||||
Crochet DROPS top with lace pattern and raglan in ”Safran”. The piece is worked top down. Size: S - XXXL.
DROPS Extra 0-1287 |
||||||||||||||||||||||
PATTERN: See diagrams A.1. CROCHET INFO: Replace first dc at on every dc round with ch 3, finish the round with 1 sl st in 3rd ch from beg of round. On every sc round, replace first sc with 1 ch and finish round with 1 sl st in 1st ch from beg of round. INCREASE TIP-1: Inc 1 dc by working 2 dc in same dc. INCREASE TIP-2 (applies to sides of body): Work until 3 dc remain before marker thread, work 2 dc in next dc (= 1 dc inc), work 1 dc in each of the next 4 dc (marker thread is in the middle of these sts), work 2 dc in next dc (= 1 dc inc). RAGLAN: Inc for raglan on each side of A.1. Inc 2 sts BEFORE A.1 as follows: Work until 2 dc remain before A.1, work 2 dc in each of the next 2 dc (= 2 dc inc). Inc 2 sts AFTER A.1 as follows: Work 2 dc in each of the first 2 dc after A.1 (= 2 dc inc). Inc 1 sts BEFORE A.1 as follows: Work until 1 dc remains before A.1, work 2 dc in next dc (= 1 dc inc). Inc 1 sts AFTER A.1 as follows: Work 2 dc in first dc after A.1 (= 1 dc inc). The inc on body and sleeves are uneven as explained in pattern. DECREASE TIP: Work until 4 dc remain before marker thread, work the next 2 dc tog as follows: Work 1 dc in next dc but wait with last pull through (= 2 sts on hook), work 1 dc in next dc, but on last pull through pull yarn through all sts on hook - 1 dc have been dec, work 1 dc in each of the next 4 dc (marker thread is between these sts), work the next 2 dc tog (= 1 dc dec). ---------------------------------------------------------- YOKE: The piece is worked top down. Work 161-166-171-176-181-186 ch on hook size 3.5 mm/E/4 with Safran. Work next round as follows: Work 1 dc in 4th ch from hook (= 2 dc) - READ CROCHET INFO, 1 dc in each of the next ch 2, * skip ch 1, 1 dc in each of the next 4 ch *, repeat from *-* the entire row = 128-132-136-140-144-148 dc. Then work next round as follows: Work 1 dc in each of the first 18-19-20-21-22-23 dc AT THE SAME TIME inc 4-5-5-6-7-8 dc evenly – READ INCREASE TIP-1 – (= half back piece), A.1 over the next 11 dc, 2 dc in next dc, 1 dc in each of the next 4 dc, 2 dc in next dc, A.1 over the next 11 dc (= sleeve), 1 dc in each of the next 36-38-40-42-44-46 dc AT THE SAME TIME inc 8-10-10-12-14-16 dc evenly (= front piece), A.1 over the next 11 dc, 2 dc in next dc, 1 dc in each of the next 4 dc, 2 dc in next dc, A.1 over the next 11 dc (= sleeve), 1 dc in each of the last 18-19-20-21-22-23 dc AT THE SAME TIME inc 4-5-5-6-7-8 dc evenly. On front and back piece there are now 44-48-50-54-58-62 dc and on sleeve there are A.1, 8 dc and A.1. On next round inc for RAGLAN – see explanation above! INC AS FOLLOWS ON FRONT AND BACK PIECE: Inc 2 dc every round 3-4-7-9-13-16 times in total, then 1 dc every round 12-12-10-9-6-5 times in total. INC AS FOLLOWS ON SLEEVES: Inc 2 dc every round 0-0-1-3-4-4 times in total, then 1 dc every round 15-16-16-15-15-17 times in total. REMEMBER THE CROCHET GAUGE! When A.1 have been worked 1 time vertically, repeat A.1a over A.1. After all inc there are 80-88-98-108-122-136 dc on front piece and back piece, on sleeve there are A.1, 38-40-44-50-54-58 dc and A.1. Piece measures approx. 14-15-16-17-18-19 cm / 5½''-6''-6¼''-6¾''-7''-7½''. Work next round as follows: Work 1 dc in each of the first 40-44-49-54-61-68 dc, work 8 ch (= under sleeve), insert 1 marker thread in the middle between the new ch, skip: A.1a, 38-40-44-50-54-58 dc and A.1a (= sleeve), work 1 dc in each of the next 80-88-98-108-122-136 dc, 8 ch (= under sleeve), insert 1 marker thread in the middle of the new sts, skip: A.1a and 38-40-44-50-54-58 dc and A.1a (= sleeve), work 1 dc in each of the next 40-44-49-54-61-68 dc = 160-176-196-216-244-272 dc and 16 ch. Insert 1 marker in piece, NOW MEASURE PIECE FROM HERE. Move marker threads when working, leave the marker in piece. BODY: Work 1 dc in every dc, 1 dc in every ch. There are 88-96-106-116-130-144 dc between marker threads on back piece and front piece. When piece measures 3 cm / 1'' (measured from marker), dec 1 st on each side of each marker thread in the side (= 4 sts dec) - READ DECREASE TIP! Repeat dec every 4-4-3½-4½-4½-4½ cm / 1½"-1½"-1 1/4"-1 3/4"-1 3/4"-1 3/4" 3-3-4-3-3-4 more times = 160-176-192-216-244-268 dc in total. When piece measures 17-18-19-20-21-22 cm / 6¾''-7''-7½''-8''-8¼''-8¾'' (measured from marker), inc 1 st on each side of each marker thread (= 4 dc inc) – see INCREASE TIP-2. Repeat inc every 1½ cm / ½'' 6-6-7-6-6-7 more times = 188-204-224-244-272-300 dc. Continue with 1 dc in every dc until piece measures 32-33-34-35-36-37 cm / 12½''-13½''-13 3/8''-13¾''-14¼''-14½'' (measured from marker). Piece measures approx. 46-48-50-52-54-56 cm / 18''-19''-19¾''-20½''-21¼''-22'' in total from neck edge. Work 1 edge around the top as follows: Work * 1 sc in first/next dc, ch 4, skip approx. 1 cm / 3/8'' *, repeat from *-* around the entire top. Fasten off. SLEEVE EDGE: Sleeve is worked in the round, top down. Beg by working mid under sleeve as follows: Work 1 sc in 5th ch of the 8 ch worked in armhole on body. Work 3 ch (= 1 dc). Then work with 1 dc in each of the next ch 3, A.1a as before, 1 dc in each of the next 38-40-44-50-54-58 dc, A.1a as before, 1 dc in each of the last 4 ch under sleeve, finish with 1 sl st in 3rd ch at beg of round. Work 1 dc in every dc and A.1a until 1 whole repetition of A.1a has been worked. Then work 1 dc in every dc, work A.1b over A.1a = 68-70-74-80-84-88 dc. On next round work 1 dc in every dc AT THE SAME TIME dec 12 dc evenly = 56-58-62-68-72-76 dc. Work 1 dc in every dc until sleeve edge measures approx. 4 cm / 1½''. Work * 1 sc in first/next dc, ch 4, skip approx. 1 cm / 3/8'' *, repeat from *-* around the entire sleeve. Fasten off. Work a sleeve edge around the other sleeve. NECK EDGE: Beg mid back. Work ch 1, * 1 sc in first/next dc, ch 4, skip approx. 1 cm / 3/8'' *, repeat from *-* around the entire neck, finish with 1 sl st in first ch, make sure to avoid a tight neck edge. |
||||||||||||||||||||||
Diagram explanations |
||||||||||||||||||||||
|
||||||||||||||||||||||
Have you made this or any other of our designs? Tag your pictures in social media with #dropsdesign so we can see them! Do you need help with this pattern?You'll find tutorial videos, a Comments/Questions area and more by visiting the pattern on garnstudio.com. © 1982-2024 DROPS Design A/S. We reserve all rights. This document, including all its sub-sections, has copyrights. Read more about what you can do with our patterns at the bottom of each pattern on our site. |
Comments / Questions (70)
Sven wrote:
A2 fehlt nicht, die deutsche Ûbersetzung ist falsch! A2 gehört zum Muster 0-1286.
06.08.2016 - 08:05Christine Dieterich wrote:
Warum fehlt Diagramm A.2? Danke!
05.08.2016 - 11:14DROPS Design answered:
Liebe Christine, bei dieser Anleitung gibt es kein Diagramm A.2
08.08.2016 - 09:26Cathy Gagnon wrote:
À quel moment est-ce que l'on relit le tricot avec une maille coulée? On dirait que c'est les instructions pour le cardignan.
25.07.2016 - 17:43DROPS Design answered:
Bonjour Mme Gagnon, le top se crochète en rond (= en tours) dès le début. Fermez la chaînette de base par 1 mc dans la 1ère ml et continuez comme indiqué. Bon crochet!
26.07.2016 - 10:04Marion wrote:
Bonjour, à quel moment faut-il crocheter le diagramme A1? J'ai beau relire les explications, je ne trouve pas. Merci pour votre aide. Marion
18.07.2016 - 23:15DROPS Design answered:
Bonjour Marion, il semble effectivement que A.1 ne soit utilisé que pour le gilet et pas pour le pull. L'information a été transmise à nos stylistes, une correction sera probablement faite plus tard. Merci pour votre patience. Bon crochet!
19.07.2016 - 09:54Nancy wrote:
I am confused with the decrease directions. Where it says 'On next round inc for RAGLAN - see explanation above!' Is that round with or without the next INC for the fronts and backs and sleeves? My other question is: the directions start you with A2 chart, however, it then states 'When A.1 and A.2 have been worked 1 time vertically, repeat A1a over A1 etc... When do you start A1?
15.07.2016 - 04:32DROPS Design answered:
Dear Nancy, we have forwarded question about A.1 to our Design team, it looks like A.1 is not worked in the jumper, pattern will be edited online asap - When it says "on next round inc for raglan", start inc 2 sts for raglan before/after the markers on back and front pieces (inc first every round in all sizes), but you will inc on sleeve only in the 4 largest size. See how to inc under "Raglan" but depending on your size you will inc differently on body/sleeve. Happy crocheting!
15.07.2016 - 10:07Paola Pellegrini wrote:
Dalle spiegazioni non e' chiaro dove comincia lo schema A1, anche guardando la foto non si vede dove sta quel motivo. cordiali saluti
11.07.2016 - 16:57DROPS Design answered:
Buongiorno Paola. Molto probabilmente è un errore. Abbiamo già avvisato il settore design e siamo in attesa di una conferma. Il testo verrà corretto on line. Grazie e buon lavoro!
11.07.2016 - 17:01Paola Pellegrini wrote:
Hei, jeg er ikke forstått hvor A1 blir heklet, og kan ikke se A1 mønster i genser bildet.
11.07.2016 - 11:16DROPS Design answered:
Hei Paula. Jo, det er mönstret ved raglan paa baerestk (se överst paa toppen paa bildet)
12.07.2016 - 17:06Marja Noort wrote:
Wanneer begint A1er bij te komen en bedoelt u voor de meerderingen 2 stk op zowel voor- als achterpand, dus 4 stk totaal per toer 7 x?
09.07.2016 - 16:30DROPS Design answered:
Hoi Marja. Je meerdert 2 stk voor/na elke A.1 op zowel voor- als het achterpand. Dus dat is 4 stk op het voorpand en 4 stk op het achterpand. Daarna meerder je 1 stk = 2 stk op het voorpand en 2 stk op het achterpand
11.07.2016 - 13:52Ana wrote:
Hola, quería saber si vais a traducir este patrón al español, gracias.
07.07.2016 - 16:45DROPS Design answered:
Hola Ana. El patrón está publicado en español. Aquí está el línk: https://www.garnstudio.com/pattern.php?id=7577&cid=23
12.07.2016 - 22:48Ann Fomina wrote:
Hi. The manual is missing the moment when it begins knitting according to the scheme A.1
07.07.2016 - 11:25