White Rose |
|||||||||||||||||||||||||
|
|
||||||||||||||||||||||||
Knitted jumper in DROPS Nord. Piece is knitted top down with cables in raglan. Size: S - XXXL
DROPS 206-30 |
|||||||||||||||||||||||||
---------------------------------------------------------- EXPLANATION FOR THE PATTERN: ---------------------------------------------------------- INCREASE TIP-1 (evenly): To calculate how to increase evenly, use the total number of stitches on row (e.g. 116 stitches) and divide stitches by number of increases to be done (e.g. 12) = 9.7. In this example increase by making 1 yarn over after alternately approx. every 9th and 10th stitch. On next round work yarn overs twisted to avoid holes. PATTERN: See diagrams A.1 and A.2. RAGLAN: Increase 1 stitch in each side of pattern borders along each raglan line, i.e. increase 1 stitch on each side of A.1B and A.2B (= 8 stitches increased on round). Increase 1 stitch by making 1 yarn over. On next round knit yarn overs twisted to avoid holes. Then work the new stitches in stocking stitch. INCREASE TIP-2 (applies to sides on body and mid under sleeves): Work until 2 stitches remain before marker thread, make 1 yarn over, knit 4 (marker thread is in the middle of these 4 stitches), make 1 yarn over (= 2 stitches increased at marker thread). On next round knit yarn overs twisted to avoid holes. Then work the new stitches in stocking stitch. DECREASE TIP (applies to mid under sleeves): Work until 3 stitches remain before marker thread, knit 2 together, knit 2 stitches (marker thread is between these 2 stitches), slip 1 stitch knitwise, knit 1, pass slipped stitch over stitch worked (= 2 stitches decreased). ---------------------------------------------------------- START THE PIECE HERE: ---------------------------------------------------------- JUMPER - SHORT OVERVIEW OF THE PIECE: Neck edge and yoke are worked in the round on circular needle, top down. Now divide yoke for body and sleeves. Work body in the round on circular needle, top down. Work sleeves in the round on double pointed needles/short circular needle, top down. NECK EDGE: Cast on 116-120-124-128-136-140 stitches on circular needle size 2.5 mm with Nord. Knit 1 round. Then work rib in the round (= knit 2/purl 2) for 3 cm. Knit 1 round while increasing 12 stitches evenly - read INCREASE TIP-1 = 128-132-136-140-148-152 stitches. Knit 1 round without increase. Insert 1 marker on round. THEN MEASURE PIECE FROM MARKER. Work yoke as explained below. YOKE: Switch to circular needle size 3 mm. Work next round as follows (from left raglan line at the back when garment is worn): Work A.1A (= 20 stitches), work 22-24-26-28-32-34 stitches in stocking stitch (= back piece), work A.2A (= 20 stitches), work 2 stitches in stocking stitch (= mid on top of sleeve), work A.1A (= 20 stitches), work 22-24-26-28-32-34 stitches in stocking stitch (= front piece), work A.2A (= 20 stitches), and finish with 2 stitches in stocking stitch (= mid on top of sleeve). There are now 152-156-160-164-172-176 stitches on needle. Work next round as shown in diagrams - REMEMBER KNITTING TENSION! Then work pattern as explained below - AT THE SAME TIME begin increase for RAGLAN - read explanation above. Work first round as follows: Work A.1B (= 26 stitches), increase 1 stitch for raglan, work 22-24-26-28-32-34 stitches in stocking stitch (= back piece), increase 1 stitch for raglan, work A.2B (= 26 stitches), increase 1 stitch for raglan, work 2 stitches in stocking stitch (= mid on top of sleeve), increase 1 stitch for raglan, work A.1B (= 26 stitches), increase 1 stitch for raglan, work 22-24-26-28-32-34 (= front piece), increase 1 stitch for raglan, work A.2B (= 26 stitches), increase 1 stitch for raglan, work 2 stitches in stocking stitch (= mid on top of sleeve), and increase 1 stitch for raglan (= 8 stitches increased on round). Continue the pattern like this and increase every other round 17-24-27-32-33-37 times in total, and then every 4th round 5-3-3-2-3-3 times in total (work the increased stitches twisted and in stocking stitch). After last increase there are 328-372-400-436-460-496 stitches on needle. Work without increase until yoke measures 18-20-22-24-26-28 cm from marker in the neck. On next round decrease 24 stitches. This is done to decrease the stitches added as compensation to make the cables contract the work in the raglan lines. Distribute the decrease so that 6 stitches are decreased in A.1B and A.2B (it is best to decrease by knitting the stitches over the cable together 2 by 2) = 304-348-376-412-436-472 stitches remain on needle. Cut the yarn. Now divide the piece for body and sleeves, i.e. work next round as follows: Slip the first 8-9-9-8-6-5 stitches on 1 stitch holder for sleeve, cast on 10-10-12-12-14-16 new stitches on needle (= in the side under sleeve), work in stocking stitch over the next 90-100-108-120-132-144 stitches (= back piece), slip the next 62-74-80-86-86-92 stitches on 1 stitch holder for sleeve, cast on 10-10-12-12-14-16 new stitches on needle (= in the side under sleeve), work in stocking stitch over the next 90-100-108-120-132-144 stitches (= front piece) and slip the remaining 54-65-71-78-80-87 stitches on to same stitch holder as first part of sleeve at the beginning of round, for sleeve. BODY: = 200-220-240-264-292-320 stitches. Work in stocking stitch over the first 5-5-6-6-7-8 stitches that were cast on under sleeve. Now round begins here. Insert 1 marker thread at the beginning of round and insert 1 marker thread in the middle of the 10-10-12-12-14-16 stitches were cast on under sleeve in the other side. Move the marker threads upwards when working; they should be used for increase later in the sides. Work in stocking stitch in the round. When piece measures 2 cm from division, increase 1 stitch on each side of both marker threads - read INCREASE TIP-2. Increase like this every 6 cm 5 times in total in each side = 220-240-260-284-312-340 stitches. Work until body measures 27 cm from division. On next round increase 56-60-64-68-76-84 stitches evenly = 276-300-324-352-388-424 stitches. Switch to circular needle size 2.5 mm. Work rib in the round = knit 2/purl 2 for 4 cm. Loosely cast off stitches with knit over knit and purl over purl. Jumper measures approx. 52-54-56-58-60 cm from shoulder and down. SLEEVE: Slip the 62-74-80-86-86-92 stitches from stitch holder in one side of piece on double pointed needles/short circular needle size 3 mm and pick in addition up 1 stitch in each of the 10-10-12-12-14-16 stitches cast on under sleeve = 72-84-92-98-100-108 stitches. Insert 1 marker thread in the middle of the 10-10-12-12-14-16 stitches under sleeve and move the marker thread upwards when working. Use marker later when decreasing mid under sleeve. Begin round at the marker thread and work stocking stitch in the round. When piece measures 2 cm from division, decrease 2 stitches mid under sleeve - read DECREASE TIP. Decrease like this every 2½-1½-2-2½-0-0 cm 5-7-6-5-1-1 times in total = 62-70-80-88-98-106 stitches. When piece measures 16 cm from division, increase 2 stitches mid under sleeve - read INCREASE TIP-2. Increase like this every 1 cm 24-23-20-18-16-14 times in total = 110-116-120-124-130-134 stitches. Work until sleeve measures 41-39-38-36-35-33 cm from division (approx. 6 cm remain until finished measurements, try the jumper on and work to desired length). NOTE! Shorter measurements in the larger sizes because of wider neck and longer yoke. Knit 1 round while decreasing 6-12-8-12-10-6 stitches evenly = 104-104-112-112-120-128 stitches. On next round knit all stitches together 2 by 2 = 52-52-56-56-60-64 stitches. Switch to double pointed needles size 2.5 mm. Work rib in the round = knit 2/purl 2 for 5 cm. Loosely cast off stitches with knit over knit and purl over purl. Sleeve measures approx. 47-45-44-42-41-39 cm from division. Work the other sleeve the same way. |
|||||||||||||||||||||||||
Diagram explanations |
|||||||||||||||||||||||||
|
|||||||||||||||||||||||||
Have you made this or any other of our designs? Tag your pictures in social media with #dropsdesign so we can see them! Do you need help with this pattern?You'll find tutorial videos, a Comments/Questions area and more by visiting the pattern on garnstudio.com. © 1982-2024 DROPS Design A/S. We reserve all rights. This document, including all its sub-sections, has copyrights. Read more about what you can do with our patterns at the bottom of each pattern on our site. |
Comments / Questions (41)
France wrote:
Raglan: une fois le premier tour complété, si les grilles A.B comptent 20 rangs,comment arriver à 328 mailles? Pour les 17 mailles (2 tours= 17 x 20)et 5 mailles(4 tours=5 x 4), j'arrive à 358 mailles. Merci de m'indiquer où est mon erreur.
08.02.2024 - 18:44DROPS Design answered:
Bonjour France, vous répétez les diagrammes B en hauteur tout du long, et en même temps, augmentez pour le raglan de chaque côté de chacun des A.1B/A.2B (8 augmentations par tour): 17 x 8 m + 5 x 8 m autrement dit, vous aurez 152 mailles (après le 1er tour de A.1A/A.2A) + 17x8 + 5x8 = 328 mailles. Bon tricot!
09.02.2024 - 07:44Sasha wrote:
Hello! I need help with this. I don't understand this part. 'On next round decrease 24 stitches. This is done to decrease the stitches added as compensation to make the cables contract the work in the raglan lines. Distribute the decrease so that 6 stitches are decreased in A.1B and A.2B (it is best to decrease by knitting the stitches over the cable together 2 by 2)' How do i decrease them? Is it the 8 stitches of the cable part need to be decreased? But how?
25.08.2023 - 20:36DROPS Design answered:
Dear Sasha, knit together the stitches from the cable 2 by 2. So, work the first 2 stitches in the cable together, the next 2 stitches also together, e.t.c. Happy knitting!
28.08.2023 - 00:17Judy wrote:
I haven't started yet but would I get myself in trouble if I were to begin mid-back, with 11 of the 22 sts for the small size , instead of with the cable panel ? Thx
24.05.2023 - 00:54DROPS Design answered:
Dear Judy, I guess you can, but just remember that the explanation of the rounds always start with the raglan stitches, so just remember to adapt on your own work. Happy knitting!
24.05.2023 - 08:28Marie Louise wrote:
Bonjour j avais mis mon tricot de côté, et maintenant je me remet à la tâche ma question est: est-ce que le diagramme fait partie de la manche qu on met à attente ou bien les diagrammes seulement pour le corsage dos et devant. Merci
19.05.2023 - 17:01DROPS Design answered:
Bonjour Marie-Louise, les tours commencent par le diagramme A.2B, et, lors de la division, vous allez conserver les 8-9-9-8-6-5 premières mailles du tour (= de A.2B) pour la manche droite et montez les mailles sous la manche, le reste des mailles de A.2B appartient au dos. Bon tricot!
22.05.2023 - 08:12Marie wrote:
Is there any way I can knit this jumper bottom up plz?
04.02.2023 - 00:19DROPS Design answered:
Dear Marie, we don't make custom patterns. You can start reading from the end of the body and work increases instead of decreases in the yoke. Also, the sleeves are joined as you start the yoke and both body and sleeves are worked together to finish the yoke. Happy knitting!
06.02.2023 - 00:00Emanuela Pierantognetti wrote:
Buongiorno per favore dove si inserisce la correzione dello sprone? Grazie
11.01.2023 - 12:22DROPS Design answered:
Buonasera Emanuela, le spiegazioni sono già corrette. Buon lavoro!
12.01.2023 - 21:17Marie Louise wrote:
Si j ai bien compris l info, se sont les 9 premières mailles après le premier diagramme de A.1b que je dois placer en attente, est-ce exact? Merci infiniment de votre aide
10.11.2022 - 15:08DROPS Design answered:
Bonjour Marie-Louise, ce sont les 9 premières mailles du tour, donc ce sont les 9 premières mailles de A.1B au début du tour que vous allez mettre en attente (pas les 9 mailles après le 1er A.1B). Bon tricot!
10.11.2022 - 17:04Marie Louise wrote:
Tout défait pour mieux recommencer, je ne comprends pas trop de passer les 9 premières mailles sur aiguille aux pour la manche à partir du marqeur dos Merci pour l entraide
09.11.2022 - 17:06DROPS Design answered:
Bonjour Marie-Louise, vous en êtes à la division, correct? les 9 premières mailles du début du tour appartiennent à la manche, mettez les en attente sur un fil et montez 12 mailles, tricotez les 108 mailles suivantes pour le dos, glissez les 80 m suivantes en attente pour la 2ème manche, montez 12 mailles, tricotez les 108 mailles du devant, il reste 71 mailles, glissez ces 71 mailles sur le même fil que les 9 premières m du tour = vous avez ainsi bien 80 mailles pour chaque manche. Bon tricot!
10.11.2022 - 10:50Marie Louise wrote:
Merci tellement pour votre aide,c est très apprécié. 👍😀
28.09.2022 - 02:10Marie Louise wrote:
Bonjour Je fais la taille L ,empiètement,27x et 3x ts les 4 tous je ne comprends pas pouvez vous expliquer. Merci
26.09.2022 - 10:48DROPS Design answered:
Bonjour Marie-Louise, augmentez ainsi: (1 tour avec augmentations, 1 tour sans augmentations), tricotez ces 2 tours 26 fois au total, puis tricotez 1 tour avec augmentations (= vous avez augmenté 27 fois), puis tricotez ainsi (3 tours sans augmenter, 1 tour avec augmentations), tricotez 3 fois ces 4 tours = vous avez augmenté 3 fois supplémentaires. Bon tricot!
26.09.2022 - 11:50