Change language:

BabyDROPS 11-11 by DROPS Design
"Practical closure on the shoulders for young children with dirty faces..."
DROPS Jumper with texture and hat in Safran
BabyDROPS 11-11
Jumper and hat:
Size: 1/3 – 6/9 – 12/18 – 24 months

Materials: DROPS Safran from Garnstudio
Jumper and hat:
150-150-200-200 g color no 18, off-white

DROPS pointed needle size 2.5 mm / US 1.5

DROPS wooden button no. 513: 3 pcs.

Knitting gauge: 25 sts x 34 rows on needles size 2.5 mm / US 1.5 in stockinette sts = 10 x 10 cm / 4'' x 4''.

(Continue to pattern...)

See deals and shadecard for: DROPS Safran

Comments (4)

Print Pattern Print Photo

The following yarns can be used as alternatives for DROPS Safran. All prices valid per 21/10/2014.

DROPS Tutorial Videos: Bind/cast off from RS

DROPS Tutorial Videos: Bind/cast off from wrong side (WS)

DROPS Tutorial Videos: Cast on - continental method

DROPS Tutorial Videos: Edge stitches in garter

DROPS Tutorial Videos: Garter stitch

DROPS Tutorial Videos: Increase - using loop under

DROPS Tutorial Videos: Knit (K) - continental

DROPS Tutorial Videos: Knit (K) - US/UK method

DROPS Tutorial Videos: Pick up sts along edge

DROPS Tutorial Videos: Pick upp stitches sideways

DROPS Tutorial Videos: Purl (P) - continental

DROPS Tutorial Videos: Purl (P) - Norwegian method

DROPS Tutorial Videos: Purl (P) - US/UK method

DROPS Tutorial Videos: Sew together pieces knit in garter

DROPS Tutorial Videos: Shoulder seam

DROPS Tutorial Videos: Stockinette/stocking stitch

DROPS Tutorial Videos: yo (yarn over)

If you do not find the video you need, click here to go to DROPS Video Index.

Yarn type
  • DROPS SAFRAN UNI COLOUR (50g)
    4.25 USD
NOTE: This pattern is written in American English. All measurements in charts are in cm. For conversion from cm to inch - click here. There are different terms for crocheting in British and American English. If this pattern includes crochet, click for "crochet terms" here. For this pattern in British English, please click here.

Garter sts: knit sts on all rows.

Pattern: See diagrams M.1 to M.3. The diagrams show the pattern from the right.
----------------------------------------------------------------------

JUMPER:

Front piece: Cast on 68-74-80-92 sts (incl 1 edge st each side) on needle size 2.5 mm / US 1.5 with Safran. Knit M.1 and continue in stockinette sts.
When piece measures 11-12-15-18 cm knit M.2 and continue in M.3 with 1 edge st in garter sts each side until finished measurements. At the same time when piece measures 16-17-20-23 cm dec for armhole each side on every other row: 3 sts 1 time, 2 sts 1-1-1-2 times and 1 st 4-4-4-5 times = 50-56-62-68 sts.
Continue in M.3 with 1 edge st each side in garter sts.
When piece measures 23-24-38-31 cm bind off the middle 12-14-16-18 sts for neck and dec to shape the neckline on every other row: 2 sts 2 times and 1 st 3 times = 12-14-16-18 sts left on each shoulder.
When piece measures 27-29-33-37 cm bind off sts on right shoulder (when worn). On the left shoulder knit Rib, K2/P2, with 1 st in garter st each side. After 2 rows make 2 buttonholes as follows: K3, bind off 1 st, K 4-5-6-7 sts, bind off 1 st. On the return row make a yo over the bind off sts.
Bind off in Rib when edge measures 2 cm / 3/4''.

Back piece: Cast on and knit as front piece. Dec for armhole as described for front piece and continue until piece measures 26-28-32-36 cm.
Bind off the middle 22-24-26-28 sts for neck and dec 2 sts on next row towards neckline = 12-14-16-18 sts left on each shoulder.
When piece measures 27-29-33-37 cm bind off sts on right shoulder (when worn). On the left shoulder knit Rib, K2/P2, with 1 st in garter st each side.
Bind off in Rib when edge measures 2 cm / 3/4''.

Sleeve: Cast on 44-44-50-50 sts (incl 1 edge st each side) on needle size 2.5 mm / US 1.5 with Safran.
Knit M.1 and continue in M.3 with 1 edge st in garter sts each side until finished measurements.
At the same time when piece measures 5 cm / 2'' inc 1 st each side a total of 4-6-6-9 times:
Size 1/3 months: on every 10th row.
Size 6/9 months: on every 7th row
Size 12/18 months: on every 9th row
Size 24 months: alternate between every 6th and 7th rows
= 52-56-62-68 sts – incorporate new sts in pattern as you go along.
When sleeve measures 17-18-20-23 cm dec for sleeve cap each side on every other row: 4 sts 1 time, 3 sts 1-1-1-0 times, 2 sts 1-1-2-2 times, 1 st 1-2-1-5 times, 2 sts 2-2-2-2 times and 3 sts each side until piece measures 22-23-25-30 cm.
Bind off remaining sts.

Assembly: Sew right shoulder seam.

Neck: Pick up approx 58-82 sts (divisible by 4+2) round the neck – begin by left shoulder – on needle size 2.5 mm / US 1.5 with Safran. Knit Rib as follows: 2 sts in garter sts, *K2, P2*, repeat from *-* and finish with K2 and 2 sts in garter sts. After 4 rows make 1 buttonhole next to the others as follows: bind off 3rd st from the edge and make a yo on the return row. Bind off in Rib when edge measures 2.5 cm / 7/8''.
Place the Rib front edge over Rib edge on back piece.
Set in sleeves. Sew sleeve and side seams inside 1 edge st.
Sew on buttons on shoulder.

----------------------------------------------------------------------

HAT:
To fit head circumference: 41-44-46-48 cm.

Cast on 91-98-105-112 sts on needles size 2.5 mm / US 1.5 with Safran.
Knit M.2. When piece measures approx 8-9-10-11 cm dec 13-14-15-16 sts evenly – adjust to row in garter sts in pattern.
Repeat the dec on every 4th row a total of 5 times = 26-28-30-32 sts .
K2 tog around, then cut the thread and pull it through remaining sts. Sew tight.
Sew tog hat mid back. The hat measures approx 14-15-16-17 cm.


Diagram

knit from right side, purl from wrong side
purl from right side, knit from wrong side


Do you need some help?

For further pattern help, please contact the store where you bought the yarn. Having bought DROPS yarn, you are guaranteed to receive qualified help from a store specializing in the DROPS patterns. You can also take a look at our tutorial videos.

All patterns are carefully reviewed, but we must make reservation for possible mistakes. All patterns are translated from Norwegian and you can always check the original pattern for measurements and calculations. Go to original pattern for design BabyDROPS 11-11. If you think you have found an error in the pattern, please post your remark or question in our Comments section.

© 1982-2014 DROPS Design A/S. We reserve all rights. This document, including all its sub-sections, has copyrights. This is for all of you with knitting as a hobby and for you who run a yarn store. Either way, the DROPS pattern database is at your free disposal. As a store you are welcome to use the DROPS pattern database to promote the sale of your assortment. Print out any pattern you may want, make as many copies as desired. The only thing we ask is that you don't make any changes / additions to the original printed document... and that the patterns according to the DROPS philosophy are given out to the consumers for free.
The sale of garments based on DROPS DESIGN is permitted as long as they are sold as single items or per order. Further commercial use of the patterns is not permitted. It has to be clearly stated that the garment is made based on a design from DROPS DESIGN. The use of DROPS photos for marketing purposes/sales is only permitted when only DROPS yarns have been used. The photo may not be cut or edited and the logo should be clearly visible. The use of clothes labels of which DROPS DESIGN forms part is conditioned by the inclusion of the following text: “A DROPS DESIGN made by …..”.
We reserve the right to withdraw the permission for use at any time, notwithstanding the reason.

DROPS Design