Vashti Schmahl wrote:
Could I mix Drops Melody in Beige with Drops Brushed Alpaca Silk in Beige for the fluffy part of the boot? If so how much of each yarn would I need?
09.07.2020 - 21:06DROPS Design answered:
Dear Mrs Schmahl, we already used 2 strands Brushed Alpaca Silk to replace 1 strand Melody in some patterns, so that you might work here with 1 strand Melody + 2 strands Brushed Alpaca Silk instead of 2 strands Melody - but remember to check/keep your tension - read more about alternatives here. Happy crocheting!
10.07.2020 - 07:58
Lory wrote:
Grazie per la sua disponibilita'. le chiedo se all'inizio e troppo stretto con 32 maglie , come posso fare ?
07.03.2019 - 19:56DROPS Design answered:
Buongiorno Lory, deve prima di tutto verificare che il suo campione corrisponda a quello indicato, altrimenti non otterrà le misure corrette. Può eventualmente provare a lavorare una taglia più grande. Buon lavoro!
19.08.2019 - 18:16
Lory wrote:
Scusami non capisco quando spieghi 10-10-10- cm e diminuire 2 all'inizio e 2 centrali . devo fare 30 cm e poi diminuire sempre 2 all'inizio e 2 centrali ? o quando devo iniziare a farlo ? misura piede 37 . grazie aspetto risposta
07.03.2019 - 16:03DROPS Design answered:
Buongiorno Lory. L'indicazione 10-10-10 cm è la misura riferita ad ognuna delle taglie. In questo caso è uguale per tutte e tre le taglie. Quando il suo lavoro misura 10 cm, deve lavorare insieme le prime 2 maglie e le 2 maglie centrali. Sui ferri rimangono 29 maglie. Prosegue senza ulteriori diminuzioni finchè il lavoro non misura 19 cm (per la taglia 35/37). Buon lavoro!
07.03.2019 - 16:16
Majbritt Borup wrote:
Er det rigtigt at der skal bruges ialt 300 gr symphony men kun 150 g melodi?
18.02.2017 - 17:14DROPS Design answered:
Hej Majbritt. Ja, det er korrekt, for Melody löber 140 m per 50 gr og Symphony löb kun 70 m.
21.02.2017 - 16:18
Tracy wrote:
I made these for my daughter and was so much fun! She loves them!
11.10.2015 - 06:14
Andrea wrote:
I love these! I was wondering though, could you the pattern for soles please?
22.02.2015 - 04:33DROPS Design answered:
Dear Andrea, the pattern for sole starts from the part worked in Eskimo. Happy crocheting!
23.02.2015 - 10:03
MaryAnn wrote:
What does it mean when you saw "folded double "? Just folded like you would wear it around your leg?
25.01.2015 - 00:50DROPS Design answered:
Dear MaryAnn, that's correct, so that you can sew tog beg/end of rows along the back of leg and on bottom of foot. Happy crocheting!
26.01.2015 - 10:06
Shelly Moses wrote:
I've only been crocheting a few months so could you explain what 32-34-36 etc. means?
14.12.2014 - 23:51DROPS Design answered:
Dear Mrs Moses, each number refers to the matching size, the slippers are in size 35/37, 35/40 and 41/43. If you work 1st size, you will start with 32 ch and have 31 dc at the end of 1st row, in 2nd size, you start with 34 ch and have 33 dc at the end of 1st row, and in larger size, you start with 36 ch and have 35 dc at the end of 1st row. Happy crocheting!
15.12.2014 - 10:27
Elenamaes wrote:
Please explain row 1. I'm kinda new to reading patterns. Thanks
25.10.2014 - 06:06DROPS Design answered:
Dear Elenamaes, on row 1, crochet 1 sc in each st until 1 st before marker remains, work 2 sc in the next st, ch 1 and skip next st (the st with marker), work 2 sc in the next st, and continue with 1 sc in each st until end of row. Happy crocheting!
25.10.2014 - 09:57
Jonee wrote:
I have a question about the following part: Now work the foot in sc as follows – insert a marker in the middle st: (ROW 1, ROW 2, ROW 3, ROW 4, Repeat 3rd and 4th row until piece measures approx. 22-24-27 cm / 8 3/4"-9½"-10½" in length - measured when piece is folded double.) Do you still need to crochet a turning chain at the beginning of each of these rows?
16.10.2014 - 23:54DROPS Design answered:
Dear Jonee, you will replace first sc by a turning ch at the beg of every row, even for dec rows. Happy crocheting!
17.10.2014 - 09:47
Pocahontas#pocahontasslippers |
|
|
|
Crochet DROPS slippers in "Snow" and "Symphony" or "Melody".
DROPS 133-9 |
|
CROCHET 2 STS TOG: Crochet the first st but wait with last YO and pull through, crochet next st and at last pull trough now pull thread through all 3 loops on hook. -------------------------------------------------------- SLIPPER: Worked back and forth, top down. Work 32-34-36 loose ch on hook size 8 mm with 2 threads Symphony (1 thread brown and 1 thread light beige) or Melody (2 threads beige). Turn piece. Work 1 dc in 2nd ch from hook, then work 1 dc in every ch the entire row = 31-33-35 dc. Continue to work as follows: * 2 ch, turn piece, work 1 tr in every st, 1 ch, turn piece, work 1 dc in every st *, repeat from *-* - REMEMBER THE CROCHET TENSION – important so that the slippers are the correct size. AT THE SAME TIME when piece measures 10-10-10 cm, dec 2 sts on the row as follows: Work the first 2 sts tog - see explanation above - and the 2 middle sts tog = 29-31-33 sts on row. Then continue until piece measures 19-20-21 cm. Now work the foot in dc as follows – insert a marker in the middle st: ROW 1: Work 1 dc in every st until st before mid st, 2 dc in next st, 1 ch (= middle st), skip next st, 2 dc in next st, 1 dc in each of the last sts, turn piece. ROW 2: Work 1 dc in each of the first sts until the ch, work 7 tr in the middle ch (the 4th tr of the 7 tr is now the middle st) and 1 dc in each of the last sts, turn piece. ROW 3: Work 1 dc in each of the next sts until st before mid st, work 2 dc in next st, 1 ch (= mid st), skip next st, work 2 dc in next st, 1 dc in each of the last sts, turn piece. ROW 4: Work 1 dc in each st until mid st, 7 tr in ch and 1 dc in each of the last sts, turn piece. Repeat 3rd and 4th row until piece measures approx. 22-24-27 cm in length - measured when piece is folded double. Switch to Snow and now measure piece from here. * Work 1 row with dc, finish row with 1 ch and turn piece *, repeat from *-* until piece measures approx. 4-4,5-5 cm - at the same time on last row, work the first 2 and the last 2 sts tog - see explanation above. Cut the thread. ASSEMBLY: Fold the slipper double, sew tog edge to edge in front loop of outermost st to avoid a chunky seam. Loosely work a row with dc at the top of leg with Snow. Work a ch-row with Snow of approx. 150 cm, make a small pompom in each end – Tip: Before the last pompom is inserted on the ch-row, pull the ribbon through a st at the bottom of leg in the transition between Symphony / Melody to Snow so it is fastened tightly. Tie this ch-row around the leg. |
|
Have you finished this pattern?Tag your pictures with #dropspattern #pocahontasslippers or submit them to the #dropsfan gallery. Do you need help with this pattern?You'll find 7 tutorial videos, a Comments/Questions area and more by visiting the pattern on garnstudio.com. © 1982-2025 DROPS Design A/S. We reserve all rights. This document, including all its sub-sections, has copyrights. Read more about what you can do with our patterns at the bottom of each pattern on our site. |
Post a comment to pattern DROPS 133-9
We would love to hear what you have to say about this pattern!
If you want to leave a question, please make sure you select the correct category in the form below, to speed up the answering process. Required fields are marked *.