Shubhangi Kundu wrote:
Hello! I think the chart diagram needs to be corrected as it simply does not match the socks shown in the picture. Kindly correct it or provide a link of the correct diagram.
02.10.2021 - 01:32DROPS Design answered:
Dear Shubhangi, according to Ravelry, quite a large number of people managed to make the socks based on the diagram. If there is a particular part you do not understand, let us know and we will try to help you through. Happy Stitching!
03.10.2021 - 12:21Ziemens wrote:
Sind in der Strickschrift nur die Hinreihen oder auch die Rückreihen angegeben
17.01.2021 - 18:21DROPS Design answered:
Liebe Frau Ziemens, alle Reihen sind im Diagram gezeigt, dh die Hin- sowie de Rückreihen - hier lesen Sie mehr über Diagramme. Viel Spaß beim stricken!
18.01.2021 - 10:06Gro-Dagmar wrote:
Hei ! Har ikke strikket en slik hæl før. Nå har jeg gjort det. Men når jeg skal felle 7 ganger etterpå, 2 m på hver side av merketråden da feller jeg jo inn på mønster M.1B . Er det rett ? mvh Gro-Dagmar
13.03.2020 - 09:10DERAS Marie-Danièle wrote:
Bonjour pouvez vous me dire on commence la torsade en partant du bas ou du haut du diagrame merci de ce que vous pourrez me dire marie danièle
03.06.2018 - 17:03DROPS Design answered:
Bonsoir Marie-Danièle! Vous commencez la torsade en partant du bas du diagrame, par le coin en bas à droite . Bon tricot!
03.06.2018 - 22:49Silje wrote:
Hei Hva menes med "Videre fortsettes det med M.1 + 2 vi i hver side oppå foten" ? Er M.1 = M.1 B? Og hva betyr "vi"? På forhånd takk.
07.01.2018 - 22:50DROPS Design answered:
Hei Silje. Her har det blitt en tastefeil. "vi" skal være "vr" (=vrang). Og det skal være M.1B (B`en manglet). Takk for at du gjorde oss oppmerksom på dette, dette er nå rettet. God fornøyelse videre!
11.01.2018 - 13:23Indre wrote:
I am sorry for repeat. Thank you for information.
16.12.2014 - 22:26Indre wrote:
The cable scheme does not match the cable pattern that is visible in the picture of socks.
16.12.2014 - 22:22Indre wrote:
The cable scheme does not match the cable pattern that is visible in the picture of socks.
16.12.2014 - 00:25DROPS Design answered:
Dear Mrs Indre, please click here to read more about diagrams - remember you work here in the round, all rounds will be worked reading from the right towards the left. Happy knitting!
16.12.2014 - 10:02Lena Henriksen wrote:
Der er to forskellige symboler til snoning over 4 masker med fuldstændig same tekst. (De to første). Er det en fejl ? Og skal de strikkes ens ?
30.09.2014 - 08:41DROPS Design answered:
Hej Lena. Nej, det er en lille tastefejl. Andet symbol skal vaere: sæt 2 m på hj.p bag arb, 2 r, 2 r fra hj.p. Vi skal faa det rettet hurtigst muligt. Tak for meldingen.
30.09.2014 - 16:28
Zen Zoe |
|||||||||||||||||||
|
|
||||||||||||||||||
Knitted DROPS Socks with cables in ”Karisma”.
DROPS 121-15 |
|||||||||||||||||||
PATTERN: See diagram M.1A and M.1B, diagrams show the pattern from RS. HEEL DECREASES: Row 1 (= RS): Work row until 7-8-9 sts remain, slip next st as if to K, K1, psso, turn piece. Row 2 (= WS): Work row until 7-8-9 sts remain, slip next st as if to P, P1, psso, turn piece. Row 3: Work row until 6-7-8 sts remain, slip next st as if to K, K1, psso, turn piece. Row 4: Work row until 6-7-8 sts remain, slip next st as if to P, P1, psso, turn piece. Continue dec like this with 1 less st before each dec until there are 10-12-14 sts on needle. -------------------------------------------------------- SOCK: Worked in the round. Cast on 51-58-65 sts on double pointed needles size 3 mm with Karisma. K 1 round and continue as follows: rib K2/P3 on the first 25-30-35 sts, K2, P2-3-4, M.1 A (= 20 sts), P2-3-4. When piece measures 5 cm work M.1 B over M.1A with remaining sts as before. Continue like this until piece measures 21-22-23 cm. Now dec 1 st in the first 5-6-7 P-sections by P tog the first 2 sts (NOTE! do not dec in P-sections each side of M.1B) = 46-52-58 sts. Now continue in rib and M.1B. When piece measures 23-24-25 cm keep the first 22-26-30 sts on needle for heel, and slip the remaining 24-26-28 sts on a stitch holder = mid upper foot. Now work heel back and forth in stocking st on the 22-26-30 heel sts for approx 5-5.5-6 cm. Insert a marker. Dec for HEEL - see HEEL DECREASES! After heel dec pick up 11-13-15 sts each side of heel and slip sts from stitch holder back on needle = 56-64-72 sts. Insert a marker each side of the 24-26-28 sts mid upper foot. Continue in M.1 + P2-3-4 each side of upper foot and stocking st under foot. AT THE SAME TIME dec each side as follows: K tog into back of loop the 2 sts before first marker and K tog the 2 sts after second marker on every other round a total of 7 times = 42-50-58 sts. Continue until piece measures approx 18-19-21 cm (= approx 4-5-6 cm remain) from marker on heel. Insert a marker each side of foot, i.e. 21-25-29 sts over and under foot. Continue in stocking st on all sts. AT THE SAME TIME dec for toes each side of both markers as follows: K tog the 2 sts before marker and K tog into back of loop the 2 sts after marker. Repeat the dec on every other round a total of 4-6-7 times and then on every round a total of 5-4-5 times = 6-10-10 sts. Cut the thread and pull it through remaining sts, tighten tog and fasten. |
|||||||||||||||||||
Diagram explanations |
|||||||||||||||||||
|
|||||||||||||||||||
Have you made this or any other of our designs? Tag your pictures in social media with #dropsdesign so we can see them! Do you need help with this pattern?You'll find tutorial videos, a Comments/Questions area and more by visiting the pattern on garnstudio.com. © 1982-2024 DROPS Design A/S. We reserve all rights. This document, including all its sub-sections, has copyrights. Read more about what you can do with our patterns at the bottom of each pattern on our site. |
Gro-Dagmar wrote:
Hei ! Har funnet ut av det. Hadde bare lest litt feil.
13.03.2020 - 22:29