Drops Design logo

Odeta Pants

#odetapants



The set consists of: knitted baby shorts and slippers with lace pattern and garter stitch. Sizes premature - 4 years. The set is worked in DROPS BabyMerino.

DROPS Baby 31-4
DROPS Design: Pattern no bm-083-by
Yarn group A
-----------------------------------------------------------

FOR THE WHOLE SET YOU WILL NEED:
Sizes: (<0) 0/1 - 1/3 - 6/9 - 12/18 months (2) years
Size equivalent to approx. child’s length in cm:
(40/44) 48/52 - 56/62 - 68/74 - 80/86 (92) 
Fits foot length: (8) 9-10-11-12 (14) cm 
Materials:
DROPS BABYMERINO from Garnstudio (belongs to yarn group A)
(50) 100-100-100-100 (100) g colour 43, light sea green

The piece can also be knitted with yarn from:
"Alternative yarn (Yarn group A)" – see link below.

DROPS DOUBLE POINTED NEEDLES SIZE 3 MM – or the size needed to get 24 stitches and 48 rows garter stitch on 10 cm in width and 10 cm in height.

DROPS DOUBLE POINTED NEEDLES SIZE 2.5 MM – or the size needed to get 26 stitches and 34 rows stocking stitch on 10 cm in width and 10 cm in height.

DROPS CROCHET HOOK SIZE 2.5 MM – for the cord.
-----------------------------------------------------------

SHORTS:
Sizes: (<0) 0/1 - 1/3 - 6/9 - 12/18 months (2) years
Size equivalent to approx. child’s length in cm:
(40/44) 48/52 - 56/62 - 68/74 - 80/86 (92) 
Materials: 
DROPS BABYMERINO from Garnstudio
(50) 50-50-50-50 (100) g colour 43, light sea green

The piece can also be knitted with yarn from:
"Alternative yarn (Yarn group A)" – see link below.

DROPS DOUBLE POINTED NEEDLES SIZE 3 MM – or the size needed to get 24 stitches and 48 rows garter stitch on 10 cm in width and 10 cm in height.

DROPS DOUBLE POINTED NEEDLES SIZE 2.5 MM for the rib – or the size needed to get 26 stitches and 34 rows stocking stitch on 10 cm in width and 10 cm in height.

DROPS CROCHET HOOK SIZE 2.5 MM – for the cord.
----------------------------------------------------------

SLIPPERS:
Sizes: (<0) 0/1 - 1/3 - 6/9 - 12/18 months (2 - 3/4) years
Fits foot length: (8) 9-10-11-12 (14-16) cm 
Materials: 
DROPS BABYMERINO from Garnstudio (belongs to yarn group A)
(50) 50-50-50-50 (50-50) g colour 43light sea green

The piece can also be knitted with yarn from:
"Alternative yarn (Yarn group A)" – see link below.

DROPS DOUBLE POINTED NEEDLES SIZE 2.5 MM – or the size needed to get 26 stitches and 51 rows garter stitch on 10 cm in width and 10 cm in height.
----------------------------------------------------------

INFORMATION FOR THE PATTERN:

RIDGE/GARTER STITCH (worked in the round):
1 ridge = 2 rounds. Knit 1 round and purl 1 round.

RIDGE/GARTER STITCH (worked back and forth):
1 ridge = Knit 2 rows.

PATTERN:
Shorts: See diagram A.1.
Slippers: See diagrams A.2 and A.3.
The diagrams show all the rows in the pattern seen from the right side.

INCREASE TIP (for the shorts):
Work until there are 2 stitches left before the marker thread in the side, 1 yarn over (= 1 stitch increased), knit 4 stitches (the marker thread sits in the middle of these stitches), 1 yarn over (= 1 stitch increased), increase like this at both marker threads (= a total of 4 stitches increased).
On the next round work the yarn overs twisted to avoid holes.
----------------------------------------------------------

SHORTS:
The piece is worked in the round with double pointed needles, top down. Cast on (80) 96-96-112-112 (128) stitches with double pointed needles size 2.5 mm and BabyMerino. Insert 1 marker at the beginning of the round (= mid back). Work rib from mid back as follows: Knit 1, * purl 2, knit 2 *, work from *-* until there are 3 stitches left, finish with purl 2 and knit 1.
When the rib measures (2) 2-2-3-3 (3) cm work a row of holes for the cord on the next round as follows: * Knit 1, 1 yarn over, purl 2 together, knit 1 *, work from *-* to end of round.
Work 1 round of rib knit 2 /purl 2.
Then work an elevation in the rib at the back as follows: Work (7) 9-9-9-9 (9) stitches, turn, tighten the strand, work (14) 18-18-18-18 (18) stitches back, turn, tighten the strand, work (20) 24-24-24-26 (26) stitches, turn, tighten the strand, work (26) 30-30-30-34 (34) stitches back, turn, tighten the strand, work (32) 36-36-36-42 (42) stitches, turn, tighten the strand, work (38) 42-42-42-50 (50) stitches back.
Continue like this, i.e. work (6) 6-6-6-8 (8) more stitches each time the piece is turned until you have worked over a total of (62) 66-66-66-82 (82) stitches. Turn, tighten the strand, then continue with rib in the round over all stitches again.
When the piece measures (4) 4-5-5-5 (5) cm mid front, change to double pointed needles size 3 mm. Knit 1 round and decrease (10) 14-10-22-14 (26) stitches evenly on round = (70) 82-86-90-98 (102) stitches. On the next round insert 1 marker thread in each side of the piece as follows: Work (17) 20-21-22-24 (25) stitches GARTER STITCH – see description above, insert 1 marker thread (= half the back piece), work (35) 41-43-45-49 (51) stitches garter stitch, insert 1 marker thread (= front piece), work (18) 21-22-23-25 (26) stitches garter stitch (= half the back piece). The piece is now continue in garter stitch. REMEMBER THE KNITTING TENSION!
On the next round increase 1 stitch on each side of both the marker threads in the sides (= 4 stitches increased) – read INCREASE TIP. Increase like this every cm a total of (6) 7-8-11-11 (14) times, then increase 2 stitches evenly on next round = (96) 112-120-136-144 (160) stitches. When the piece measures (10) 12-14-16-17 (19) cm, adjust so that the last row was purled, work pattern A.1 over all stitches (= a total of (12) 14-15-17-18 (20) times in width). When A.1 has been worked 1 time in height, work garter stitch to finished length.
When the piece measures (15) 17-19-21-22 (24) cm, cast off stitches for the legs as follows: Cast off the first (41) 49-53-61-63 (71) stitches, work (14) 14-14-14-18 (18) stitches, cast off the last (41) 49-53-61-63 (71) stitches = (14) 14-14-14-18 (18) stitches left for gusset. Cut the strand. Now continue working back and forth. Work GARTER STITCH – see description above, for approx. (2) 2-2-3-4 (5) cm. Cast off. Sew these ridges to the cast off edge on the back piece, in the middle, in the outermost loop of the outermost stitch.

CORD:
Crochet a cord as follows: Work chain stitches with hook size 2.5 mm and BabyMerino for 75-80-85-90-95 cm, turn and work back with 1 slip stitch in each chain. Cut and fasten the strand. Thread the cord in and out through the row of holes (start and finish mid front).
----------------------------------------------------------

SLIPPER:
The slipper is worked back and forth with double pointed needles from mid back, top down, i.e. the leg is worked first, then the foot.
Cast on (36) 38-40-44-48 (52-56) stitches with double pointed needles size 2.5 mm and BabyMerino. Work 1 stitch in GARTER STITCH – see above, A.2 (= 2 stitches) until 1 stitch remains, work 1 stitch in garter stitch When A.2 has been worked 1 time in height, work the next row as follows from the right side: Work (2) 3-0-2-0 (2-0) stitches stocking stitch, A.3 (= 8 stitches) in total (4) 4-5-5-6 (6-7) times in width and finish with (2) 3-0-2-0 (2-0) stitches stocking stitch. REMEMBER THE KNITTING TENSION! When A.3 has been worked 1 time in height, work A.2 as follows: work 1 stitch in garter stitch, A.2 until 1 stitch remains, and work 1 stitch in garter stitch (the cord is thread through this row of holes later). When A.2 has been completed in height, work 2 RIDGES – see description above and decrease (6) 8-6-6-10- (10-14) stitches evenly on the last row from the right side = (30) 30-34-38-38 (42-42) stitches. Cut the strand.
Now place the first (11) 11-12-13-13 (15-15) stitches and the last (11) 11-12-13-13 (15-15) stitches on separate threads. The piece is now worked in garter stitch to finished length. Work (3) 3½-4-4½-5½ (6½-8) cm, over the middle (8) 8-10-12-12 (12-12) stitches (= mid top of slipper), cut the strand.
The next row is worked as follows from the right side: Work the stitches from the thread in the one side of the piece back onto the double pointed needles, knit up (7) 9-10-11-13 (16-21) stitches in the outermost loop of the outermost stitch along the side of the middle piece, work the (8) 8-10-12-12 (12-12) stitches on the needle (= front), knit up (7) 9-10-11-13 (16-21) stitches in the outermost loop of the outermost stitch along the other side of the middle piece and work the stitches from the other thread back onto the double pointed needles = (44) 48-54-60-64 (74-84) stitches on needle. THE PIECE IS NOW MEASURED FROM HERE! Work a total of (2½) 3-3-4-5 (5-5) cm garter stitch over all the stitches, AT THE SAME TIME when you have worked approx. (1) 1½-1½-2-3 (3-3) cm, insert 1 marker (22) 24-27-30-32 (37-42) stitches along the row (= middle of slipper). Now decrease every 2nd row to finished length as follows:
Knit 1 stitch, knit the next 2 stitches together (= 1 stitch decreased), knit until there are 2 stitches left before the marker, knit together the next 4 stitches 2 and 2 (= 2 stitches decreased), knit until there are 3 stitches left, knit the next 2 stitches together (= 1 stitch decreased), knit 1 stitch (= 4 stitches decreased every 2nd row) = approx. (32) 36-42-48-52 (62-72) stitches.
Cast off and sew the seam under the foot and up along mid back in the outermost loop of the outermost stitch so the seam is flat.
Work 1 more slipper in the same way.

CORD:
Crochet a cord as follows: Work chain stitches with hook size 2.5 mm and BabyMerino for approx. 30-40 cm, turn and work back with 1 slip stitch in each chain stitch. Cut and fasten the strand.
Thread the cord in and out of the row of holes on the slipper (start and finish mid front).

----------------------------------------------------------
For jacket see DROPS number 31-3.
----------------------------------------------------------

Diagram explanations

knit from right side, purl from wrong side = knit from right side, purl from wrong side
knit from wrong side = knit from wrong side
between 2 stitches make 1 yarn over = between 2 stitches make 1 yarn over
slip 1 stitch as if to knit, knit 1, pass the slipped stitch over = slip 1 stitch as if to knit, knit 1, pass the slipped stitch over
knit 2 together = knit 2 together
slip 1 stitch as if to knit, knit 2 together, pass the slipped stitch over = slip 1 stitch as if to knit, knit 2 together, pass the slipped stitch over
knitting direction = knitting direction
Diagram for DROPS Baby 31-4
Diagram for DROPS Baby 31-4

Have you finished this pattern?

Tag your pictures with #dropspattern #odetapants or submit them to the #dropsfan gallery.

Do you need help with this pattern?

You'll find 34 tutorial videos, a Comments/Questions area and more by visiting the pattern on garnstudio.com.
Have you purchased DROPS yarn to make this pattern? Then you are entitled to receive help from the store that sold you the yarn.


© 1982-2025 DROPS Design A/S. We reserve all rights. This document, including all its sub-sections, has copyrights. Read more about what you can do with our patterns at the bottom of each pattern on our site.